HomeMy WebLinkAboutSpecial Inspection Field Test & Inspection Report 2007-5-29 \ May. 29. 2007 2:51PM No.1819 P. 2 ;r I K & A Engineering, Inc. 3327 Roanoke Ave., Eugene, OR 97408 (541) 684-9399 Voice (541) 684-9358 fAX engineering May 29, 2007 Project: 80.07 Van Darn Construction, Inc. 880 So. 45th PI. Springfield, OR 97478 Subject: Special inspection summary Foundation underpinning of existing single-family residence Springfield permit no. COM2007 -00706 6852 Ivy St, Springfield, Oregon PURPOSE AND SCOPE As requested, K & A Engineering, Inc. has made a special inspection of installation of four steel helical piers and . brackets to underpin the northeast comer of the foundation of the existing single-fafTlily residence ~t the subject project site. K & A Engineering, Inc. made design drawings and speCifications for flis underpinning, dated May 14,2007. The purpose of our inspection was to verify pier installation, subsurface soil conditions, and adequate load I capacity for the installed piers. The scope included a site inspection and this repor;. INSPECTION Four helical piers and brackets were installed at locations specified in our design ra commendations. Piers consisted of 2.875-inch diameter tubular steel shafts having one a-inch and one 10-inch at the end of each pier. The steel piers metthe design specifications for materials and construction. Piers Were installed to depths greater than our recommended minimum, with an estimated uttimate capacity exc~eding our required 36-kip minimum. An as-built pier plan is attached to this report, and table 1 summarizes pier installation. Brackets consisted of pre-fabricated, factory-constructed units having a certified c~pacity exceeding our specified 20-kip minimum. Brackets were installed into neatly cut notches in the f90ting as specified, and connected to the foundation as per our requirements. The pier shafts were permar ently attached to the brackets using materials and methods recommended by the pier bracket manufact Irer. May. 29. 2007 2:51PM K & A Engineering, Inc. Table 1 - Pier Installation Summary Pier No. (refer to As-Built Repair Plan) 1 2 3 4 Max. Drive Heal Pressure at Installed Depth, psi 1,800 1,750 1,800 1,800 Estimated Ultimate Capacity, kiPSl 61 60 61 61 Installation Depth, ft. 14.5 12.0 .16.0 21.0 No.1819 P. 3 After pier and bracket installation, the foundation was lifted to a near-level condition 1nd the pier brackets were permanently attached to and supported by the pier shafts. SUMMARY AND RECOMMENDATIONS The underpinning was constructed using materials and methods that met our specifi ~ations writing in the design drawings and specifications for this project. We recommend acceptance of the und !rpinning, as-built, by the local building official. Thank you for the opportunity to be of service. Please call n you have any questiom . Sincerely, ""RES bf:z/'f Michael Remboldt, P.E. K & A Engineering, Inc. 1 The required minimum ultimate capacity was 36-kips. Project 80.07 Client: Van Dom Construction 6852 Ivy St., Springfield, Oregon Page 2 of 2 May 29, 2007 Mav.29.02007 2:52PM No.1819 P. 4 'k-a engineering geotechnical/civil engineering Eugene, OR 97408 541 684 9399 541 684 9358 fax " prOi~Gt: 68521vv S1.. Sorinafield. OR Client: Van Dorn Constr. I Job No: 80.07 Date: 5/2912007 Sheet: 1 of 1 " . \ / 44' I 8' I -1' I I r.-- ------ -- - - - - - - ------~ - -;- ---W-, I f 1 r-- --~- -- - -------- --;:S:;;IL~O~l1-;NSO -71\ : NEW STEa HEUCAL PIERS to I I AND SlEEL PIER BRACKETS I ~ I I 4 TOTAL -l- - ~ i L________________, ~, i .1 : ~---------~-------J : ~} I I I I I I I I I I I I "J-. I I I I . ,. I I I I I I I I I I L__________________________~. I i----------i i--------~~-ro~~~. I I I I I I I I I I I I I I I I I I I I I I I I I L__________-l I L .1 ______-------:J re ~ AS-BUILT REPAIR PLAN \2.J 1/8" = 11..0" ~I o " ,/