HomeMy WebLinkAboutResolution 00-63 12/04/2000 " . CITY OF SPRINGFIELD RESOLUTION NO. 00-63 A RESOLUTION OF THE CITY OF SPRINGFIELD COMMON COUNCIL MODIFYING AND ADOPTING THE SYSTEMS DEVELOPMENT CHARGE PROJECT LIST AS SET FORTH IN CITY OF SPRINGFIELD MUNICIPAL CODE, SECTION 3.410(2). WHEREAS, ORS 223.309 establishes the requirement of a list 6fprojects to be used in expending systems development charge improvement fee revenues which, in turn, establishes the list ofprojects which meet the criteria of being a Qualified Public Imprbvement; and, , WHEREAS, the City of Springfield recognizes the need of having new development pay an equitable share ofthe capital improvement costs related to the impacts such new development has on the City's infrastructure; and, WHEREAS, other capital improvement funding is not available in adequate amounts to provide for such needed improvements; and, WHEREAS, the attached SPRINGFIELD SYSTEM DEVELOPMENT CHARGE PROJECT LIST details those projects which are eligible for expenditure of Systems Development Charge revenues, and which can be Qualified Public Improvements and therefore, eligible for credits to . developers; NOW, THEREFORE, BE IT RESOLVED by the Common Council of the City of Springfield that the City Manager or the City Manager's designee is authorized to use the attached SPRINGFIELD SYSTEMS DEVELOPMENT CHARGE PROJECT LIST in administering Section 3.400 through 3.420 ofthe City Code. Adopted by the Common Council of the City of Springfield this 4th day of December2000., Adopted by a vote of 5 for and 0 against. '- . 1~',;~:VIEWED & APPROVED t'~1 YO FORf~1 \ -..> Cl-,~'~ ..) '-~~ D/~.TE:~LI2b I ~OClQ Oi-FICE OF CITY ATTORNEY . SPRINGFIELD SYSTEMS DEVELOPMENT ,CHARGES PROJECT LIST SANITARY SEWER PROJECTS . PROJECT LOCATION TOTAL ESTIMATED %SDC SDC FUNDED TIME COST FUNDED COST $ YEARS Aerial Mappino 200,000 50 100,000 1-20 Sanitarv Master Plannino 200,000 50 100,000 1-20 Participation in minor private oroiects 200,000 100 200,000 1-20 Thurston Trunk Extension to East 425,000 60 255,000 6-10 Main Street Trunk Extension to East 400,000 70 280,000 6-10 Game Farm Road Trunk 1,200,000 100 1,200,000 1-5 Various Pump Stations' and Force Mains to Serve North SorinQfield 1,350,000 50 675,000 6-10 East Glenwood Gravitv Sewer 1,100,000 70 770,000 1~5 Gateway Street Parallel GravitV,Sewer 600,000 50 300,000 6-10 Enlarged Harlow Pump Station and Force Main 1,500,000 70 1,050,000 1-5 South Springfield Pump Station and Force Main 400,000 50 200,000 6-10 Jasper Road Trunk 3,500,000 100 3,500,000 1-5 TOTAL 11,075,000 8,630,000 N/A . ATTACHMENT E - Page 2 of 9 SPRINGFIELD SYSTEMS DEVELOPMENT CHARGES PROJECT LIst' STORMWATER PROJECTS . 2000 TOTAL TIME PROJECT %SDC ESTIMATED 2000 SDC FRAME, NUMBER PROJECT LOCATION ELIGIBLE COST ELIGIBLE COST YRS. City-Wide 1 Aerial Mapping 50 200,000 100,000 1-20 2 Storm Drainage Master Planning 50 200,000 100,000 1-20 , Participation in minor priyate 3 projects 100 200,000 200,000 1-20 Various Water Quality Improvements' as Required to Accommodate New Development 4 (4) 100 500,000 500,000 1-20 Mill Race Projects Mill Race Flow Control & 5 Enhancement Projects 68 5,500,000 , 3,740,000 1-5 ' Rocky Point Drive System & 6 Outfall (6) 68 300,000 204,000 5-10 North Gateway Basin(l) Storm Pipe::: 2411 or Equivalent 7 Open Drainages-Gateway MDR 64 297,000 191,000 1-5 Storm Water Quality Ponds@ 8 Sports Way/Maple Island Slough 64 ' 333,000, 214,000 1-5 9 Maple Island Slough Outfall (6) 64 1,500,000 960,000 0-5 Upper Q Street Ditch Basin (2) 10 Node 113 to 110 24 111,000 27,000 11-15 Channel #6 Basin (2) 11 Detention Node 600 14 167,000 24,000 1-5 12 Node 5701 to 5111 14 51,000 8,000 16-20 Lower Q Street Ditch Basin (2) 13 Node 410 to 4101 10 72,000 8,000 16-20 14 Node 29 to 2901 10 36,000 4,000 16.20 15 Node 461 to 4612 10 147,000 15,000 16-20 Willamalane Basin (2) 16 Detention Node 240 15 55,000 9,000 6-10 17 Node 1702 to 1301 15 696,000 105,000 16-20 18 Node 270 to 2701 15 97,000 15,000 16-20 19 Node 260 to 2403 15 207,000 32,000 16-20 20 Node 241 to 2402 15 163,000 25,000 6-10 21 Node 170 to 1702 15 184,000 28,000 16-20 22 Node 150 to 1503 15 92,000 14,000 16-20 . . StormprojectUst-3 ATTACHMENT E - Page 3 of 9 Page 1 . 2000 TOTAL TIME PROJECT %SDC ESTIMATED 2000 SDC FRAME, NUMBER PROJECT LOCATION ELIGIBLE COST ELIGIBLE COST YRS. Willamette River Basin (2) 23 Node 392 to 3912 41 284,000 117,000 6-10 24 , Node 36 to River 41 49,000 21,000 16-20 25 Node 4311 to 4301 41 27,000 12,000 16-20 26 Node 391 to 3912 41 76,000 32,000 ,16-20 27 Node 37 to Mill Race 41 49,000 21,000 16-20 28 Ash Street Outfall (6) 41 150,000 62,000 5-10 McKenzie River Basin (2) 29 Node 731 to River 53 62,000 33,000 16-20 30 Node 730 to 7201 ' 53 168,000 90,000 16-20 31 ,Node 690 to 701 53 111,000 59,000 16-20 32 Manor Dr. Outfall (6) 53 250,000 133,000 5-10 33 Hayden Bridge Rd. Interceptor (6) 53 500,000 265,000 5-10 South A Street Basin (2) 34 Rosboro Detention Pond (6) , 25 300,000 75,000 5-10 Main Street Basin (3) 35 Location # 1 to 3 77 936,000 721,000 '16-20 36 Location #5 to 7 77 81,000 63,000 16-20 37 Location #6 to 7 77 72,000 56,000 ,16-20 38 Location #7 to 8 77 167,000 '129,000 16-20 39 Location #9 to 10 77 108,000 84,000 16-20 40 Location #23 to 24 77 822,000 633,000 16-20 41 Location #34 to 36 77 365,000 282,000 11-15 42 Location #35 to 36 77 274,000 211,000 11-15 43 Location #38 to 40 77 411,000 317,000 11-15 44 Location #39 to 40 77 614,000 473,000 11-15 45 Location #40 to 41 77 306,000 236,000 11-15 46 Jasper Slough Improvements (6) 77 500,000 385,000 5-10 47 Jasper Slough Outfall (6) 77 150,000 116,000 0-7 Thurston Basin (3) 48 Location #3 to 4 57 508,000 290,000 16-20 49 Location #11 to 12 57 2,102,000 1,199,000 16-20 50 Location #13 to 14 57 635,000 362,000 16-20 51 Location #19 to 20 57 1,161,000 662,000 16-20 52 Location #21 to 22 57 492,000 281,000 16-20 53 Location #25 to 26 57 188,000 108,000 11-15 54 Location #26 to 28 57 445,000 254,000 16-20 . . StormProjectList-3 ATTACHMENT E - Page 4 of 9 Page 2 . 2000 TOTAL TIME PROJECT %SDC ESTIMATED 2000 SDC FRAME, NUMBER PROJECT LOCATION ELIGIBLE COST ELIGIBLE COST YRS. 55 Location #27 to 28 57 346,000 198,000 16-20 56 Location #28 to 32 57 1,038,000 592,000 16-20 57 Location #29 to 31 57 435,000 248,000 16-20 58 Location #30 to 31 57 1,519,000 866,000 16-20 59 Location #31 to 32 57 797,000 455,000 16-20 Hwy 126/I-105 Drainage 60 Improvements (6) -57 450,000 257,000 0-5 ~ Cedar Creek Improvements (6) 57 - Outfall/Detention at Lively 61 Park/McKenzie River (6) 57 250,000 143,000 5~10 - Thurston Middle School 62 Channel Improvements (6) 57 200,000 114,000 5-10 63 - Gossler Bank Control Project (6) 57 1,500,000 855,000 5-10 Glenwood Basin (5) 64 Location # 1 0 to 12 34 8,000 3,000 16-20 ,65 Location #55 ~ 34 30,000 11,000 16-20 66, Location #55 to 58 34 122,000 42,000 16-20 67 Location #58 to 45 34 88,000 30,000 16-20 68 Location #77 to 60 34 355,000 121,000 16-20 SubTotals 30,609,000 18,240,000 . (1) Projects from the Gateway Conceptual Development Plans and as designed. (2) Projects from theWest Springfield Drainage Master Plan, 1983 (3) Projects from the Drainage Plan for East Springfield, 1979 (4) Projects for improvement of storm water quality on a basin-wide basis, as required , by environmental regulations. (5) Projects from the Eugene Areawide Drainage Master Plan, Volume IV, Glenwood, Riverview-Augusta, and Willow Creek Basins, 1990 (6) Additional Projects from the Proposed Update of the Metro Area Public Facilities and Services Plan (7) The referenced Master Planning document calls for this project to convert an ex.isting open channel system to a piped system. The City may elect to retain the open channel and construct channel improvements to provide the necessary capacity enhancements. . storm ProjectList-3 ATTACHMENT E - Page 5 of 9 Page 3 . . . SPRINGFIELD SYSTEMS DEVELOPMENT CHARGE, PROJECt LIST TRANSPORTATION PROJECTS Geographic Estimated %SDC SDC Funded Name Limits TP Num Cost funded Cost 42nd Street @ Marcola Road 712 $200,000 52% $103,659 Centennial Prescott Lane to Mill Boulevard Street 818 $1,000,000 12% $121,212 Centennial Boulevard @ 21st Street 927 $200,000 69% $137,498 Centennial Boulevard @ 28th Street 924 $200,000 63% $i25,655 HarlowRoad @ Pheasant Boulevard 744 $200,000 45% $90,000 Main Street ' @ 48th Street 69 $200,000 30% $59,447 Main Street @ Mountaingate Drive 75 $200,000 5% $10,706 Q Street @ Pioneer Parkway 774 $200,000 1% $2,768 S 42nd Street @ Daisy Street 951 ' $200,000 9% $17,225 Centennial 28th Street to 35th Boulevard Street' 930 $3,000,000 7% $217,500 Yolanda Avenue to 19th Street Hayden Bridge Road 703 $891,000 10% $89,100 Main Street to Centennial , 30th Street Boulevard 915 $904,500 9% $77,927 Yolanda Avenue to 36th Street Marcola Road 709 $1,701,000 10% $170,100 Main Street to Daisy 78% 54th Street Street 87 $756,000 $589,680 Main Street to Thurston 79th Street Road 18 $1,000,000 10% $99,425 Game Farm Road to MDR Cardinal Way north.south connector 721 $1,242,000 10% $124,200 Daisy Street 46th Street to 48th Extension Street 24 $929,000 10% $91,498 Linda Lane. Jasper Road Future Collector C1 Extension 33 $1,350,000 10% $132,300 Jasper Road. Future Collector C2 Mountaingate 36 $3,510,000 10% $347,119 Jasper Road Extension: Future Collector C3 East Natron 39 $1,890,000 10% $185,715 East.west in Mid.Natron Future Collector C4 site 42 $1,620,000 10% $158,760 Loop Rd in South Natron Future Collector C5 Site 45 $2,700,000 10% $264,600 ATTACHMENT E - Page 6 of 9 Page 1 . . . SPRINGFIELD SYSTEMS DEVELOPMENT CHARGE PROJECT LIST TRANSPORTATION PROJECTS Geographic Estimated %SDC SDC Funded Name Limits TP Num Cost funded Cost , Future Collector C6 ' Mt Vernon Road. Jasper $2,700,000 10% $259,171 Road Extension 48 North.south in mid. Future Collector C7 Natron site 51 , $1,512,000 10% $146,681 55th Street to 48th Glacier Drive Street 57 $1,840,000 8% $143,520 McKenzie.Gateway M DR Loop 10% collector Within MDR site 756 $2,160,000 $211,680 North-south within MDR M DR Site site' 762 $1 ,440,.000 10% $141,120 Main Street to South Mountaingate Drive 58th Street 78 $2,430,000 0% $0 Jasper Road Extension to Mt Vernon Road Mountaingate Drive 81 $540,000 10% ' $54,000 31st Street to Marcola V street Road 777 $1,755,000 8% $136,890 Vera Dr.lHayden 15th Street to 20th, Sr. Rd. Street 780 $918,000 10% $87,316 ., 31 st Street to 34th Yolanda Avenue Street 783 $540,000 10% $54,000 Main Street to Centennial 28th Street Boulevard 909 $1,050,000 0% $0 Commercial Avenue to 35th Street Olympic street 918 $920,000 0% ' $0 Marcola Road to Railroad 42nd Street Tracks 713 $2,060,000 8% $159,484 48th Street Main Street to G Street 3 $720,000 50% $360,000 G Street to E.S Highway 52nd Street (SR 126) 6 $300,000 1~ $35,632 Main Street to Thurston 69th Street Road 15 $840,000 6% $54,009 West D Street to Aspen street Centennial Boulevard 809 $750,000 5% $35,291 '--' Deadmond Ferry Road to the end of dedicated Baldy View Lane right.of.way 715 $420,000 50% $210,000 30th Street to 42nd Commercial Street Street 933 $1,620,000 12% $189,828 Deadmond Ferry Baldy View Lane to \ Road McKenzie River 724 $1,095,000 50% $547,500 48th Street to 52nd G Street Street 54 $465,000 5% $25,054 - Game Farm Road Game Farm Road East to South Harlow Road 737 $1,395,000 0% $0 ATTACHMENT E - Page 7 of 9 Page 2 . . . SPRINGFIELD SYSTEMS DEVELOPMENT CHARGE PROJECT LIST TRANSPORTATION PROJECTS Geographic Estimated %SDC SDC Funded Name Limits TP Num Cost funded Cost Hayden Bridge Yolanda Avenue to , Road Marcela Road 747 $2,310,000 0% $0 Scotts Glen Drive to Laura Street Harlow Road 750 $800,000 1% $11,782 " S. 28th Street Main Street to Millrace 945 $2,000,000 2% $43,822 S. 32nd Street Main Street to Railroad 948 $800,000 13% $103,030 Thurston Road 72nd Street to UGB 98 $1,220,000 3% $30,596 Hayden Bridge Rd. to U 3% 31st Street Street 765 $1,275,000 $39,386 Corridor Studies City Wide $600,000 50% $300,000 Daisy Street at 48th Street $150,000 62% $93,600 Gateway Street at gateway Loop $150,000 38% $57,492 Gateway Street Gateway Area - $1,600,000 75% $1,200,000 Aerial mapping City Wide $50,000 100% $50,000 City participation in State and fed. Proj. City Wide, $3,190,000 36% $1,147,034 48th Street Aster Street to Daisy St. $850,000 39% $331,500 57th/58th inter. . Jasper Jasper Road Rd. $2,000,000 66% $1,318,759 - - Pioneer Parkway Extension Harlow Rd te Beltline Rd. $7,500,000 32% $2,372,486 ROW for new collector City Wide $300,000 ' 50% $150,000 Gateway Street to Beltline Road Gamefarm Road $700,000 44% $305,621 Glenwood Blvd Franklin Blvd to I- 5 $750,000 85% $637,500 BIKE PROJECTS I 42nd Street Marcola Road to Railroad Pathway Tracks 795 $615,000 6%_ $36,900 Weyerhaeuser Truck Booth Kelly Road Road 921 $245,000 6% $14,700 .. By Gully Exte~sion Mill Street to 5th Street 812 $80,000 6% $4,800 28th Street to 32nd Millrace Path (Spr.) Street 859 $150,000 6% $9,000 Page 3' ATTACHMENT E - Page 8 of 9 . --. . SPRINGFIELD SYSTEMS DEVELOPMENT CHARGE PROJECT LIST TRANSPORTATION PROJECTS Geographic Estimated %SDC SDC Funded Name Limits TP Num Cost funded Cost S. 2nd Street to S. 28th Millrace Path (Spr.) Street 840 $2,340,000 6% $140,400 S. 28th Street. S. 28th Street to 32nd 32nd Street Street $50,000 6% $3,000 McKenzie River 42nd Street to 52nd Path Street 753 $2,620,000 6% $157,200 Various Bike Lane Restripi ng Projects Throughout the City $644,849 30% $193,454 Grand Total I I $84,553,349\ I $14,819,332 Page 4 ATTACHMENT E - Page 9 of 9