Loading...
HomeMy WebLinkAboutPermit Building 1997-8-28 SPRINGFIELD Page 1 COMMERCIAL/INDUSTRIAL PERMIT APPLICATION CITY OF SPRINGFIELD Job Number: 961612B COMMUNITY SERVICES DIVISION BUILDING SAFETY 225 North Fifth Street Springfield, OR 97477 Office: 726-3759 Inspection Line: 726-3769 Location of Proposed Work: 147 75TH ST Assessors Map #: 17023500 Tax Lot #: 03601 Owner: BEREAN ASSEMBLY Address: 275 SOUTH 70TH STREET Phone #: 747-5711 City/State/Zip: SPRINGFIELD. OREGON 97478 Description Of Work: NEW Value: 461,396.00 --- PLUMBING --- No. 26 Fee Charge 260.00 10.00 Single Fixture BACKFLOW DEVICE TOTAL PERMIT 270.00 --- MECHANICAL --- No. Fee Charge 18.00 9.00 18.00 12.00 8.00 8.00 10.00 3 Furnace/burner & vent < 1000,000 BTUs Vent Fan/Single Duct 3 AC UNITS 2 UNIT HEATERS GAS PIPING 2 AIR HANDLING UNITS Permit Issuance TOTAL PERMIT 83.00 -- OFFICE USE -- Item FINISH PART INSIDE Square Feet 3572 x $/Square Feet 13.95 Value 49.829.00 TOTAL VALUE OF PROJECT 49,829.00 Plan Check Fee: 647.08 Rec #: 23952 Date: 12/04/96 Rec By: LORNE PLEGER BUILDING Surcharge/Admin MECHANICAL Surcharge/Admin PLUMBING Surcharge/Admin ADDIT PLAN REVIEW 283.00 22.64 83.00 5.84 270.00 21.60 80.00 SUBTOTAL PERMITS 766.08 ?#4~'7Z. 5p.t: /::> ",?3. 5"~ 73?9.t4f- BPRINQFIELD /~I'~ Job Number: 961612B Page 2 TOTAL PERMIT FEES EXCLUDING ELECTRICAL 766.08 REQUIRED INSPECTIONS It is the responsibility of the permit holder to see that all inspections are made at the proper time. To request an inspection, call 726-3769 (recorder), state your City designated job number, job address, type of inspection requested and when you will be ready for inspection. Requests received before 7:00 a.m. will be made the same working day, requests made after 7:00 a.m will be made the following work day. Special Inspections: In accordance with a special inspector shall be employed by construction of any following 11 * 11 work. shall be furnished to Building Safety. Section 306 of the State Specialty Code the Owner/Contractor during A copy of the special testing reports In addition to the inspections specified, the Building Official may make or require other inspections of any construction work to ensure compliance with the Building, City or Development Code. ROUGH PLUMBING - Prior to cover. ROUGH MECHANICAL - Prior to cover. ROUGH ELECTRICAL - Prior to cover. FRAMING - Prior to cover. INSULATION - Floor; prior to decking DRYWALL - Prior to taping. CEILING GRID INSULATION - Floor; MECH/SUB: FOLLOWING PLMB/SUB: FOLLOWING FINAL/SUB FINAL PLUMBING - When all plumbing work is complete. FINAL MECHANICAL - When all mechanical work is complete. ELECTRICAL SERVICE - Must be approved to obtain permanent power. FINAL ELECTRICAL - When all electrical work is complete. FINAL FIRE - When all Fire Department requirements have been met. been met. FINAL SITE PLAN - After all requirements have been met for Minimum Development Standards or from the Development Agreement. FINAL BUILDING - When all required inspections have been approved and the building is complete. Wall/Ceiling; Prior to cover prior ROUGH ROUGH to decking Wall/Ceiling; Prior to MECHANICAL APPROVAL. PRIOR TO COVER PLUMBING INSPECTION, PRIOR TO COVER cover --- ADDITIONAL COMMENTS --- PHASE 2 INCLUDES PARTIAL INTERIOR COMPLETION OF BUILDING SEE JOB #961612A FOR SITE IMPROVEMENTS AND STRUCTURAL SHELL Plans Reviewed By: LORNE PLEGER Building Site Reviewed By: Date: 01/09/97 SPRINGFIELD 1:1"6'lif.J'}l'4 ~- Job Number: 961612B Page 3 By signature, I state and agree, that I have carefully examined the completed application and do hereby certify that all information hereon is true and correct, and I further certify that any and all work performed shall be done in accordance with the Ordinances of the City of Springfield, and the Laws of the State of Oregon pertaining to the work described herein, and that NO OCCUPANCY will be made of any structure without permission of the Community Services Division, Building Safety. I further certify that.only contractors and employees who are in compliance with ORS 701.055 will be used on this project. I further agree to ensure that all required inspections are requested at the proper time, that project address is readable from the street, that the permit card is located at the front of the property, and the approved set of plans will remain on the site at all times during construction. %- U - 5 "/ Date -- - VALIDATION Receipt Number: .:;l"'72-::l ~ Date Paid: ~'2#-~? Amount Received: 7-=f 9"5" t::: '-/ Received By: ~ ~/~_ ~v- ---:-~-- , ~ CITY OF SPRINGFIELD SYSTEMS DEVELOPMENT CHARGE (COMMERCIAL / INDUSTRIAL) Name or Company: BEREAN ASSEMBLY Location: 147 75TH ST Developement Type: C Building Size: / /"::,,"" X 44.75 1. STORM DRAINAGE Impervious Sq Ft 1.0 X 0 2. SANITARY SEWER Number Of PFUs (see Page 2) - CITY 1. 0 X 49 3. TRANSPORTATION Number of Units 1.0 X 10.900 X X Trip Rate 0.720 X Transportation Total 4. SANITARY SEWER - MWMC Number Of PFUs 49 MWMC CREDIT If Applicable (see Page 2) TOTAL - MWMC SDC SUBTOTAL - (Add Items 1, 2, 3 & 4) 5. ADMINISTRATIVE FEES Base Charge (Subtotal Above) x TOTAL SDC Reviewed By: TROY MCALLISTER Job No.: 961612 Lot Size: C C.""P,-'-'r€:' pI4JlL<r) Per Sq Ft = Per PFU = x Cost Per Trip 451.26 $3,541.49 x X Per PFU + 20.690 + 0.50 MWMC Admin Fee 10.00 Date: 12/19/96 Page 1 Sq Ft $0.00 $2,192.75 $3,541.49 $1,023.81 $440.37 $583.44 $6,317.68 $315.88 $6,633.56 , Job Number: 961612 , FIXTURE UNIT CALCULATION TABLE Page 2 Fixture Type Bathtub Drinking Fountain Floor Drain Interceptors For Grease/Oil/Solids/Etc Inteceptors For Sand/Auto washjEtc Laundry Tub/Clotheswasher Clotheswasher - 3 Or More Receptor For Refrigerator/Water station/Etc Receptor for Commercial Sink/Dishwasher/Etc Shower, Single Stall Shower, Gang Sink, Bar, Commercial, Residential Kitchen Urinal, Stall/Wall Wash Basin/Lavatory, Single Water Closet, Public Installation Water Closet, Private Miscellaneous TOTAL FIXTURE UNITS Number of New Fixture Unit Equivalent Fixture units o o o o o o o o o o o 2 2 5 6 o o 2 1 2 3 6 2 6 1 3 2 o o o o o o o o o o o 4 4 5 36 o o 2 2 1 6 4 49 CREDIT CALCULATION TABLE: Based on assessed value. If improvements occured after annexation date, credits are calculated separately. (calculations are by $1000) Year Annexed: 1985 Credit For Parcel Or Land Only If Applicable: Improvement (if after annexation date) : 160,720 2.74 440.37 X o 2.74 0.00 X CREDIT TOTAL = $440.37 (If land value is multiplied by 1 then the parcel/land credit is not accurate.)