HomeMy WebLinkAboutBuilding Field Test & Inspection Report 2014-07-16Bend Office (541) 330-9155
Geotechnical Office (503) 601-8250
Eugene Office (541) 345-0289
Carlson Testing Inc.Salem Office (503)58-1252
� Tigard Office (503) 6844-3460
Special Inspection
FINAL SUMMARY LETTER
July 16, 2014
City of Springfield
225 Fifth Street
Springfield, OR 97477
1625 Mohawk Blvd.
Springfield, OR
Permit No.: 811 -SPR -2013-01219
Dear Sir:
Per Chapter 17, Section 1704.1.2 of the International Building Code (IBC), we have performed special
inspection of the following item(s) per our inspection reports only:
Reinforced Concrete
Proprietary Anchors -- Adhesive
Structural Masonry
Structural Steel -- Shop/Field (Includes verification of welder certifications, weld procedures and material certifications)
Structural Wood
The non-compliance (NC) items recorded for each of the above inspection categories, as listed on the non-
compliance report, have been either repaired and re -inspected by CTI for compliance, or reviewed and
accepted by the engineer of record for the project in the "As -Built" condition or through RFI.
The issuance of this final report is based on the engineer's acceptance of the NC items not specifically re-
inspected by CTI. CTI did not provide any additional review or re -inspection of those items beyond the
inspections that initially generated each of these individual items on the non-compliance list. The engineer
of record has provided the acceptance of the non-compliance items and as -built conditions.
All requested inspections and tests were performed and reported according to the requirements of Project
Documents and, to the best of our knowledge, the work was in conformance with the approved plans and
specifications, approved change orders and applicable workmanship provisions of the State Building Code
and Standards, as well as the structural engineer's design changes, approvals and verbal instructions.
Our construction inspection and testing services were provided and intended to help reduce the risk of
construction defects, deficiencies, or omissions that arise during and after construction. Our services do
not constitute a warranty or guarantee of any type. Even with diligent construction monitoring and testing,
construction defects, deficiencies, or omissions in the Contractor's work may exist. It is the Contractor's
responsibility to perform their work in accordance with the approved construction documents.
CTI has provided its professional services with the degree of care and skill currently exercised under similar
circumstances by members of its profession in the same locale. Statements made in our reports are based
on technical judgments, and should not be construed to be conclusive representations of fact. Our reports
pertain to the material tested/inspected only.
CTI's services did not include responsibilities related to determining, supervising, implementing or
controlling the means, methods, techniques, sequences or procedures of the construction or evaluating or
reporting job conditions related to health, safety or welfare.
Information contained herein is not to be reproduced, except in full, without prior authorization from this
office. If there are any further questions regarding this matter, please do not hesitate to contact this office.
Respectfully submitted,
CARLSON TESTING, INC.
Dan Brown
Eugene Branch manager
113
cc: Dave Brookhart I Inline Commercial Construction daveb@inline-cc.com
Jacob Flint / Inline Commercial Construction jacobf@inline-cc.com