HomeMy WebLinkAboutPermit Mechanical 2014-07-28SPRINGFIELD -'
EXPIRES: 01/23/2015
225 Fifth Sl
1'
CITY OF SPRINGFIELD
Springfield,OR97477
ASSESOR'S PARCEL NO: 1703353200100 TYPE OF STRUCTURE: Commercial
PROJECT DESCRIPTION: Install ductless split system in the server room
Phone: 541-726-3753
" OHEeON
Building / Commercial Permit
Inspection Phone: 541-726-3769
SPRINGFIELD OR 97478
Fax: 541-726-3676
CONTRACTOR INFORMATION
PERMIT NO: 811-SPR2014-01614
Contractor Type Contractor Name Lie Type
w vspringfield-or.gov
Mechanical Contractor TEMP CONTROL MECHANICAL SERVICE CORP CCB
permitcenter@spdngfield-or.gov
PROJECT STATUS: Issued ISSUED: 07/28/2014
EXPIRES: 01/23/2015
STATUS DATE: 07/28/2014 APPLIED: 07/28/2014
SITE ADDRESS: 221 B ST, Springfield, OR 97477
SCOPE: Mechanical Only
ASSESOR'S PARCEL NO: 1703353200100 TYPE OF STRUCTURE: Commercial
PROJECT DESCRIPTION: Install ductless split system in the server room
OWNER: RUDY POWELL FAMILY TRUST
Phone Number:
ADDRESS: 35893 ELLINGTON DR
SPRINGFIELD OR 97478
CONTRACTOR INFORMATION
Contractor Type Contractor Name Lie Type
Lie No Lie Exp Phone
Mechanical Contractor TEMP CONTROL MECHANICAL SERVICE CORP CCB
103165 11/23/2014 503-285-6139
INSPECTIONS REQUIRED
Inspections
2300 Rough Mechanical Rough Mechanical: Prior to Cover
2999 Final Mechanical Final Mechanical: When all mechanical work is complete.
By signature, I state and agree, that I have carefully examined the completed application and do hereby certify that all
information hereon is true and correct, and I further certify that any and all work performed shall be done in accordance with the
Ordinances of the City of Springfield and the Laws of the State or Oregon pertaining to the work described herein, and that NO
OCCUPANCY will be made of any structure without permission of the Community Services Division, Building Safety. I further
certify that only contractors and employees who are in compliance with ORS 701.005 will be used on this project. I further agree
to ensure that all required inspections are requested at the proper time, that each address is readable from the street, that the
permit card i� located at the front of the property, and the, approved set of plans will remain on the site at all times during
construction.
,A,�(,�
Owner or Contractor Signature
pTTE 111014: Oregon law requires you t,
follow 'rules adopted by the Orego =1
Notlfioatlon Center, Those rules are se r
In OAR 952.001-0010 through OAR 952.001 -
0090. You may obtain copies of the rules by
calling the center. (Note: the telent�o11e
number for the Oregon Utility Notiticatiorf
Center is 1.800 332 2344).
Date
NOTICE:
THIS PERMIT SHAM EXPIRE IPTHE WORK
AUTHORIZED UNDER THIS PERMIT IS NOT
COMMENCED OR IS ABANDONED FOR
ANY 180 DAY PERIOD.
Springfield Building Permit 7/28/2014 1:10:50PM Page 1 of 1
LNELOCITY OP SPRINGFIELD
- 225 Fifth St
TRANSACTION RECEIPT Spnngfield,OR97477
OREGON 541-726-3753
811-SPR2014-01614
v Y.springfield-or.gov 221 B ST permitcenler@spnngfield-or.gov
RECEIPT NO: 2014001612 RECORD NO: 811-SPR2014.01614 DATE: 07/28/2014
DESCRIPTION ACCOUNT CODEITRANS CODE AMOUNT DUETi
Continuing Education Fee 224-00000-425606 2.50
Mechanical Permit fee (based on value of work) 224-00000-425604 1006
State of Oregon Surcharge (12% of applicable fees) 821-00000-215004 1099
145.13
17.42
Technology fee (5% of permit total) 100-00000-425605 2099 7.26
TOTAL DUE: 172.31
PAYMENTTYPE PAYOR CASHIEWDBOWLSBY COMMENTS AMOUNTPAID
__--Credit Card -matt c000er tcros corn -- -- -- - 172.31
665525
TOTAL PAID: 172.31
Mechanical Permit Application RN
bcSEW IV,
ri� -
This permit is issued under OAR 918-440-0050. Permits expire if work is not started within 180 days of issuance or if work is
suspended for 180 days.
'GA7EGOJ2Y'IJ� CONSTRUCTION -' ; - , ,. =
❑ Residential Government ❑ Commercial
JOB: SjTE; tNF0i2hAATiON ;AND. LOCATION .
Job site address: V2 / (j S hre e /
City: S r,•n�
State: 0 Q
ZIP: qJ y9%
Ref leee, 514 r �- Q n t
DESCRIPTION ,Ok WORK
qS//a c < rt t /'t
S J yer7 r'e? tie Sari/rt— F00112
PROPERTY -OWNER
Name: aw Et� 134ws. /
Address:
City: I State:( ZIP:
Phone: - - Fax: - -
E-mail:
This installation is being made on property owned by me or a
member of my immediate family, and is exempt from licensing
requirements under ORS 701.010.
Signature:
CONTRACTOR INSTALLATION
Business name: T G
Address: 91
City:
State: to
zip: 971/oz
Phone:5 /-316 3 d' Z
Fax:f'y - 3 O!
E-mail: /—,-7q /f c o o F �C MS Co f, L v M
CCB license no,: 03 � S
Print name: /"71% f j Coo o r
Signature:
J
440-25451 (5/21/2014/COM)
W_
(Z
Residential < ��,,
,Cost
Total ,
First Avoliance
$82.00
$
Furnace/burner including ducts and vents
Up to 100k BTUAv.
$19.00
S
Over t00k BTU/hr.
Heaters/stoygSLycnts
Unit heater
$2200.
$19.00
S
S
Wood/pellet/gas stove/flue
$43.00
S
Repair/alter/add to heating appliance/
refrigeration unit or cooling system/
absorntion system
$82.00
$
Evaporated cooler
$15.00
S
Vent fan with one ductlappliance
$10.00
$
Hood with exhaust and duct
515.00
S
Floor fhmace including vent
582.00
$
Gas piping
One to four outlets 1
1 $8.00
$
Additional outlets (each) I
1 $5.001
S
Air -handling units includinR ducts
Up to 10,000 CFM
1 $12.00
S
Over 10,000 CFM
$22.00
S
Com ressor/absor rtion s stem/l at
um
Up to 3 hp/100k BTU
$19.00
$
Up to 15 hp/500k BTU
$33.00
$
Up to 30 hp/1,000 BTU
$49.00
S
Up to 50 hp/1,750 BTU
584.00
Over 50 hp/1,750 BTU
$107.00
$
Incinerators
Domestic incinerator
$22,50
$
Goinmercial ..'
Enter total valuation of me I icalfystem
and instattation costs$ SO���
Enter fee based on valuation of mechanical system, etc.
S
INiseellaneousfiees tiem
_.
Cost,.'
ea,
cost ..:
Reinspection
$82.00
$
Specially requested inspections (pe
$82.00
S
Regulated equipment (unclassed)
$15.00
S
Each additional inspection: (1)
$82,00
$
APPLICANT: USE-
v
(A) Enter subtotal of above fees (or enter set
min
minimum fee of S 82.00
$
�/
(B) Investigative fee (equal to [A])
$
(C) Enter 12% surcharge (.12 x [A+B])
$
(D) Seismic fee, I % (.01 x [A])
S
?i
(E) Technology Fee (5% of [A])
$
(F) Continuing Education Fee $2.50
$2.50
TOTAL fees and surcharges (A through F): $
W_
(Z
ci/Cy0/7
Function
Stylish, slim and elegant, these cooling -
only wall mounted units are designed for
single rooms. Indoor units have a clean,
aesthetic design and are small but mighty
\ and shorter in length than competing units
helping them blend into any room.
-I
AOU18CL
Min. -Max- Cooling BTU/h
SEER BTU/hW
EER C/g
Standard Features Clg. Operating Range Til
Wireless Remote Control Moisture Removal PIA(M)
® Apple Catechin Filter Voltage/Frequency/Phase
Ion Deoderizing Filter Recommended Fuse Size (A)
Air Circ. C.F.M. w1h): Hi
Sleep Timer Medium
24 -Hour Timer ? Low
Weekly Timer Quiet
L, Dry Mode % Noise Level dB(A): Hi
® Auto Louver: Up/Down*
3 Auto Louver: 4 Way"
® Auto Mode
Quiet Mode
Power Diffuser
® Auto Restart/Reset
Low Ambient Cooling
Long Piping Length"
® Pump Down Operation"
vo 31d Party Device Control"
•Available only wilb optional wired remote controller.
+ Feature of 18CL only.
^ Feature of 24CL7, 30CLXI, 36CLXI only. Operation monitoring
and On/OO control 9111).
"Feature of 30CLX1 and 36CLX1 Dory.
Optional Wired Remote
❑ Weekly Timer
❑ Full Function Wired Remote
❑ Child Lock Capable
ear ear
/NVS/ArBii W
WARRANTY 11I1t t/,XTT
Syystem Systems
18CL 24CL7,
30/36CLX1
19.0
10.4
14116
(-10-46)
5.9 (2.8)
208-230/60/1
20
412 (700)
342 (581)'
271 (460)
218 (370)
44
Medium
38
Low
32
Quiet
25
Outdoor Fan Speed RPM Clg
860,
Outdoor Noise Level dB(A)
50
Current Ratec Max (A): Cooling
7.7/9.0
Pourer Use rtaaulmar(1,v4: Cooling
1.7312.0
Fan Speeds Stage
4 +Auto
Air Direction: Horizontal
Manual
Vertical
Automatic
Air Filter
Washable
Connection Method
Flare
Combined Min. Lgth Ft (m)
9(2.7)
Combined Max. Lgth Ft (m) 66(20)
(pre-.charge:4'
Max. Vertical Diff. F1 (m)
Conn. Pipe Diameter Inch Sue. 112 Dis. 11416114. 5
Net Weight lbs. (kg) 20 (9) 88 (40416'
pr
30CLX1/36CLX1
AOU30CLX1
AOU36CLX1
16.5
9.5
14--115
(-10-46)
9.7 (4.6)
208-230/60/1
30
660 (1,100)
530 (900)
435 (740)
365 (620)
49
42
37
33
2,119
54
14.2/17.0
-- 3.24/3.87
4 +Auto.._.
Automatic
Automatic
Washable
Flare
16 (5)
- 98(30)
40).31 (14) 135(61)
11612-518 32-3/4
0 320 830
118 39-114 35-3/8
t0 998 900
3/4 9 13
IB ' 228 330
R41 0A
0 0 )
N � 0 0
O O=
a Q Q
Note: Figures are based on 230 Volts.
3
El
Dimensions: Height Inch 10.13116 22.3/4 .12-51
;?
mm
275 578
320
Width Inch
M-118 31-1/8
39-11
mm
790 790
988
UTY-RNBYU
Depth Inch
8.7/16 11.18116
0
mm
215 300
228
Relrigemnt
R410A
F
o U
J
9m 12
v0
N OO
Q Q
�
Q
30CLX1/36CLX1
AOU30CLX1
AOU36CLX1
16.5
9.5
14--115
(-10-46)
9.7 (4.6)
208-230/60/1
30
660 (1,100)
530 (900)
435 (740)
365 (620)
49
42
37
33
2,119
54
14.2/17.0
-- 3.24/3.87
4 +Auto.._.
Automatic
Automatic
Washable
Flare
16 (5)
- 98(30)
40).31 (14) 135(61)
11612-518 32-3/4
0 320 830
118 39-114 35-3/8
t0 998 900
3/4 9 13
IB ' 228 330
R41 0A
0 0 )
N � 0 0
O O=
a Q Q
Note: Figures are based on 230 Volts.
3
El
2009 IECC
sir/ -/G /y
Generated by COMcheck-Web Software
Mechanical Compliance Certificate
Section 1: Project Information
Project Type: Addition
Project Title : Head Start B Street Server room a/c
Section 2: General Information
Building Location (for weather data): Springfield, Oregon
Climate Zone: 4c
Section 3: Mechanical Systems List
Quantity $ stkim Type & Description
HVAC System (Unknown) :
Cooling: 1 each - Split System, Capacity = 24 kBtu/h, Air -Cooled Condenser, No Economizer, Economizer
exception: None
Proposed Efficiency = 10.00 SEER, Required Efficiency = 13.00 SEER
Fan System: FAN SYSTEM 1 -- Compliance (Motor nameplate HP method) : Passes
Fans:
FAN 1 Supply, Single -Zone VAV, 659 CFM, 1.0 motor nameplate hp
SYSTEM COMPLIANCE FAILS: PROPOSED EFFICIENCY FAILS TO MEET CODE REQUIREMENTS.
Section 4: Requirements Checklist
211-
/Requirements Specific To: HVAC System :
Equipment minimum efficiency: Split System: 13.00 SEER
Generic Requirements: Must be met by all systems to which the requirement is applicable:
Plant equipment and system capacity no greater than needed to meet loads
Excep/ttiJion(s):
/QStandby equipment automatically off when primary system Is operating
0"2.
/ Q�Aulliple units controlled to sequence operation as a function of load
Minimum one temperature control device per system
U 3. Minimum one humidity control device per installed humidification/dehumidification system
&<-Load calculations per ASHRAE/ACCA Standard 183.
Automatic Controls: Setback to 55°F (heat) and 85°F (cool); 7 -day clock, 2 -hour occupant override, 10 -hour backup
Except' (s):
�,(� Continuously operating zones
Kp V. Outside -air source for ventilation; system capable of reducing OSA to required minimum
oh'/IL R-5 supply and return air duct Insulation in unconditioned spaces
R-8 supply and return air duct insulation outside the building
R-8 Insulation between ducts and the building exterior when ducts are part of a building assembly
Exception(s):
ruk Ducts located within equipment
Project Title: Head Start B Street Server room a/c Report date: 07/25/14
Data filename: Page 7 of 10
AW—Ducts with interior and exterior temperature difference not exceeding 15°F.
Mechanical fasteners and sealants used to connect ducts and air distribution equipment
. Ducts seated - longitudinal seams on rigid ducts; transverse seams on all ducts; UL 181A or 1818 tapes and mastics
.Hot water pipe insulation: 1.5 in. for pipes <=1.5 in. and 2 in. for pipes >1.5 in.
Chilled water/refrigerant/brine pipe insulation: 1.5 in. for pipes <=1.5 in. and 1.5 in. for pipes >1.5 in.
Steam pipe insulation: 1.5 in. for pipes <=1.5 in. and 3 in. for pipes >1.5 in.
Exception(s):
Piping within HVAC equipment.
Fluid temperatures between 55 and 105°F.
Fluid not heated or cooled with renewable energy.
ePiping within room fan -coil (with AHR1440 rating) and unit ventilators (with AHR1840 rating).
?VRunouts <4 ft in length.
11.Operation and maintenance manual provided to building owner
Balancing devices provided in accordance with IMC 603.17
. Demand control ventilation (DCV) present for high design occupancy areas (>40 person(1000 ft2 in spaces >500 ft2) and served by
systems with any one of 1) an air -side economizer, 2) automatic modulating control of the outdoor air damper, or 3) a design outdoor
airflow greater than 3000 cfm.
Systems with heat recovery.
Multiple -zone systems without DDC of individual zones communicating with a central control panel.
Systems with a design outdoor airflow less than 1200 cfm.
Spaces where the supply airflow rate minus any makeup or outgoing transfer air requirement is less than 1200 cfm.
p7,pu 4.Motorized, automatic shutoff dampers required on exhaust and outdoor air supply openings
Exception(s):
Gravity dampers acceptable in buildings <3 stories
15.Automatic controls for freeze protection systems present
.Exhaust air heal recovery included for systems 5,000 cfm or greater with more than 70% outside air fraction or specifically exempted
Exception(s):
. Hazardous exhaust systems, commercial kitchen and clothes dryer exhaust systems that the International Mechanical Code
prohibits the use of energy recovery systems.
Systems serving spaces that are heated and not cooled to less than 60°F.
AW -Where more than 60 percent of the outdoor heating energy is provided from site -recovered or site solar energy.
IN, Heating systems in climates with less than 3600 HDD,
ooling systems in climates with a 1 percent cooling design wet -bulb temperature less than 64°F.
Systems requiring dehumidification that employ energy recovery in series with the cooling coil.
AxLaboratory fume hood exhaust systems that have either a variable air volume system capable of reducing exhaust and makeup air
�1` / volume to 50 percent or less of design values or, a separate make up air supply meeting the following makeup air requirements:
a) at least 75 percent of exhaust flow rale, b) heated to no more than 2°F below room setpoint temperature, c) cooled to no lower
than 3°F above room selpolnl temperature, d) no humidification added, e) no simultaneous healing and cooling.
Project Title: Head Start B Street Server room a/c Report date: 07/25/14
Data filename: Page 8 of 10
Generated by C®Mcheck-Web Software
Mechanical Requirements
Description
2009 IECC
The following list provides more detailed descriptions of the requirements in Section 4 of the Mechanical Compliance
Certificate.
Requirements Specific To: HVAC System
1. Equipment minimum efficiency:
Generic Requirements: Must be met by all systems to which the requirement is applicable:
Exception(s):
- The equipment and/or system capacity maybe greater than calculated loads for standby purposes. Standby equipment must be
automatically controlled to be off when the primary equipment and/or system Is operating.
- Multiple units of the same equipment type whose combined capacities exceed the calculated load are allowed if they are provided
with controls to sequence operation of the units as the load increases or decreases.
2. Minimum one temperature control device per system
3. Minimum one humidity control device per installed humidification/dehumidification system
4. Load calculations per ASHRAE/ACCA Standard 183.
5. Automatic Controls: Setback to 55°F (heat) and 85°F (cool); 7 -day clock, 2 -hour occupant override, 10 -hour backup
Exception(s):
- A setback or shutoff control is not required on thermostats that control systems serving areas that operate continuously.
6. Outside -air source for ventilation; system capable of reducing OSA to required minimum
7. R-5 supply and return air duct insulation in unconditioned spaces
R-8 supply and return air duct insulation outside the building
R-8 insulation between ducts and the building exterior when ducts are part of a building assembly
Exception(s):
- Duct insulation is not required on ducts located within equipment.
- Duct insulation is not required when the design temperature difference between the interior and exterior of the duct or plenum does
not exceed 15°F.
8. Mechanical fasteners and sealants used to connect ducts and air distribution equipment
9. Ducts sealed - longitudinal seams on rigid ducts; transverse seams on all ducts; UL 181A or 181 B tapes and mastics
10. Hot water pipe insulation: 1.5 in. for pipes <=1.5 in. and 2 in. for pipes >1.5 in.
Chilled water/refrigerant/brine pipe Insulation: 1.5 in. for pipes <=1.5 In. and 1.5 in. for pipes >1.5 in.
Steam pipe insulation: 1.5 in. for pipes <=1.5 in. and 3 in. for pipes >1.5 in.
Exception(s):
- Pipe insulation is not required for factory -installed piping within HVAC equipment.
- Pipe insulation Is not required for piping that conveys fluids having a design operating temperature range between 55°F and 105°F.
- Pipe insulation is not required for piping that conveys Fluids that have not been heated or cooled through the use of fossil fuels or
electric power.
- Piping within room fan -coil (with AHR1440 rating) and unit ventilators (with AHR1840 rating).
- Pipe insulation is not required for runout piping not exceeding 4 ft in length and 1 in, in diameter between the control valve and HVAC
coil.
11. Operation and maintenance manual provided to building owner
12. Balancing devices provided in accordance with IMC 603.17
13. Demand control ventilation (DCV) present for high design occupancy areas (>40 person/1000 112 in spaces >500 1`12) and served by
systems with any one of 1) an air -side economizer, 2) automatic modulating control of the outdoor air damper, or 3) a design outdoor
airflow greater than 3000 cm.
Exception(s):
- Systems with heat recovery.
- Multiple -zone systems without DDC of individual zones communicating with a central control panel.
- Systems with a design outdoor airflow less than 1200 cfm.
Project Title: Head Start B Street Server room a/c Report dale: 07/25114
Data filename: Page 9 of 10
- Spaces where the supply airflow rale minus any makeup or outgoing transfer air requirement is less than 1200 cfm.
14. Motorized, automatic shutoff dampers required on exhaust and outdoor air supply openings
Exception(s):
- Gravity (non -motorized) dampers are acceptable in buildings less than three stories in height.
15. Automatic controls for freeze protection systems present
16. Exhaust air heat recovery included for systems 5,000 cfm or greater with more than 70% outside air fraction or specifically exempted
Exception(s):
Hazardous exhaust systems, commercial kitchen and clothes dryer exhaust systems that the International Mechanical Code prohibits
the use of energy recovery systems.
Systems serving spaces that are heated and not cooled to less than 60'F.
Where more than 60 percent of the outdoor heating energy is provided from site -recovered or site solar energy.
Heating systems in climates with less than 3600 HDD.
Cooling systems in climates with a 1 percent cooling design wet -bulb temperature less than 64°F.
Systems requiring dehumidification that employ energy recovery in series with the cooling coil..
Laboratory fume hood exhaust systems that have either a variable air volume system capable of reducing exhaust and makeup air
volume to 50 percent or less of design values or, a separate make up air supply meeting the following makeup air requirements: a)
3°F above room setpoint temperature, d) no humidification added, e) no simultaneous heating and cooling.
Project Title: Head Start B Street Server room a/c Report date: 07/25/14
Data filename: Page 10 of 10
DEVELOPMENT SERVICES DEPARTMENT
Application Date:
Permit #:
Installation Address:
COMMERCIAL MECHANICAL PERMIT WORKSHEET
G O N 225 FIFTH STREET
SPRINGFIELD, OR 97477
PHONE (541)726-3753
FAX (541)726-3676
www.spnngfield-or.gov
In order to determine code compliance of the proposed installation please provide the following information in
addition to the permit application: 1) Legible copies of the new equipment's manufacturer's listing, cutsheets
and installation instructions, 2) ComCheck energy compliance forms, and 3) *when required, wet -signed
engineering calculations and structural details for seismic bracing. Please complete all fields- use N/A where
Old Equipment New or Replacement Equipment*
Type & Model FaJ i f -s k 2 I/CL /
Unit Weight* 88 6s
Capacity (BTU, Ton, etc.) Z 7'0
h
Efficiency Rating (BSPF, SEER, etc.) �, S S Ce 2
Outdoor Air supplied (CFM)** 1V 0q
Ventilation supplied (CFM)** 6.�/! CFN%
Exhaust Rate (CFM)** /nv/7 Ar- ��
Structural Seismic Bracing* ❑Yes ❑ No Oyes 14o
Is this installation within a Special Flood Hazard Area as determined by FEMA? ❑Yes 0N0
Prepared and signed by: Building Owner ❑ Contractor b Design Professional ❑
I certify that the information provided above is complete and accurate to the best of my knowledge:
Date: 7 zs z o
Print Name: 1`74 /f&�'
CCB or Design Professional
* New and replacement equipment shall have seismic bracing designed by an Oregon Registered Engineer and installed in accordance
with the Engineer's design per OSSC 1613.7.6, 1613.7.7 and ASCE 7-05 section 13.1.4,
Exceptions:
I. Equipment weighing 400 pounds or less and mounted 4 feet or less above a floor or roof level.
2. Components weighing 75 pounds or less. (5 pounds for distribution systems)
3. Replacement equipment which weighs the same or less than the equipment it replaces, uses the same seismic
attachment and bracing, and is installed in the exact same location as the old equipment will be field -evaluated by the
Inspector for compliance. Additional bracing and accompanying engineering may be required based on the
Inspector's evaluation. The original Engineering for the replaced equipment if provided for review may be
acceptable.
**If outdoor air supply, ventilation or exhaust rate is reduced, provide calculations, specifications and plans for the mechanical
ventilation system including the required outdoor air ventilation and the required exhaust ventilation showing compliance with OMSC
Section 403/1 -able 403.3