May 29, 2007
Project: 80.07
Van Darn Construction, Inc.
880 So. 45th PI.
Springfield, OR 97478
Subject: Special inspection summary
Foundation underpinning of existing single-family residence
Springfield permit no. COM2007 -00706
6852 Ivy St, Springfield, Oregon
PURPOSE AND SCOPE
As requested, K & A Engineering, Inc. has made a special inspection of installation of four steel helical piers and
. brackets to underpin the northeast comer of the foundation of the existing single-fafTlily residence ~t the subject
project site. K & A Engineering, Inc. made design drawings and speCifications for flis underpinning, dated May
14,2007.
The purpose of our inspection was to verify pier installation, subsurface soil conditions, and adequate load
I
capacity for the installed piers. The scope included a site inspection and this repor;.
INSPECTION
Four helical piers and brackets were installed at locations specified in our design ra commendations. Piers
consisted of 2.875-inch diameter tubular steel shafts having one a-inch and one 10-inch at the end of each pier.
The steel piers metthe design specifications for materials and construction. Piers Were installed to depths
greater than our recommended minimum, with an estimated uttimate capacity exc~eding our required 36-kip
minimum. An as-built pier plan is attached to this report, and table 1 summarizes pier installation.
Brackets consisted of pre-fabricated, factory-constructed units having a certified c~pacity exceeding our
specified 20-kip minimum. Brackets were installed into neatly cut notches in the f90ting as specified, and
connected to the foundation as per our requirements. The pier shafts were permar ently attached to the
brackets using materials and methods recommended by the pier bracket manufact Irer.
May. 29. 2007 2:51PM
K & A Engineering, Inc.
Table 1 - Pier Installation Summary
Pier No. (refer to
As-Built Repair
Plan)
1
2
3
4
Max. Drive Heal
Pressure at
Installed Depth, psi
1,800
1,750
1,800
1,800
Estimated
Ultimate
Capacity, kiPSl
61
60
61
61
Installation
Depth, ft.
14.5
12.0
.16.0
21.0
No.1819 P. 3
After pier and bracket installation, the foundation was lifted to a near-level condition 1nd the pier brackets were
permanently attached to and supported by the pier shafts.
SUMMARY AND RECOMMENDATIONS
The underpinning was constructed using materials and methods that met our specifi ~ations writing in the design
drawings and specifications for this project. We recommend acceptance of the und !rpinning, as-built, by the
local building official.
Thank you for the opportunity to be of service. Please call n you have any questiom .
Sincerely,
""RES bf:z/'f
Michael Remboldt, P.E.
K & A Engineering, Inc.
1 The required minimum ultimate capacity was 36-kips.
Project 80.07
Client: Van Dom Construction
6852 Ivy St., Springfield, Oregon
Page 2 of 2
May 29, 2007
Mav.29.02007 2:52PM
No.1819 P. 4
'k-a
engineering
geotechnical/civil
engineering
Eugene, OR 97408
541 684 9399 541 684 9358 fax
"
prOi~Gt: 68521vv S1.. Sorinafield. OR
Client: Van Dorn Constr.
I
Job No: 80.07 Date: 5/2912007
Sheet: 1 of 1
" .
\
/
44'
I 8' I -1'
I I
r.-- ------ -- - - - - - - ------~ - -;- ---W-,
I f
1 r-- --~- -- - -------- --;:S:;;IL~O~l1-;NSO -71\ :
NEW STEa HEUCAL PIERS to
I I AND SlEEL PIER BRACKETS I ~
I I 4 TOTAL -l- - ~
i L________________, ~, i .1
: ~---------~-------J : ~}
I I I I
I I I I
I I I I
"J-. I I I
I . ,. I
I I I
I I I
I I I
L__________________________~. I
i----------i i--------~~-ro~~~.
I I I
I I I
I I I
I I I
I I I
I I I
I I I
I I I
I L__________-l I
L .1
______-------:J
re
~ AS-BUILT REPAIR PLAN
\2.J 1/8" = 11..0"
~I
o
"
,/