Loading...
HomeMy WebLinkAboutPermit Building 1996-10-7 . COM M ERCIALlI N DUSTRIAL PERMIT APPLICATION . 225 Fifth Street, Springfield, Oregon 97477 ~ JOB NUMBER "'7.t::/7 5""/ INSPECTION LI N E: 726.3769 OFFICE: 726.3759 LOCATION OF PROPOSED WORK' \ l roro / /">'!J "7' -::;>0-7"/ .. r# -S. A s:: ?Pb_ ASSESSORS MAp. TAX LOT: _ ~~6? OWNER: . ADDRESS: CITY. s..+~ Ut'.. 1M .vt-'t-.7... ~~ PHONE 2L17~ 52.. 41 \ , STAT~. \ , ZIp. , , DESCRIPTION OF WORK: NEW REMODEL 1? 'It lLc:>o -r u i-l- M- ~ ADDITION- r_~<;; " ... Go fUlJ-I j'1Jr~, DEMOLISH drHER VALUE: I ~'O o,J NAME ADDRESS PHONE ARCHITECT: CONTRACTOR'S NAME GENERAL: -lA' ~ VI " ~"I k-t-f, PLUMBING. ADDRESS ~,...(.,\,,11_ CONST. CONTRACTOR' EXPIRES PHONE ~V1~l vfU>5\ ,r ['""'t:.. 1.17 t.'K1-SUov r40~ b'3SI~ MECHANI,....~ I. ELECTRICAl. -::::- PUIMRING MECHANICAL --.lli' , FFF f:HARnE Nn ~I=J: p r~.o. Rn1= Single Fixture Relocated Bldg. (new fix. addtl) Water Service Furnacel burner & vent < 100.000 BTUs Furnace/burner & vent > 100.000 BTUs It. Floor furnace and vent Suspended wall or floor mounted unit heater Appliance Vent separate Stationaryevap. cooler Vent FanfSingle duct Vent System apart from AC or htg. Mechanical exhaust hood and duel Sanitary Sewer It. Storm Sewer It. Backflow Device Permit Issuance $10.00 TOTAL PERMIT TOTAL PERMIT - OFFICE USE - HANDICAP ACCESS: FLOOD PLAIN. ZONING: OUAD AREA" LANO USE: . OF BLDG~. . OF UNITS. OCCY GROUP: . OF STORIES. CONSTR. TYPF. HEAT SOURC~. LIGHTING POWER BUDGET: WATER HEATER. SO. FT. $IS0. FT. VALUE so. FTG MAl N SO. FTG ACCES~ X X so. FTG OTHER X TOTAL VALUE OF PROJECT PLAN CHECK FE.E. RCPP DAT~ BY I BUILDING PERMIT 15% Stale Surcharqe I MECHANICAL 15% Stale Surcharae I PAVING //~ ?'?> ~: :;"f -:;',~<- PLUMBING DEMOLITION 5% State Su rcharqe FENCE VALUE $ SIDEWALK CURBCUT FT SUBTOTAL PERMITS SYSTEMS DEVELOPMENT FT. TOTAL PERMIT"FEES I EXCLUDING ELECTRICAl I//, 3S- . REQUIRED INSPECTIONS . It Is the responsibility of the permit holder to see that all InspectIons are made at the proper time. To request an Inspection, call 726.3769 (recorder), state your City designated job number, job address, type of inspection requested and when you witl be ready for inspection. Requests received before 7:00 a.m. will be made the same working day, requests made after 7:00 a.m. will be made the following work day. SITE INSPECTION: To be made after excavation, but prior to setup of forms. UNDERSLAB PLUMBING, ELECTRIC!l.L &,. \ .,. \ MECHANICAL: To be made before any work Is covered. ROUGH PLUMBING, : ELECTRICAL & . MECHANICAL: No work is to be covered until these inspections have been made and approved. ATTIC DRAFT STOPS & CURTAIN WALLS , '. , FOOTINGS & FOUNDATIONS: To be made after trenches are excavated and forms are erected, all steel.in place, but . prior to placing concrete. . , \ CONCRETE SLAB: To be made after all inslab building service equipment, conduit, piping, accessories and other ancillary equipment items are In place but before any concrete Is placed. .-' C \ . \ . I .~ UN DERG ROUN D:'.PI umbl ng, electrical, gas, sanitary sewer, storm sewer, water and . d ral nage I I nes. To be made prior to covering or filling trenches. FIRE & SEPARATION WALL: Located and constructed according to plans. . I; FIREPLACE: Prior to placing facing materials and before framing inspection. :.... " <?: I. ~ .... -r L ',1 FRAMING: To be made after the roof, all framing, fire blocking and bracing are in place and all pipes, chimneys and vents are complete and the rough electrical, plumbing and mechanical are approved. . INSULATION & VAPOR / < '. BARRIER:' To b'e made after:, all.\. ins-ulation and 're<wired-vapor' .../ qarriers are In place but before any lath or gypsum board Interior wall covering is applied. UNDERFLOOR: Plumbing, electrical, mechanical. To be made prior to installation of floor insulation, decking or floor sheathing. LATH ANDIOR GYPSUM BOARD: To be made after all lathing and gypsum board, interior and exterior, is in place but before any plastering Is applied or before gypsum board Joints and fasteners are taped and finished. POST & BEAM: To be made prior to Installation of floor Insulation, decking or floor sheathing. FLOOR INSULATION & VAPOR BARRIERS: To be made prior to Installation of decking or floor sheathing. SIDEWALK & DRIVEWAY: Required for all concrete paving within street right of way, to be made after all excavating complete and form work and sub-base material in place. MASONRY: Steel location, bond beams grouting or verticals In accordance with UBC 2415. ROOF SHEATHING AND NAILING: Prior to Installing any roof covering. CURB AND APPROACH APRONS: After forms are erected but prior to placing concrete. PAVING: After gravel is In place but prior to placing asphalt or concrete. SPECIAL INSPECTIONS: In accordance Sectiont306 of the State SpecIalty Code a special.inspector'shall be employed by the Ownerf.Contractor during construction of the following work. A copy of the special testlng reports shall be furnished to the Building Division. STRUCTURAL CONCRETE: In "I 'excess of 2500 P.S.1. (306 a.1) STRUCTURAL WELDS: Performed on the job. (2722 f) HIGH STRENGTH BOLTING: During all bolt installation and tightening operations. (306 a.6) ...., , 1:,t.J' .IJ SPRAYED ON FIREPROOFING: U.BC. Standards 43-8. SPECIAL GRADING, EXCAVATION AND FILLING: During earthwork. (306 a.11 & Chapter 29) GLU.LAM BEAMS: Inspection' Certificate by an approved agency, furnished to the City's Building Division before beams are placed. (2501 U.B.C. STDS. 25.10,11). y STRUCTURAL MASONRY: (306 a.7) b~Y;Yh'/"# fi::?L:Jr~~ <:: .&~~r /~~/~> * In addit10n to the inspec- - lions specified, the Building Official may make or require other inspections of any construction work to ensure compliance with the Building, City or Development Code. y FINAL PLUMBING ------------------------------------------------------- SITE PLAN REVIEW BOARD: Must be requested 2 days In advance of the date you wish inspection. All project conditions such as landscaping, parking lot striping, etc. must be completed before requesting this Inspection. FINAL ELECTRICAL FINAL BUILDING: Requested after the final plumbing, electrical, mechanical and Fire Department inspections are made and approved. No occupancy of the premises can be made until a Certificate of Occupancy has been issued by the Building Division and posted on the premises. FINAL MECHANICAL FINAL FIRE DEPARTMENT ADDITIONAL COMMENTS. PLANS REVIEWED BY DAT" By signature, I state and agree, that I have carefully examined the completed applicatlon and do hereby certify th!it all Information herein is true and correct, and I further certify that any and all work performed shall be done in accordance with the Ordinances of the City of Springfield, and the Laws of the State of Oregon pertaining to the work described herein, and that NO OCCUPANCY will be made of any structure without permission of the Building Safety Division. I further certify that only contractors and employees who are in compliance with ORS 701.055 will be used on this project. I further agree to ensure that all required Inspections are requested at the proper time, that project address Is readable from the street, that the permit card is located at the front of the property, and the approved set of 'plans will remain on the site at all times during construction.. /7 Slgn~:/LL.-<-- ffo_ ;;Vd} Date / Q- 7 ~ 1/' 7' 'i - - -- ,.-r VL-/ 7 V~TION: AMOUNT RECEIV;;;;-: RECEI PT .. //'7. "? S- :<~'379 DATE PAID: /,:::> , ::>- 5' r.::: ~------ RECEIVED BY.