Loading...
HomeMy WebLinkAboutPermit Electrical 1981-2-5 ,rnY OF SPRINGFIElD . E LEe T R I C ~ INS PEe T ION R E _R T Same ADDRESS: 1116 South A Street lYPE OF REQUEST: Semi-Annual Electrical CWNER/RENTER: ADDRESS OF INSPECTION: Nicholai Company lYPE OF STRUCTURE: Manufacturinq Plant USE: same HEIGHT DATE: 2-5-81 WIRING METHOD: NON-METALLIC SHEA1HED CABLE -ARMORED CABLE CONDUIT ParlER CO: CHANGES ORDERED: .I MANUFACTURING PLANT: 1. Carpenter Shop Repair defective cords into drill press 2.#1 filter main plant Secure loose conduits 3. Main Plant Bond all control centers 4. Finishing'Dept - Main Plant Seal open K. O. 'sand secure covers. 5. Sandermans Office - Main Plant . Insta 11 3 conductor cord to vent. fan. 6. #1, 3 in 1 dowel machine in main plant. Secure fittings and conduits. Replace cover on junction box above machine. 7. #2 sticker machine'- Main Plant;. Rerlace permanently installed cord with metallic raceway. 8. #3 battery charger control center - Main Plant Seal open K.O. 'so 9. Double moulder - Detailshop -Main Plant Secure all flex connectors. 10. Panel door load center - Main Plant. Seal opening in control panel on balcony and disconnect below balcony. INSPECTOR: ACCQ'<1PAN I ED BY: APPROVED BY: ~I1Y OF SPRINGFIELD E LEe T R I C~ INS PEe T ION R E_R T OtINERlRENTER: ADDRESS: , ADDRESS OF INSPECTION: lYPE OF STRUCTURE: USE: lYPE OF REQUEST: HEIGHT DATE: WIRING METHOD: NON-METALLIC SHEATHED CABLE - ARMORED CABLE CONDUIT PlJr'iER CO: OW4GES ORDERED: 11. #1 panel raiser - Main Plant Repair broken flex (both sides of machine). 12. # 2 Patch bench - Fini shing Department - /la in Pl ant Secure condensor to motor on scissors lift. 13. #2 Patch bench - Finishing Department Repair defective outlet. 14. Double surfacer - Cutting Department - Main Plant Repair flex into control station and into bottom head. motor. 15. #1 moulder - Cutting Department -Main Plant Repa i r fl ex to top head motor. 16. #1 patch saw - Cutting Department '~'Main'Plant Repair defective cord to scissors table, and secure call light switch. 17. #1 cutter - Cutting Department - Main Plant Repair flex to oil valve. 18. Cutters hog belt - Cutting Department - Main Plant Replace motor splice box cover. 19. Lumber hoist - Planer - Yard Department Repair defective flex. 20 Lunch room - Yard Department Install receptacle outlet adjacent to beverage dispenser. INSPECTOR: ACCCMP AN I ED BY: APPROVED BY: CIlY OF SPRINGFIElD E LEe T R I C~ INS PEe T r 0 N R Ef/lR T ~NER/RENTER : ADDRESS: ADDRESS OF INSPECTION: 1YPE OF STRUCTURE: USE: 1YPE OF REQUEST: HEIGHT PATE: WIRING METHOD: NON-METALLIC SHEAiHED CABLE ,- ARMORED CABLE CONDUIT PMR CO: OW4GES ORDERED: 21. Return conveyor - Fire Log Building' Strap loose conduit 22. Battery charger - Fire Log Building Secure outlet box to post. 23. All portable heaters, 1 i ght fi xtures and fans to have cord with ground conductor in all areas. 24. Exit light fixtures, in all areas, to be cleaned and defective lamps replaced. INSPECTOR: Chas. Watson ACCa-IP AN I ED BY: Bob Green APPROVED BY: 4th Period Mfg. Elect.