E LEe T R I C ~ INS PEe T ION R E _R T
Same
ADDRESS: 1116 South A Street
lYPE OF REQUEST: Semi-Annual Electrical
CWNER/RENTER:
ADDRESS OF INSPECTION:
Nicholai Company
lYPE OF STRUCTURE: Manufacturinq Plant USE: same
HEIGHT
DATE: 2-5-81
WIRING METHOD: NON-METALLIC SHEA1HED CABLE -ARMORED CABLE CONDUIT ParlER CO:
CHANGES ORDERED:
.I
MANUFACTURING PLANT:
1. Carpenter Shop
Repair defective cords into drill press
2.#1 filter main plant
Secure loose conduits
3. Main Plant
Bond all control centers
4. Finishing'Dept - Main Plant
Seal open K. O. 'sand secure covers.
5. Sandermans Office - Main Plant
. Insta 11 3 conductor cord to vent. fan.
6. #1, 3 in 1 dowel machine in main plant.
Secure fittings and conduits. Replace cover on junction box above machine.
7. #2 sticker machine'- Main Plant;.
Rerlace permanently installed cord with metallic raceway.
8. #3 battery charger control center - Main Plant
Seal open K.O. 'so
9. Double moulder - Detailshop -Main Plant
Secure all flex connectors.
10. Panel door load center - Main Plant.
Seal opening in control panel on balcony and disconnect below balcony.
INSPECTOR:
ACCQ'<1PAN I ED BY:
APPROVED BY:
~I1Y OF SPRINGFIELD
E LEe T R I C~ INS PEe T ION
R E_R T
OtINERlRENTER:
ADDRESS:
, ADDRESS OF INSPECTION:
lYPE OF STRUCTURE:
USE:
lYPE OF REQUEST:
HEIGHT
DATE:
WIRING METHOD: NON-METALLIC SHEATHED CABLE - ARMORED CABLE CONDUIT PlJr'iER CO:
OW4GES ORDERED:
11. #1 panel raiser - Main Plant
Repair broken flex (both sides of machine).
12. # 2 Patch bench - Fini shing Department - /la in Pl ant
Secure condensor to motor on scissors lift.
13. #2 Patch bench - Finishing Department
Repair defective outlet.
14. Double surfacer - Cutting Department - Main Plant
Repair flex into control station and into bottom head. motor.
15. #1 moulder - Cutting Department -Main Plant
Repa i r fl ex to top head motor.
16. #1 patch saw - Cutting Department '~'Main'Plant
Repair defective cord to scissors table, and secure call light switch.
17. #1 cutter - Cutting Department - Main Plant
Repair flex to oil valve.
18. Cutters hog belt - Cutting Department - Main Plant
Replace motor splice box cover.
19. Lumber hoist - Planer - Yard Department
Repair defective flex.
20 Lunch room - Yard Department
Install receptacle outlet adjacent to beverage dispenser.
INSPECTOR:
ACCCMP AN I ED BY:
APPROVED BY:
CIlY OF SPRINGFIElD
E LEe T R I C~ INS PEe T r 0 N R Ef/lR T
~NER/RENTER :
ADDRESS:
ADDRESS OF INSPECTION:
1YPE OF STRUCTURE:
USE:
1YPE OF REQUEST:
HEIGHT
PATE:
WIRING METHOD: NON-METALLIC SHEAiHED CABLE ,- ARMORED CABLE CONDUIT PMR CO:
OW4GES ORDERED:
21. Return conveyor - Fire Log Building'
Strap loose conduit
22. Battery charger - Fire Log Building
Secure outlet box to post.
23. All portable heaters, 1 i ght fi xtures and fans to have cord with ground conductor
in all areas.
24. Exit light fixtures, in all areas, to be cleaned and defective lamps replaced.
INSPECTOR:
Chas. Watson
ACCa-IP AN I ED BY:
Bob Green
APPROVED BY: