HomeMy WebLinkAboutPermit Building 1997-8-28
SPRINGFIELD
Page 1
COMMERCIAL/INDUSTRIAL PERMIT APPLICATION
CITY OF SPRINGFIELD Job Number: 961612B
COMMUNITY SERVICES DIVISION
BUILDING SAFETY
225 North Fifth Street
Springfield, OR 97477
Office: 726-3759
Inspection Line: 726-3769
Location of Proposed Work: 147 75TH ST
Assessors Map #: 17023500
Tax Lot #: 03601
Owner: BEREAN ASSEMBLY
Address: 275 SOUTH 70TH STREET
Phone #: 747-5711
City/State/Zip: SPRINGFIELD. OREGON 97478
Description Of Work:
NEW
Value:
461,396.00
--- PLUMBING ---
No.
26
Fee
Charge
260.00
10.00
Single Fixture
BACKFLOW DEVICE
TOTAL PERMIT
270.00
--- MECHANICAL ---
No.
Fee
Charge
18.00
9.00
18.00
12.00
8.00
8.00
10.00
3
Furnace/burner & vent < 1000,000 BTUs
Vent Fan/Single Duct
3 AC UNITS
2 UNIT HEATERS
GAS PIPING
2 AIR HANDLING UNITS
Permit Issuance
TOTAL PERMIT
83.00
-- OFFICE USE --
Item
FINISH PART INSIDE
Square Feet
3572
x
$/Square Feet
13.95
Value
49.829.00
TOTAL VALUE OF PROJECT
49,829.00
Plan Check Fee:
647.08 Rec #: 23952 Date: 12/04/96 Rec By: LORNE PLEGER
BUILDING
Surcharge/Admin
MECHANICAL
Surcharge/Admin
PLUMBING
Surcharge/Admin
ADDIT PLAN REVIEW
283.00
22.64
83.00
5.84
270.00
21.60
80.00
SUBTOTAL PERMITS
766.08
?#4~'7Z. 5p.t: /::>
",?3. 5"~
73?9.t4f-
BPRINQFIELD
/~I'~
Job Number: 961612B
Page 2
TOTAL PERMIT FEES EXCLUDING ELECTRICAL
766.08
REQUIRED INSPECTIONS
It is the responsibility of the permit holder to see that all inspections are
made at the proper time. To request an inspection, call 726-3769
(recorder), state your City designated job number, job address, type of
inspection requested and when you will be ready for inspection. Requests
received before 7:00 a.m. will be made the same working day, requests made after
7:00 a.m will be made the following work day.
Special Inspections: In accordance with
a special inspector shall be employed by
construction of any following 11 * 11 work.
shall be furnished to Building Safety.
Section 306 of the State Specialty Code
the Owner/Contractor during
A copy of the special testing reports
In addition to the inspections specified, the Building Official may make or
require other inspections of any construction work to ensure compliance with
the Building, City or Development Code.
ROUGH PLUMBING - Prior to cover.
ROUGH MECHANICAL - Prior to cover.
ROUGH ELECTRICAL - Prior to cover.
FRAMING - Prior to cover.
INSULATION - Floor; prior to decking
DRYWALL - Prior to taping.
CEILING GRID
INSULATION - Floor;
MECH/SUB: FOLLOWING
PLMB/SUB: FOLLOWING
FINAL/SUB
FINAL PLUMBING - When all plumbing work is complete.
FINAL MECHANICAL - When all mechanical work is complete.
ELECTRICAL SERVICE - Must be approved to obtain permanent power.
FINAL ELECTRICAL - When all electrical work is complete.
FINAL FIRE - When all Fire Department requirements have been met.
been met.
FINAL SITE PLAN - After all requirements have been met for Minimum
Development Standards or from the Development Agreement.
FINAL BUILDING - When all required inspections have been approved and
the building is complete.
Wall/Ceiling; Prior to cover
prior
ROUGH
ROUGH
to decking Wall/Ceiling; Prior to
MECHANICAL APPROVAL. PRIOR TO COVER
PLUMBING INSPECTION, PRIOR TO COVER
cover
--- ADDITIONAL COMMENTS ---
PHASE 2 INCLUDES PARTIAL INTERIOR COMPLETION OF BUILDING
SEE JOB #961612A FOR SITE IMPROVEMENTS AND STRUCTURAL SHELL
Plans Reviewed By: LORNE PLEGER
Building Site Reviewed By:
Date: 01/09/97
SPRINGFIELD
1:1"6'lif.J'}l'4
~-
Job Number: 961612B
Page 3
By signature, I state and agree, that I have carefully examined the completed
application and do hereby certify that all information hereon is true and
correct, and I further certify that any and all work performed shall be done
in accordance with the Ordinances of the City of Springfield, and the Laws
of the State of Oregon pertaining to the work described herein, and that
NO OCCUPANCY will be made of any structure without permission of the
Community Services Division, Building Safety. I further certify that.only
contractors and employees who are in compliance with ORS 701.055 will be
used on this project.
I further agree to ensure that all required inspections are requested at the
proper time, that project address is readable from the street, that the
permit card is located at the front of the property, and the approved set
of plans will remain on the site at all times during construction.
%- U - 5 "/
Date
-- - VALIDATION
Receipt Number: .:;l"'72-::l ~
Date Paid: ~'2#-~?
Amount Received: 7-=f 9"5" t::: '-/
Received By: ~ ~/~_
~v- ---:-~--
,
~
CITY OF SPRINGFIELD SYSTEMS DEVELOPMENT CHARGE
(COMMERCIAL / INDUSTRIAL)
Name or Company: BEREAN ASSEMBLY
Location: 147 75TH ST
Developement Type: C Building Size:
/ /"::,,""
X 44.75
1. STORM DRAINAGE
Impervious Sq Ft
1.0 X 0
2. SANITARY SEWER
Number Of PFUs
(see Page 2)
- CITY
1. 0 X 49
3. TRANSPORTATION
Number of Units
1.0 X 10.900 X
X Trip Rate
0.720 X
Transportation Total
4. SANITARY SEWER - MWMC
Number Of PFUs
49
MWMC CREDIT If Applicable (see Page 2)
TOTAL - MWMC SDC
SUBTOTAL - (Add Items 1, 2, 3 & 4)
5. ADMINISTRATIVE FEES
Base Charge (Subtotal Above) x
TOTAL SDC
Reviewed By: TROY MCALLISTER
Job No.: 961612
Lot Size:
C C.""P,-'-'r€:'
pI4JlL<r)
Per Sq Ft =
Per PFU =
x
Cost Per Trip
451.26
$3,541.49
x
X
Per PFU +
20.690 +
0.50
MWMC Admin Fee
10.00
Date: 12/19/96
Page 1
Sq Ft
$0.00
$2,192.75
$3,541.49
$1,023.81
$440.37
$583.44
$6,317.68
$315.88
$6,633.56
,
Job Number: 961612
,
FIXTURE UNIT CALCULATION TABLE
Page 2
Fixture Type
Bathtub
Drinking Fountain
Floor Drain
Interceptors For Grease/Oil/Solids/Etc
Inteceptors For Sand/Auto washjEtc
Laundry Tub/Clotheswasher
Clotheswasher - 3 Or More
Receptor For Refrigerator/Water station/Etc
Receptor for Commercial Sink/Dishwasher/Etc
Shower, Single Stall
Shower, Gang
Sink, Bar, Commercial, Residential Kitchen
Urinal, Stall/Wall
Wash Basin/Lavatory, Single
Water Closet, Public Installation
Water Closet, Private
Miscellaneous
TOTAL FIXTURE UNITS
Number of
New Fixture
Unit
Equivalent
Fixture
units
o
o
o
o
o
o
o
o
o
o
o
2
2
5
6
o
o
2
1
2
3
6
2
6
1
3
2
o
o
o
o
o
o
o
o
o
o
o
4
4
5
36
o
o
2
2
1
6
4
49
CREDIT CALCULATION TABLE: Based on assessed value. If improvements occured
after annexation date, credits are calculated separately.
(calculations are by $1000)
Year Annexed: 1985
Credit For Parcel Or Land Only If Applicable:
Improvement (if after annexation date) :
160,720
2.74
440.37
X
o
2.74
0.00
X
CREDIT TOTAL =
$440.37
(If land value is multiplied by 1 then the parcel/land credit is not accurate.)