HomeMy WebLinkAboutPermit Building 1992-4-22
?
-
COMMERCIAL/INDUSTRIAL.
PERMIT APPLICATION
~
~i-:D A GLu..e-j- .___
TAX LOTfJl otQN )
--- -- --
.
JOB NUMBER
Cf (2f1 oCPJ
225 Fifth Street, Springfield, Oregon 97477
INSPECTION LINE: 726.3769
OFFICE: 726-3759
LOCATION OF PROPOSI'D WORK: . _ \ D ~ G
ASSESSORS MAP- II ( X~~.l DK~
OWNER l!....c4- f'.J \( Q f\ J\t). V ./ PHON~
ADDRES". , ~ '11) [) fJ ., '* ...1Jt 1 .0 0 1"/\ y/
CITY: ",-IJ~ N' - - STATE: (\..).-(".J ZIP:~
DESCRIPTIONhFw'-RK ~n 1'1'~ ~.Q 1"'f\jJ)(i oj J
NEW REMODEL if- ADDITION DEMOLISH OTHER VALUE:
NAME
ADDRESS
PHONE
ARCHITECT.
CONTRACTOR'S NAME --L... _ n \ ~ ADDRESt\{) D..
GENERAL:~':SALY,O\.\..'~S V. nY..
PLUM BI NG. \\'i"l<\JL......
MECHANICA'. t\nf\.9-...;
CONST.
I~~?NTRACTOR # . EXPIRES
I HUl..Xy ~ .l1h--.~
14'R Q _ {o5lo20
+1,~/q""
PHONE
ELECTRICAl'
PLUMBING
MECHANICAL
I
('~"RQI
I
1
I
I
I
1
1
1
1
$10.00 I
I
NO.
FEE
CHARGE
Nfl I ~~~ I
Single Fixture
Relocated Bldg.
(new fix. addtll
Waler Service
Furnace/burner & vent
<100.000 BTUs
Furnace/burner & vent
> 100.000 BTUs
ft.
Floor furnace and vent
Suspended wall or floor
mounted unit heater
Appliance Vent
separate
Stallonary evap.
cooler
Vent Fan/Single
duct
Vent System apart
from AC or htg.
Mechanical exhaust
hood and duel
Sanitary Sewer
It.
Storm Sewer
It.
Backllow Device
Permit Issuance
TOTAL PERMIT
TOTAL PERMIT
- OFFICE USE -
HANDICAP ACCESS:
FLOOD PLAIN.
ZONING:
LIGHTING POWER BUDGET:
WATER HEATER.
OUAD AREA-
LAND Uc:.I='
# OF BLDGF.
# OF UNITS:
# OF STORIES:
CONSTR. TYP~.
HEAT SOURCF'
OCCY GROUp.
SO FT.
$/SO. FT.
VALUE
so. FTG MAIN
X
so. FTG ACCESS X
SO. FTG OTHER IN7. ~f...?A?PdlFC
TOTAL VALUE OF PROJECT
t ').rfi}CD
J
PLAN CHECK FEf -75. ~ '=?
RCPP
DAT~
BY
1 BUILDING PERMIT
5% State
Surcharge
MECHANICAL
371.5"0
/.95
PLUMBING
DEMOLITION
15% State
Surcharae
1 PAVING
5% State
Surcharge
FENCE
VALUE $
SIDEWALK
CURBCUT
FT.
FT.
SUBTOTAL
PERMITS
SYSTEMS
DEVELOPMENT
7"~ 7/3
TOTAL PERMIT FEES I
EXCLUDING ELECTRICAl
b-f: 9'6
.
REQUIRED INSPECTIONS
.
It is the responsibility of the permit holder to see that all inspections are made at the proper time. To request an inspection, call
726.3769 (recorder), state your City designated job ".umber, job address, type of inspection requested and when you will be ready
for inspection. Requests received before 7:00 a.m. will be made the same working day, requests made after 7:00 a.m. wilt be made
the following work day.
SITE INSPECTION: To be
made after excavation, but
prior to setup of forms.
UNDERSLAB PLUMBING,
ELECTRICAL &
MECHANICAL: To be made
before any work is covered.
ROUGH PLUMBING.
ELECTRICAL &
MECHANICAL: No work is to
be covered until these
inspections have been made
and approved.
PAVING: After gravel is in
place but prior to placing
asphalt or concrete.
FOOTINGS & FOUNDATIONS:
To be made after trenches are
excavated and forms are
erected, all steel in place, but
prior to placing concrete.
FIREPLACE: Prior to placing
facing materials and before
framing Inspection.
SPECIAL INSPECTIONS: In accordance
Section 306 of the State Specialty Code
a special inspector shall be employed
by the Ownerl Contractor during
construction of the following work. A
copy of the special testing reports shall
be furnished to the Building Division.
ATTIC DRAFT STOPS &
CURTAIN WALLS
,(
FRAMING: To be made after
the roof, all framing, fire
blocking and bracing are in
place and all pipes, chimneys
and vents are complete and
the rough electrical, plumbing
and mechanical are approved.
STRUCTURAL CONCRETE: In
excess of 2500 P.S.1. (306 a.1)
CONCRETE SLAB: To be
made after all lnslab building
service equipment, conduit,
piping, accessories and other
ancillary equipment items are
in place but before any
concrete is placed.
STRUCTURAL WELDS:
Performed on the job. (2722 f)
UNDERGROUND: Plumbing,
electrical, gas, sanitary sewer,
storm sewer, water and
d rai nage Ii nes. To be made
prior to covering or filling
trenches.
INSULATION & VAPOR
BARRIER: To be made after all
insulation and required vapor
barriers are In place but
before any lath or gypsum
board interior wall covering is
applied.
HIGH STRENGTH BOLTING:
During all bolt installation and
tightening operations. (306
a.6)
SPRAYED ON
FIREPROOFING: UBG.
Standards 43-8.
UNDERFLOOR: Plumbing,
electrical, mechanical. To be
made prior to installation of
floor insulation, decking or
floor sheathing.
FIRE & SEPARATION WALL:
Located and constructed
according to plans.
SPECIAL GRADING.
EXCAVATION AND FILLING:
During earthwork. (306 a.11 &
Chapter 29)
)<.
LATH AND/OR GYPSUM
BOARD: To be made after all
lathing and gypsum board,
interior and exterior, Is In
place but before any
plastering Is applied or before
gypsum board joints and
fasteners are taped and
finished.
GLU.LAM BEAMS: Inspection
Certificate by an approved
agency, furnished to the City's
Building Division before
beams are placed. (2501 U.B.G.
STDS. 25.10,11).
POST & BEAM: To be made
prior to Installation of floor
insulation, decking or floor
sheathing.
STRUCTURAL MASONRY: (306
a.7)
FLOOR INSULATION &
VAPOR BARRIERS: To be
made prior to installation of
decking or floor sheathing.
SIDEWALK & DRIVEWAY:
Required for all concrete
paving within street right of
way, to be made after all
excavating complete and form
work and sub-base material in
place.
~ In addition to the inspec-
tions specified, the Building
Official may make or require
other inspections of any
construction work to ensure
compliance with the Building,
City or Development Code.
MASONRY: Steel location,
bond beams grouting or
verticals in accordance with
UBC 2415.
ROOF SHEATHING AND
NAILING: Prior to Installing
any roof covering.
CURB AND APPROACH
APRONS: After forms are
erected but prior to placing
concrete.
x
SITE PLAN REVIEW BOARD: Must be requested 2 days in advance
of the date you wish inspection. All project conditions such as
landscaping, parking lot striping, etc. must be completed before
requesttng this Inspection.
FINAL BUILDING: Requested after the final plumbing, electrical,
mechanical and Fire Department Inspections are made and
approved. No occupancy of the premises can be made until a
Certificate of Occupancy has been issued by the Building Division
and posted on the premises.
FINAL PLUMBING
FINAL ELECTRICAL
FINAL MECHANICAL
FINAL FIRE DEPARTMENT
ADDITIONAL COMMENTS:
PLANS REVIEWED BY / /~ 4......~ DATE 7"'-':<-:4- "72
(' //v - / / ".-
By signature, I state and agree, that I have carefully examined the completed application and do hereby certify that all Information
herein is true and correct, and I further certify that any and all work performed shall be done in accordance with the Ordinances
of the City of Springfield, and the Laws of the State of Oregon pertaining to the work described herein, and that NO OCCUPANCY
will be made of any structure without permission of the Building Safety Division. I further certify that only contractors and employees
who are in compliance with ORS 701.055 will be used on this project.
; ~naluro
I further agree to ensur t t all required inspections are requested at the proper time, that project address Is readable from the
street, that the p it card s located at the front of the property, and the approved set of plans will remain on the site at all
sl C :Ion. 0
J .
/
times durin
~
//1 C; .40
~ ~2-"1'
Dal~~2:/9?z
DATE PAID: _~22-h2
RECEIVED BY' . _~~
VALIDATION:
AMOUNT RECEIVED:
RECEIPT ..