Loading...
HomeMy WebLinkAboutPermit Building 2014-07-17SPRINGFIELD225 Fifth St CITY OF SPRINGFIELD Springfield,OR 97477 Phone: 541-726-3753 oeBGON Building / Commercial Permit Inspection Phone: 541-726-3769 Fax: 541-726-3676 PERMIT NO: 811-SPR2014-01546 vmnv.spdngfield-ocgov permitcenter@springfield-ocgov PROJECT STATUS: Issued ISSUED: 0711712014 EXPIRES: 01/12/2015 STATUS DATE: 07/17/2014 APPLIED: 07/17/2014 SITE ADDRESS: 1360 MOHAWK BLVD, Springfield, OR 97477 SCOPE: ReRoof ASSESOR'S PARCEL NO: 1703253310000 TYPE OF STRUCTURE: Commercial OWNER: PRIME PROPERTY INVESTMENTS LLC ADDRESS: 1360 MOHAWK BLVD Phone Number: SPRINGFIELD OR 97477 CONTRACTOR INFORMATION Contractor Type Contractor Name Lic Type Lic No Lic Exp Phone General Contractor RIVER ROOFING INC CCB 79016 01/06/2016 541-746-5000 INSPECTIONS REQUIRED Inspections 1630 Roof Sheathing Roof Sheathing 1999 Final Building Final Building: After all required inspections have been requested and approved and the building is complete. By signature, I state and agree, that I have carefully examined the completed application and do hereby certify that all information hereon is true and correct, and I further certify that any and all work performed shall be done in accordance with the Ordinances of the City of Springfield and the Laws of the State or Oregon pertaining to the work described herein, and that NO OCCUPANCY will be made of any structure without permission of the Community Services Division, Building Safety. I further certify that only contractors and employees who are in compliance with ORS 701.005 will be used on this project. I further agree to ensure that all required inspections are requested at the proper time, that each address is readable from the street, that the permit card is located at the front of the property, and the approved set of plans will remain on the site at all times during construction. Ownertractor Signature v ATTENTION: Oregon law requires you to follow rules adopted by the Oregon Utility Notification Center. Those rules are set forth In OAR 952-001-0010 through OAR 952-001- 0090, You may obtain copies of the rules by calling the center. (Note: the telephone number for is 1-800. 32-23 utility Notification Center Date o', SHALL EXPIRE IF THE WORK AUTIiORIZED UNDER THIS PERMIT IS NOT COIAMENCED OR IS ABANDONED FOR ANY 180 DAY PERIOD. Springfield Building Permit 7/17/2014 2:5B:56PM Page 1 of i SPRINGFIELD CITY OF SPRINGFIELD ! ae 225 Fifth St TRANSACTION RECEIPT Springfield,OR 97477 OREGON 541-726-3753 811-S P R2014-01546 mm.springfield-or.gov 1360 MOHAWK BLVD permitcenter@spdngfield-or.gov RECEIPT NO: 2014001547 RECORD NO: 811-SPR2014.01546 DATE: 07/17/2014 DESCRIPTION ACCOUNT CODE/TRANS CODE AMOUNT DUE Building Permit Fee 224-00000-425602 1002 324.00 Continuing Education 224-00000-425606 2.50 State of Oregon Surcharge (12% of applicable fees) 821-00000-215004 1099 38.88 Technology fee (5% of permit total) 100-00000-425605 2099 16.20 TOTAL DUE: 381.58 Check RIVER ROOFING INC 381.58 33179 TOTAL PAID: 381.58 Dear Customer, ----=_ We propose to furnish all materials and perform all labor necessary to complete the following: (OPT ION A: 1:Install -1650mi1 PVC_Mechanically fastened membrane roofing system - White, over one (1) layer fire rated base sheet, over existing roof. _ _ 2. New system will encapsulate parapet walls, terminating onto new outer edge metal flashings. grease fans. 3. Install chemical resistant membrane around two (2) g 4. Install protectiontwalk pads to and around HVAC units. 5. Install new pressure treated support blocks. 6. Install new base flashings for pipes, vents and rooftop units. 7. Remove two (2) vents on south side. 8. 15 year warranty on IB material. 9. Install tapered insulation around old angle iron supports on top of parapet wall. 10. Provide permits. 11. Remove our roofing debris from job site. BID PRICE: $24,100.00 OPTION B: 1. Same as Option A except install TPO 60mll mechanically fastened membrane roofing. 2. 20 year warranty on TPO material. BID PRICE: $22,900.00 Notes: 1) Electrical conduit on top of parapet walls relocated by owner's representative or by River Roofing on a time and materials basis. 2) Remove and reinstall satellite as required, realignment, if needed, to be done by others. 3) To remove old roofing and install new membrane roofing system over 1/4" fire rated DensDeck, add $9,500.00 to either option. Price good for 30 days. Workmanship is guaranteed for five (5) years. Manufacturers roofing warranty is as stated above. During demolition debris may sift Into attic areas. Please take measure to cover valuables. For Visa/MC, add 3% surcharge. Payment to be made as follows: El Total due upon completion LXDeposit of 10% with balance due upon substantial completion In the event it becomes necessary to employ an attorney or institute a lawsuit to collect any payment due River Roofing under this Agreement or any modification to this Agreement, River Roofing shall be entitled to recover its attorney fees, costs and disbursements incurred. A late payment charge of 2% per month will be added to any account not paid in full within 10 days after billing. A rebilling chargd of $25 will be added to all past due accounts. An administrative fee of 25°5 will be assessed on all deposits if job is cancelled. Visa/MC for deposits only. The proposal set forth above may be withdrawn by River Roofing if not accepted within 30 days. The terms and conditions on the reverse are part of this contract. (1 C mfr-- jrcrte 13, 2014 Acceptance to furnish all materials and labor required to complete the work specified in the above proposal. I agree to pay the You are hereby authorized d on amount sped' eve, a ending to the tojjj```���'''s of this contract including the terms pn/njethe reverse side of this page. I have received my consumer notificatio; w / Il/f!i Date Approved pdV 16 HBB� 1484 S. B Street License No. 79016im #,4 River Springfield, Oregon 97477 Bond No.130517 Insured vtiq, ® (541) 746-5000 ASSOCIATIONTION Affm ELM Fax (541) 747-7159 www. r ive rro of i n g. co m Since 1971 Lane County's Oldest Roofing Company Prime Time Sports Bar &Grill REVISED 4 June 13, 2014 1360 Mohawk Blvd, Springfield OR 97477 Email: richickam@ya oo.com _ Dear Customer, ----=_ We propose to furnish all materials and perform all labor necessary to complete the following: (OPT ION A: 1:Install -1650mi1 PVC_Mechanically fastened membrane roofing system - White, over one (1) layer fire rated base sheet, over existing roof. _ _ 2. New system will encapsulate parapet walls, terminating onto new outer edge metal flashings. grease fans. 3. Install chemical resistant membrane around two (2) g 4. Install protectiontwalk pads to and around HVAC units. 5. Install new pressure treated support blocks. 6. Install new base flashings for pipes, vents and rooftop units. 7. Remove two (2) vents on south side. 8. 15 year warranty on IB material. 9. Install tapered insulation around old angle iron supports on top of parapet wall. 10. Provide permits. 11. Remove our roofing debris from job site. BID PRICE: $24,100.00 OPTION B: 1. Same as Option A except install TPO 60mll mechanically fastened membrane roofing. 2. 20 year warranty on TPO material. BID PRICE: $22,900.00 Notes: 1) Electrical conduit on top of parapet walls relocated by owner's representative or by River Roofing on a time and materials basis. 2) Remove and reinstall satellite as required, realignment, if needed, to be done by others. 3) To remove old roofing and install new membrane roofing system over 1/4" fire rated DensDeck, add $9,500.00 to either option. Price good for 30 days. Workmanship is guaranteed for five (5) years. Manufacturers roofing warranty is as stated above. During demolition debris may sift Into attic areas. Please take measure to cover valuables. For Visa/MC, add 3% surcharge. Payment to be made as follows: El Total due upon completion LXDeposit of 10% with balance due upon substantial completion In the event it becomes necessary to employ an attorney or institute a lawsuit to collect any payment due River Roofing under this Agreement or any modification to this Agreement, River Roofing shall be entitled to recover its attorney fees, costs and disbursements incurred. A late payment charge of 2% per month will be added to any account not paid in full within 10 days after billing. A rebilling chargd of $25 will be added to all past due accounts. An administrative fee of 25°5 will be assessed on all deposits if job is cancelled. Visa/MC for deposits only. The proposal set forth above may be withdrawn by River Roofing if not accepted within 30 days. The terms and conditions on the reverse are part of this contract. (1 C mfr-- jrcrte 13, 2014 Acceptance to furnish all materials and labor required to complete the work specified in the above proposal. I agree to pay the You are hereby authorized d on amount sped' eve, a ending to the tojjj```���'''s of this contract including the terms pn/njethe reverse side of this page. I have received my consumer notificatio; w / Il/f!i Date Approved pdV 16 HBB� 1 OBD T Home Builders LANE LEA vtiq, r"M e<.`. �o.:;" ASSOCIATIONTION Existing Roof System: — Class A, B or C built up systems, smooth surfaced, cap sheet or gravel surfaced (gravel maintained) to retain the existing Classification. Insulation: — "R -TECH" Type "I", "VIII", "II", 9X" or "FanFold" or "Insulfoam" Type "I", "VIII", "II", "IX", 1 in. max thickness Membrane: — "IB" (CPA), mechanically fastened. Surfacing: — River bottom stone (3/4 in. to 1-1/2 in. diam) at 900 lbs per sq. 5. Deck: C-15/32 Incline: 1/2 Existing Roof System: — Class A, B or C built up systems, smooth surfaced, cap sheet or gravel surfaced (gravel maintained) to retain the existing Classification. Insulation: — "R -TECH" Type "I", "VIII", "II", "IX" "FanFold" or "Insulfoam" Type "I", "VIII", "II", "IX", 1 in. max thickness aricIDul nttc: — io tk-r E1), mecnamcany Iastenetl. Surfacin — River bottom stone (3/4 in. to 1-1/2 in. diam) at 900 lbs per sq. 6 Deck: C-15/321Incline: 1-1/2, see Note 1 Exrsthng oof System: `— Any Class A, B or C built-up roof system. Slip Sheet: — One layer "II3 Fire Sheet -1 ", mechanically fastened. Roof Covering: — "IB" (CPA). Note 1: This system maintains the fire rating of the roof being covered. Structural Permit Application �3 in I ujiss �� wagon Mr. me) W,11, ry" U -.[a a IM.2 rim" WMAM I PRO izv This permit is issued under OAR 918-460-0030. Permits expire if war]( is not started within 1 suspended for 180 days. LOCAL GOVERNMENT APPROVAL This project bas land land -use approval. Signature: Date: This project has DEQ approval. Signature Date: Zoning approval verified: ❑ Yes ❑ No Property. is within floodplain: ❑ Yes ❑ No CATEGORY OF CONSTRUCTION ❑ Residential ❑ Oovem,wa Commercial JOB SITE INFORMATION AND LOCATION Job site address: '5(o® M011AWK 15W9 CityS P -IN I State4p, I ZIP. 7W 77 Subdivision: Lot no.: Reference: T"lot: PROPERTY OWNER Name: '"ARID 6 14'i`KMA14 Address: TSIVD City ZIP:-17g77 P"6 -q ( b D56i Fax: Email: This installation is being made on residential or farm property owned by me or a member of my immediate family, and is exempt from licensing requirements under ORS 701.010. Sign here: CONTRACTOR INSTALLATION business none: ' ✓ pp t Address: 14e4 *E)LL-M 13 Si City: 1iar4e.1-b Stat ZIPgja. Pllons4l 7e:(o a6m, I Fax: 7N7 -'I i b E-mail; r o, r p'J rlVerro 1 n •GO CCB license no.: ®f (v Print name: tgw"q Signature: (e) Subtotal offees above (2a through 2d): SUB -CONTRACTOR INFORMATION Name CCR License Numher Phone Number Electrical Plumbing Mechanical DEPARTMENT USE ONLY Pennitno.: SiC,C` Date: (( J RO dnvs A issnan.e ar if wnrk is SCHEDULE _FEE 1. Valuation information (a) Job description:IMGT-AU. tNl ( C. Occupancy p .... Construction type: ._.i oewl-tV6- _.. Square feet: tv ®O Cost per square fool: Other information: Type of Heat: Energy Path: ❑ new ❑ alteration ❑ addition (b) Foundation -only permit? ❑ Yes ❑ No Total valuation: 2. Building fees (a) Permit fee (use valuation table): ' `- $32L( (b) (b) Investigativefee (equal . to [2a)): $ (e) Reinspection ($ per hour): (number of hours x fee per hour) $ (d) Enter n% surcharge (,12 x (2af2b+2cj); $ (e) Subtotal offees above (2a through 2d): S 3. Plan review fees (a) Plan review (66%x permit fee [2aj): $ (b) Fire and life safety (40%x permit fee [2a]): $ (c) Subtotal of fees above (31 mid 3b): $ 4. Miscellaneous fees v (a) SCIS 'o -fee; t o 0I x permit fee [2aj C $ TOTAL fees and surcharges (2c+3c+4a): S &t me QR