HomeMy WebLinkAboutBuilding Miscellaneous 2014-5-28 •
FE! Page 1 of 1
�TESTINGgINSPfC11GN,/Y1b Geoted ncal&CortstructionSevoes Daily Field Report Construction
Client: Jack Piper Proj t: CaCo 3 Silo Date: 05-28-14
Ridgeline Pipe Manufacturing 2220 Nugget Way Project No.: 2147071
2220 Nugget Way Eugene, Oregon 97403 Report No.: E-37023
Eugene, Oregon 97403 Inspector: A. Fenstermacher
ID No.: 5258882-49
•
•
ICC
Inspection of: Reinforcing Steel • eather: Clear Continuous Inspection: ❑
Contractor: JT Excavation B• No.: SPR14-820 Periodic Inspection:
Performed preliminary inspection on the reinforcing steel for Calcium Carbonate Silo
foundation. Reinforcing steel was checked for size, grade, laps, quantities, location,
laps, clearance, and supports. A final inspection will be performed prior to concrete
placement.
To the best of our knowledge, the work inspected was in accordance with plans dated
03-26-14 and applicable workmanship provisions of the I.B.C., except if noted above.
Reviewed By:
�•�
Michael L. M r
Technical Manager
c:
JT Excavation (email)
City of Springfield— Robert Castile (email)
MLM:vs
•
This report and/or enclosed tes)'data is the confidential properly of the client to whom it is addressed and pertains to the specific
process and/or material evaluated. As such,information contained herein shall not be reproduced in part or full and/or any part
thereof be disclosed without FEI Testing 8 Inspection,Ines written authorization.
750 NW Cornell Avenue•Corvallis,Oregon 97330 phone(541)757-4698 fax(541)757-2991
29540 B Airport Road'Eugene,Oregon 97402:phone(541)684-3849'fax(541)684-3851
62979 NE Plateau Drive.Suite 3'Bend,Oregon 97701 'phone(541)382-4844'fax(541)382-4846
•