COMMERCIAL/INDUSTRIAL PERMIT APPLICATION
CITY OF SPRINGFIELD Job Number: 951831
COMMUNITY SERVICES DIVISION
BUILDING SAFETY
225 North Fifth Street
Springfield, OR 97477
Office: 726-3759
Inspection Line: 726-3769
Location of Proposed Work: 2705 PHEASANT BLVD
Asiessors Map #: 17032200
Tax Lot #: 02701
Owner: CITY OF SPRINGFIELD
Address: 225 FIFTH STREET
Phone #: 726-2096
City/State/Zip: SPRINGFIELD, OREGON 97477
Description Of Work: FIRE STATION #5
NEW Value: 0,00
Contractor
Const.
Contractor # Expires Phone
General:
DORMAN 0068801
32986 ROBERTS CT., COBURG, OR 97408
08/21/96
984-0012
--- PLUMBING ---
No.
25
Fee
Charge
250,00
85.00
40.00
235,00
40,00
20.00
Single Fixture
Sanitary Sewer
Water Service
Storm Sewer
65' FIRE LINE
2 BACKFLOW DEVICES
366
65
1412
ft,
ft.
ft,
TOTAL PERMIT
670.00
--- MECHANICAL ---
No.
Fee
Charge
36,00
4.50
9.00
18,00
9,00
4.50
3,00
10,00
3
Furnace/burner & vent < 1000,000 BTUs
Mechanical exhaust hood and duct
Vent Fan/Single Duct
3 HEAT PUMP UNITS
2 VENT SYSTEMS
GAS PIPING
AIR OUTLETS
Permit Issuance
TOTAL PERMIT
103.00
HANDICAP ACCESS: Y
# OF BLDGS: 1
CONSTR, TYPE: 5-N, SPR,
-- OFFICE USE
QUAD AREA: 1 CNW
ZONING CODE: CC
HEAT SOURCE: G
LAND USE: 5300
OCCY GROUP: B-2
Item
Sq, Ftg Main
Square Feet
8971
x
$/Square Feet
Value
863,820.00
TOTAL YALUE OF PROJECT
863,820.00
Plan Check Fee:
2,231,45 Rec #: 19681
'.
,
Job Number: 951831
Page 2
Date: 11/27/95 Rec By: LISA HOPPER
BUILDING
Surcharge/Admin
MECHANICAL
Surcharge/Admin
PAVING VALUE
PLUMBING
Surcharge/Admin
FENCE VALUE
CURB CUT
34,000.00
1,879,00
150.32
103,00
7.44
433.00
670,00
53.60
5,00
22,00
100,000.00
SUBTOTAL PERMITS
SYSTEMS DEVELOPMENT
3,323,36
~793,:;)-S~
6,116.47
TOTAL PERMIT FEES EXCLUDING ELECTRICAL
REQUIRED INSPECTIONS
It is the responsibility of the permit holder to see that all inspections are
made at the proper time. To request an inspection, call 726-3769
(recorder), state your City designated job number, job address, type of
inspection requested and when you will be ready for inspection. Requests
received before 7:00 a,m, will be made the same working day, requests made after
7:00 a.m will be made the following work day.
Special Inspections: In accordance with
a special inspector shall be employed by
construction of any following "*" work,
shall be furnished to Building Safety.
Section 306 of the State Specialty Code
the Owner/Contractor during
A copy of the special testing reports
In addition to the inspections specified, the Building Official may make or
require other inspections of any construction work to ensure compliance with
the Building, City or Development Code,
TEMPORARY POWER
UNDERGROUND ELECTRICAL - Prior to Cover.
UNDERGROUND PLUMBING - Prior to filling trench.
FOOTING - After trenches are excavated.
FOUNDATION - After forms are erected but prior to concrete placement,
SLAB - To be made after all inslab building service equipment, conduit
piping, and other equipment items are in place but prior to concrete
MASONRY - Steel location, bond beams grouting or verticals in
accordance with UBC 2415,
ROUGH PLUMBING - Prior to cover.
ROUGH MECHANICAL - Prior to cover,
ROUGH ELECTRICAL - Prior to cover,
FRAMING - Prior to cover,
INSULATION - Floor; prior to decking Wall/Ceiling; Prior to cover
DRYWALL - Prior to taping,
CURB CUT - After forms are erected but prior to placement of concrete,
ROUGH GRADING - After gravel is in place but prior to placing concrete
FINAL PAVING - After paving is complete.
FINAL PLUMBING - When all plumbing work is complete.
FINAL MECHANICAL - When all mechanical work is complete,
ELECTRICAL SERVICE - Must be approved to obtain permanent power,
FINAL ELECTRICAL - When all electrical work is complete,
FINAL FIRE - When all Fire Department requirements have been met,
been met,
"f
, ":;,I'M.}jl=t~;,)j'l
Job Number: 951831
Page 3
FINAL SITE PLAN - After all requirements have been met for Minimum
Development Standards or from the Development Agreement.
INSUL-V.B./SUB: TO BE CALLED FOR AT SAME TIME AS SUB FRAMING INSPECT
MECH/SUB: FOLLOWING ROUGH MECHANICAL APPROVAL, PRIOR TO COVER
CEILING GRID/SUB:
FINAL/SUB
FINAL BUILDING - When all required inspections have been approved and
the building is complete.
- - - ADDITIONAL COMMENTS
DRC #94-12-249, PLANNER IS GARY KARP
SITE REVIEW JOURNAL 94-12-249, KARP/LEZELL
Plans Reviewed By: LORNE PLEGER
Building Site Reviewed By: LISA HOPPER
Date: 01/03/96
By signature, I state and agree, that I have carefully examined the completed
application and do hereby certify that all information hereon is true and
correct, and I further certify that any and all work performed shall be done
in accordance with the Ordinances of the City of Springfield, and the Laws
of the State of Oregon pertaining to the work described herein, and that
NO OCCUPANCY will be made of any structure without permission of the
Community Services Division, Building Safety. I further certify that only
contractors and employees who are in compliance with ORS 701.055 will be
used on this project.
I further agree to ensure that all required inspections are requested at the
proper time, that project address is readable from the street, that the
permit card is located at the front of the property, and the approved set
of plans will remain on the site at all times during construction.
4:-~~
b-2 {- ct6
Signature
Date
--- VALIDATION
Date Paid:
'22./6&>
6-.2/"~
~ 52'3. -=3"~
/Z~
/~~ ,
Receipt Number:
Amount Received:
Received By:
~ -
t."
.
City of Springfield
225 Fii"-\th S+tf"'eet
Spr'ingfield, OR 974'?7
{ :)O.,:5} "(26--3(75~j
Transaction number 022153
June 21, 1996 3:54 PM
~eceived f~om: CITY OF SPRINGFIELD
:ont~act/Own : F'IRE STATION Ol~ PHEASANT
~ddress~ 225 F'IFTH Sl'REE1'
:ity~ SPRINGFIELD
ot: OR Zip: 97477
-'B1lildi€"lg-
Job *: 0
)€:.\~.cr'ipt :i.on
Fe(~
:'l~m Check/Coiil!'!1
-:L,01O.iO
-ri i !:.Cl::~ J.l ':,H'lE'OUS--
h'~,.cr'ipt ion
Fee
~ir~e StatiOl\ FIJnd
:t,OiO.:tO
T(rl;.~l; ,,00
Thank you, Lorne P.