Loading...
HomeMy WebLinkAboutPermit Electrical 2001-8-9 Th;&,wing project 8S submitted has the following '-zo..nd does not require specific land use ...,. _'_'_. 225 FIFrH S1REET ---ap, u)l2. ELEC~PERMIT APPLICATION SPRINGFIELD OREGON 97477 Zoning ~ INSPECTION REQUEST:oili!P,nn"O '/01 6:'J Ul:..mber 6 (-00 X os- Z -0 I OFFICE, 726-3759 Authorizad Signature 3, COMPLETE FEE SCHEDULE BELOW 1. LOCATION OF IN,$TALLATIOl'l II.-fl.{ 5<:' It- """ -r A, New Residential-Single or Multi-Family per dwelling unit. SelVice Included: LEGAL DESCRIPTION 170~3.h3,7 00 900 JOB DESCRIPTION r-;..-~ Perntits are non-transferable and expire if work is not started within 180 days of issuance or if work is suspended for 180 days, 2, CONTRACTOR INST ALLATION ONLY Electrical Contractor Address \ Supervisor License Nu Cit'! Expiration Date Constr Contr. umber \ Expiratio Date re of Supervising Electrician ownersNam~Aa-Y2...~ ( h s "'- frs-1- Address /,-<q ~ City <; p ~ .D Phone OWNER INSTALLATION The installation is being made on ,,,up_a! I own which is not intended for sale, lease or rent. Owners Signature: I r;) ,~~~~AA l:90:t13IHS~ : 39N\JH:J 9~'99 $ G:Q:J3t1 lW\J l:OOG 60 9n\J:31\JQ Y6~9000-l:0:#SN\)~1 1000 sq,ft, or less Each additional 500 sq, ft or portion thereof Each Manufd Home or Modular Dwelling SelVice or Feeder B, SelVices or Feeders Installation, Alterations or Relocation: 200 amps or less 20 I amps to 400 amps 40 I amps to 600 amps 60 I amps to 1000 amps Over 1000 ampslvolts Reconnect Ouly C, Temporary SelVices or Feeders Installation, Alteration or Relocation 200 amps or less 201 amps to 400 amps Over 401 to 600 amps Over 600 amps or 1000 volts see liB" above D, Branch Circuits New Alteration or Extension Per Panel One Circuit Items Cost Sum $106,00 $ 19.00 $ 50,00 $ 63,00 $ 75,00 $125,00 $163,00 $375,00 $ 50,00 $50,00 $69,00 $100,00 $43,00 Each Additional Circuit or with SelVice or Feeder Perntit ~$3,OO_ E, Miscellaneous (SelVice/feeder not included) -Each installation Pump or irrigation Sign/Outline Lighting Limited Energy/Res Limited Energy/Comm $50,00 $50,00 $25,00 $45,00 5, SUBTOTAL OF ABOVE 7% State Surcharge 8% Administrative Fee Minimum Electric Permit Inspection Fee is $45.00 + Surcharges LfrJ; TOTAL II 'Sb'S-