Loading...
HomeMy WebLinkAboutPlan, Final APPLICANT 10/29/2012f• i.7 tqo ut tze -� co m cc � 1 t oil 4 EWEB PROJECT NO. 29719 BLACK & VEATCH NO. 173747 VICINITY-MA-P NO SCALE VRAWING AND- -PRO_CE_SS____AREA DESIGNATION SYSTEMS 1. DRAWING ARE SUBDIVIDED BY DISCIPLINE AS FOLLOWS: G GENERAL M MECHANICAL, HEATING, C CIVIL. VENTILATION & AIR CONDITIONING A ARCHITECTURAL L LANDSCAPING S STRUCTURAL E ELECTRICAL I INSTRUMENTATION GENERAL STANDARD SHEET DRAWINGS IN EACH DISCIPLINE ARE NUMBERED 1 TO 99. THE REMAINING DRAWINGS, AND EQUIPMENT, GENERALLY ARE NUMBERED IN ACCORDANCE WITH THEIR ASSOCIATED PROCESS AREA AS FOLLOWS. 0, SITE AREA INTAKE 1 INTAKE 2 COMPRESSOR BUILDING ELECTRICAL. BUILDING ae it • . � 1- 99 100-199 200-299 300 --399 400 --49!9 SECTION. AND DETAIL DESIGNATIONS DETAIL, LETTER DRAWING FROM WHICH DETAIL IS TAKEN DRAWING WHERE a DETAIL APPEARS DRAWING FROM WH SECTION IS TAKEN ,....,.,�._. LETTER DRAWING MHERE SECTION APPEARS DETAIL OR SECTION LETTER DETAIL QR.,.,.,SEC110Nto_A DETAIL NA i " =1" 1 1 DRAWING FROM WINCH DRAVANG WHERE DETAIL OR DETAIL OR SECTION IS TAKEN SECTION APPEARS f INDEX OF DRAWINGS GENERAL 1 G1. TITLE SHEET, VICINITY MAP AND INDEX OF DRAWINGS 2 G4 LEGEND 3 G7 NOTES AND ABBREVIATIONS CIVIL M13 HVAC EQUIPMENT SCHEDULES 4 Cl DEMOLITION AND EXCAVATION PLAIN 5 C4 GENERAL SITE PLAN 8 C7 DEMOL111ON PIPING PLAN 7 C10 YARD PIPING PLAN 8 C11 YARD PIPING PROFILE 9 C16 CIVIL DETAILS 1 10 C19 CIVIL DETAILS 2 11 C21 CIVIL. DETAILS 3 STRUCTURAL M204 INTAKE 2 - OPERATING DECK PLANS 12 S1 GENERAL NOTES 1 13 S4 GENERAL NOTES 2 14 S5 ELECTRICAL EQUIPMENT PAD -- PLAIN AND SECTIONS 15 S7 DETAILS 1 18 S10 STANDARD STEEL DETAILS 17 S13 SCHEDULE AND DETAILS 18 S16 SI GN DETAILS 19 5101 INTAKE 1 — BUILDING DEMOLITION PLAN AND ELEVATION 20 5104 INTAKE 1 -- BUILDING PLAN AND ELEVATION 21 S107 INTAKE 1 --- SECTION 22 S110 INTAKE 1 --- TEE - SCREEN PIPE SUPPORT AND DETAILS -23 S113 INTAKE 1 - TUNNEL PLAN AND ELEVATION 24 S116 INTAKE 1 - TUNNEL SECTIONS AND DETAILS 25 S119 INTAKE 1 — TUNNEL DETAILS 1 28 S122 INTAKE 1 — TUNNEL DETAILS 2 27 S125 INTAKE 1 -- WETWEL.L BAFFLES --- PLAN AND DETAILS 28 S128 INTAKE 1 -- VALVE VAULT PLAN AND ELEVATION 29 S131 INTAKE 1 — OPERATING DECK AND IN- --FILL FLOOR DETAILS 30 S134 INTAKE 1 ROME PLAN AND DETAILS 31 S137 INTAKE 1 -- CONCRETE DETAILS 1 32 S201 INTAKE 2 -- CONCRETE DETAILS 1 33 S301 COMPRESSOR BUILDING FLOOR -W- PLAIN AND SECTIONS 34 S302 COMPRESSOR BUILDING - ELEVATIONS 35 S303 COMPRESSOR BUILDING - ROOF PLAN 36 S304 COMPRESSOR BUILDING - DETAILS 1 37 S305 COMPRESSOR BUILDING -- DETAILS 2 38 S305 COMPRESSOR BUILDING --- STAIR DETAILS 39 S307 COMPRESSOR BUILDING — DETAILS 3 40 S308 MISCELLANEOUS DETAILS 1 41 S309 MISCELLANEOUS DETAILS 2 MECHANICAL 42 M1 INTAKE SCREENS AND SCS DESIGN CRITERIA 43 M7 MECHANICAL DETAILS 44 M10 HVAC LEGEND, ABBREVIATIONS AND GENERAL NOTES 45 M13 HVAC EQUIPMENT SCHEDULES 48 M101 INTAKE 1 -- TEE --- SCREENS PLAN AND SECTIONS 47 M102 INTAKE 1 --- TEES- SCREENS DETAIL 48 M110 INTAKE 1 - WETWELL BAFFLES PLAN AND SECTIONS 49 M113 INTAKE 1 -- PIPING DECK PLANS 50 M116 INTAKE 1 — OPERATING DECK PLANS 51 M119 INTAKE 1 — HVAC PLAN AND SECTION > 52 M122 INTAKE 1 -- SECTION 53 M201 INTAKE 2 - PIPING DECD PLAINS 54 M204 INTAKE 2 - OPERATING DECK PLANS 55 M210 INTAKE 2 - SECTION 55 M301 COMPRESSOR BUILDING --- PLAN AND SECTION 57 M304 COMPRESSOR BUILDING - HVAt PLAN, ROOF PLAN AND INSTRUMENTATION AND CONTROL 58 11 P&ID SYMBOLS AND ABBREVIATIONS 59 13 I &C DETAILS 60 1100 f. P&ID PUMP STATION AND INTAKES 81 1301 P&dD COMPRESSOR BUILDING -- SCREEN CLEANING SYSTEM ELECTRICAL. 62 E1 ELECTRICAL. LEGEND AND ABBREVIATIONS 63 E4 ONES -LINE DIAGRAM -r DEMOLITION 64 E7 ONE -LINE DIAGRAM PART A 65 E8 ONE --LINE DIAGRAM PART B 86 E10 SITE AND GROUNDING PLAIN 67 Ell DETAILS 88 E19 CONDUIT & WIRE SCHEDULE 89 E22 PANEL SCHEDULES 70 E25 SCHEMATICS 71 E101 INTAKE 1 - OPERATING DECK - DEMOLITION PLAN 72 E102 INTAKE 1 -- OPERATING DECK - POWER & CONTROL PLAN 73 E103 INTAKE 1 - OPERATING DECK - LIGHTING PLAN 74 E104 INTAKE 1 - .PIPING DECK - LIGHTING PLAIN 75 E201 INTAKE 2 -- OPERATING DECK -- DEMOLITION PLAN 75 E202 INTAKE 2 - OPERATING DECK - PONDER k CONTROL PLAIN 77 E301 ELECTRICAL BUILDING - DEMOLITION PLAN 78 E302 ELECTRICAL BUILDING -- POWER & CONTROL PLAN 79 E401 COMPRESSOR BUILDING - POWER & CONTROL PLAN 80 E402 COMPRESSOR BUILDING y- LIGHTING PLAN FINAL SITE PLAN OCT 02 9 2012 i r WARN= I� BLACK & VEATCH 0 � �. 9uftm = world of t6 caw X35 MEADOWS AOAD, SUME 700 TEL X03} 699.7556 IF 7HIS BAR DOES NOT IN E'' Mack vesteh cotpo3ration OSWEGO. OREGON 97WS FAX (503) 597.3599 irtEASURE 3 THW LRiwiM IS 65 $P t. Sses, oes�sri INFORMAVON S14OWN t5 FOR EWES USE ONLY AND IS NOT WARRANTED TO BE ACCURATE FOR UNMEMED PURPOSEL WT TO SCALE ft��tC BY CNlC A#�P SCAM: Ht'3 SCALE Co)VSULI jMCv � COUNTRY CLUB ROAD, SUITE 100 TEL (541) 6M -sty WATER SYSTEMS O EmmNEERs EUGENE �G�t+l 974ol FAX dal j -W6 DES c� ��v� �vo �r DATE BY CK ��� HAYDEN BRIDGE RAW MATER INTAKE IMPROVEMENTS OWN acv s0s vE GENERAL E ' EPSILON 1970 SW MCCA&EYROAD TEL (503) 526-10W SPONSOR � V t� mo REV s TITLES SHEET, VICINITY MAP AND INDEX OF DRAWINGS EXPIRES: 12-31 ENGtNEERIN�„ INC. P�?R LAS, OREGON FAX {} �2� -1t�2 D�,43�► I �,G � DATE: 44-2012 EUGENE WATe t L ELECDOC BOARD - EUGENF, ORE-GON SH 1 OF BO Co pct OCT 2 4 2012 Final $0mittal __.