Loading...
HomeMy WebLinkAboutPermit Field Test & Inspection Report 2014-07-21Bend Office (541) 330-9155 Geotechnical Office (503) 601-8250 Eugene Office (541) 345-0289 Inc.Carlson Testing, Salem Office (503) 589-1252 Tigard Office (503) 684-3460 Daily Report of Proprietary Anchors Clieul: YORKE & CURTIS - W7ILL MOTT Project: SALVATION ARMY SPRINGFIELD CTI Job th E1901610. Address: 1275 MILL ST SPRINGFIELD Jurisdiction: SPRINGFIELD el'] representative J.M. JOHNSON OBOA 1076 was on site this date Jul. 21, 2014 to perform Special Inspection for: pernnit 811-SPR2014-01121 DPS H(s) PO Number: 21404 (PO 9 & JOB #I 1. Checked in with superintendent or client representative. Nape: WILL MOTT Conlpaoy: YORKE AND CURTIS 2, Inspection was "IBC" ❑x Continuous ❑ Periodic PROPRIETARY ANCHORS YesNoN/A L2. I. _Reviewed previous inspection reports? x Reviewed evaluation report?I x Verified following items meet manufacturer's published. installation instructions, 3. Verified minimum embedment depth of the anchors. 4.Verified installation of the anchors. x x --5. Verified anchor diameter. x 6. Verified steel grade. hole diameter. x _7._Verili—ed _ 8. Verified type of drill bit used. x — 9. Verified hole cleaning method. 10. Verified adhesive application, x 11. 12. Verified edge distance. Verified spacing. x x Ix 13. Verified installation torque. Evaluation report number & dale: Name of product being installed Batch Number 09IR186R INpiration Date 4-2016 lines, elevations (floors) and drawing details]: PER S2.1 DATED 04/18/14, (3) 5/8" SIMPSON AB446 ALL THREAD ANCHORS WERE INSTALLED TO A 9" EMBEDMENT ALONG GRIDLINE B BETWEEN 5.2 AND 7. 1/2" ALL THREAD WAS INSTALLED TO AN 8" EMBEDMENT AT THE LOCATION CALLED OUT ON S1.1 FOUNDATION KEYNOTES 6 & 7 AND S/S2.1 PER 3/S2.1 AND 4/S2.1, N4 BARS WERE INSTALLED AT 24" ON CENTER TO AN EMBEDMENT DEPTH OF 3 1/2". REPORT SUMMARY 1. Work inspected was: [X-] Completed ❑ In progress 2. Completed work inspected was fn complimice with ❑ Approved plans and specifications ❑ Shop drawings ❑ RPI ❑ Design change ❑ Submittal ❑ N/A Document #(s) S2.1 Dated: 04/18/14 3. Noncompliance itenn(s) were noted this date, details on following page(s). ❑ Yes Q No ❑ N/A 4. Noncompliance item(s) were reinspected this dale, details on following page(s). ❑ Yes ❑ No ❑ NIA ❑ Conform ❑ Remain in progress Report(s) findings were discussed and left with of YORKE AND CURTIS _ Based on the Code, approval is required from the Building Official before the SPECIAL INSPECI'ED items noted above can be covered. Carlson Testing has no authority to direct work of contractors or subcontractors. ❑ See additional report page(s). ❑ Distribute attachments. Page of Daily Report of Proprietary Anchors CTI Job #: E1401610. Project: SALVATION ARMY SPRINGFIELD Notes: In some cases more than one box may be checked for a given iteral on the front page. For: 07/21/2019 Our reports pertain to the material tested/inspected on ly. I nformation contained herein is not to be reproduced, except in ful I, without prior authorization fron this office. Underal I ei rcumstances, the information contained in this report is provided subject to al I terms and coed itions ofCTI's General Conditions in effect at the ti me this repot is prepared. No party other than those to whom CTI has distributed this repot shat l be entitled to use o• rely upon the infonuation contai tied in th is document. If there are any further questions regarding th is matter, please do not hesitate to contact th is office. Respectfully submitted, CA RLSON TI;S'f ING, INC. David Smith Project Manager JJ/SJH CC: YORKE & CURTIS - WILL MOTT CITY OF SPRINGFIELD BUILDING DEPARTMENT YORKE & CURTIS - WILI. NOTT 89970 HWY 99N, EUGENE OR Reviewed By: Project Manager Review Date: 07/23/2014 WILLWYORKEANDCURTIS.CUN RCASTILE@SPRINGFIELD-OR.GOV