Loading...
HomeMy WebLinkAboutBuilding Miscellaneous 2014-5-28 • FE! Page 1 of 1 �TESTINGgINSPfC11GN,/Y1b Geoted ncal&CortstructionSevoes Daily Field Report Construction Client: Jack Piper Proj t: CaCo 3 Silo Date: 05-28-14 Ridgeline Pipe Manufacturing 2220 Nugget Way Project No.: 2147071 2220 Nugget Way Eugene, Oregon 97403 Report No.: E-37023 Eugene, Oregon 97403 Inspector: A. Fenstermacher ID No.: 5258882-49 • • ICC Inspection of: Reinforcing Steel • eather: Clear Continuous Inspection: ❑ Contractor: JT Excavation B• No.: SPR14-820 Periodic Inspection: Performed preliminary inspection on the reinforcing steel for Calcium Carbonate Silo foundation. Reinforcing steel was checked for size, grade, laps, quantities, location, laps, clearance, and supports. A final inspection will be performed prior to concrete placement. To the best of our knowledge, the work inspected was in accordance with plans dated 03-26-14 and applicable workmanship provisions of the I.B.C., except if noted above. Reviewed By: �•� Michael L. M r Technical Manager c: JT Excavation (email) City of Springfield— Robert Castile (email) MLM:vs • This report and/or enclosed tes)'data is the confidential properly of the client to whom it is addressed and pertains to the specific process and/or material evaluated. As such,information contained herein shall not be reproduced in part or full and/or any part thereof be disclosed without FEI Testing 8 Inspection,Ines written authorization. 750 NW Cornell Avenue•Corvallis,Oregon 97330 phone(541)757-4698 fax(541)757-2991 29540 B Airport Road'Eugene,Oregon 97402:phone(541)684-3849'fax(541)684-3851 62979 NE Plateau Drive.Suite 3'Bend,Oregon 97701 'phone(541)382-4844'fax(541)382-4846 •