HomeMy WebLinkAboutOrdinance 6317 04/21/2014ORDINANCE NO 6317 (General). AN ORDINANCE OF THE CITY OF SPRINGFIELD AMENDING ARTICLE 1, TABLE 3 -A STRUCTUAL PERMIT FEES; TABLE 3 -B ELECTRICAL PERMIT FEES; TABLE 3 -C PLUMBING PERMIT FEES; TABLE 3 -D MECHANICAL PERMIT FEES; TABLE 3 -F OTHER INSPECTION AND FEES OF THE "SPRINGFIELD BUILDING SAFETY CODE ADMINISTRATIVE CODE" OF THE SPRINGFIELD DEVELOPMENT & PUBLIC WORKS DEPARTMENT; COMMNITY SERVICES DIVISION "BUILDING SAFETY CODES" ' WHEREAS, the Building Safety Codes specifies that rates, permit fees, license fees, and other fees and charges are adopted by Ordinance of the Common Council; and WHEREAS, the proposed Building Safety Codes amends permit and other fees listed in Table 3 -A, Table 3 -6, Table 3 -C, Table 3 -D, and Table 3 -F, which are amended as specified in the attached Exhibit A of this Ordinance. NOW THEREFORE, THE CITY OF SPRINGFIELD DOES ORDAIN AS FOLLOWS: Section 1: Amend the building Safety Codes, Article 1; as specified in Table 3 -A Structural Permit Fees; Table 3 -B Electrical Permit Fees; Table 3 -C Plumbing Permit Fees; Table 3 -D Mechanical Permit Fees; and Table 3 -F Other Inspections and Fees as allowed under Oregon Revised Statute 455.210 (3)(a) which allows a municipality to adopt by ordinance or regulation such fees as may be necessary and reasonable to provide for the administration and enforcement of any specialty code or codes for which the municipality has assumed responsibility. Section 2:. In the event a particular rate, permit fee, license fee, or other fee or charge previously adopted in the Building Safety codes or by Ordinance has been inadvertently omitted from those designated in Article 1 incorporated herein by reference, such rate, permit fee, license fee or other fee or charge shall be deemed to be included and incorporated into this Ordinance and adopted here in by reference. It is the intent of this Ordinance to reestablish all such omitted fees and charges at the amounts that they existed immediately prior to this Ordinance. Section 3: If any particular rate, permit fee, and other fee or charge should be held invalid by operation of law or any court of competent jurisdiction or the enforcement of any fee restrained by such court pending the final determination as to its validity, the remainder of the rates, permit fees, and other fees and charges specified in Exhibit A of this Ordinance, the Building Safety Codes, Article 1, shall not be affected thereby and shall remain in full force and effect. Section 4: Future Ordinances of the Common Council may be adopted to amend, add, or delete any rate, permit fee, license fee, or other fee or charge. ADOPTED by Common Council of the City of Springfield this 21st day of April, 2014 by a vote of 6 for and 0 against. APPROVED by the Mayor of the Attest: Amy Sowa, I Recorder City of Springfield this 21st day of April, 2014 Mayor REVIEWED & APPROVED AS TO FO M DATE OFFICE OF CITY. ATTORNEY ORDINANCE NO. 6317 Section 6: Building and Safety Fees EXHIBIT A, Page 1 of 10 City of Springfield Community Services Division Building Safety Fee Schedule Effective May 21, 2014 Fees Based on City Council Action of 7/16/2001,12/2/2002, 11/1/2004 1/17/2004,1/18/2005,3 /6/2006, 7/2/2007,6/2/2008 5/21/2014 And ORS455.210, 455.220, 455.842, and 455.844 ORDINANCE N0. 6317 Section 6: Building and Safety Fees EXHIBIT A, Page 2 of 10 Section 6: Building and Safety Fees The following fees shall be charged for the Building and Safety activities of the City: :Site Plan Review Reduction in fee, Resolution 10 -51 To the following fees, please add a $2.50 Continuing Education Fee. !Building Permits (ORS 455.447) Structural, Commercial and Mechanical Permit Fees Table No. 3 -A TOTALVALUE Fee Fee $1.00 - $2,000 Each additional 500 sq.ft. or portion thereof $82.00 $2,001 - $25,000 for the first $2,000 in value $82.00 $71.00 plus for each additional $1000 or fraction thereof. $10.52 $25,001- $50,000 for the first $25,000 in value $324.00 $91.00 plus for each additional $1,000 or fraction thereof $8.00 $50,001- $100,000 for the first $50,000 in value $524.00 plus for each additional $1,000 or fraction thereof $5.10 $100,001 and Up for the first $100,000 in value $779.00 plus for each additional $1,000 or portion thereof $4.38 In addition to the Building Permit Fee, the Plan Check Fee shall be 65% of the Building Permit fee. For the purpose of defraying the cost of applying regulations as provided in ORS 455.447 a surcharge of 1% to the total fees collected for essential, hazardous, major and special occupancy structures shall be collected. To the above, please add 12% State Surcharge. To the above fees, please add a $2.50 Continuing Education Fee. Electrical Perm_ its Table No. 3 -B Description Fee Residence wiring less than 1000 square feet $151.00 Each additional 500 sq.ft. or portion thereof $28.00 Manufactured Home or Modular Dwelling (Service or Feeder) $71.00 Temporary Power— 200 amps or less $71.00 Temporary Power -201 to 400 amps $98.00 Temporary Power -401 to 600 amps $142.00 Permanent Service or Feeder— 200 amps or less $91.00 Permanent Service or Feeder -201 to 400 amps $106.00 ORDINANCE NO. 6317 Section 6: Building and Safety Fees EXHIBIT A, Page 3 of 10 Permanent Service or Feeder -401 to 600 amps Permanent Service or Feeder— 601 to 999 amps Permanent Service or Feeder -1000 amps or volts Electrical Service Reconnection with no changes to existing service size One new /alteration /extension of circuit Each Additional Circuit Each Irrigation Pump Each Electrical Sign or Outline Lighting Each Signal Panel Limited Energy — Residential Limited Energy — Commercial /Multi - Family Inspections not covered by this schedule minimum 1 hour Re- inspection Fee Partial Inspection Inspections Outside Normal Business Hours Minimum Permit Fee Investigation Fee Inspections For Which No Fee is Specifically Indicated Electrical Quick Permits (sold in 10 only) No longer in Use Building Without Permit Penalty Electrical Plan Review To the above fees, Please Add 12% State Surcharge. To the above fees, please add a $2.50 Continuing Education Fee. Mechanical Permits (Residential) Mechanical Permit Fees Table No. 3 -D Description First Appliance HVAC Up to 100,000 btu More than 100,000 Unit Heater Boiler /Compressor Up to 100,000 btu$ 3 -15 Horsepower or 100,001— 500,000 btu Over 15 to 30 Horsepower or 500,001- 999,000 btu Over 30 to 50 Horsepower or 1,000,000 — 1,750,000 btu $178.00 $230.00 $527.00 $71.00 $62.00 $7.00 $71.00 $71.00 $71.00 $36.00 $82.00 $82.00 $82.00 $82.00 $97.00 $82.00 $82.00 $82.00 $ -O $ Permit Fee 25% of Permit Fee Fee $82.00 $19.00 $22.00 $19.00 $19.00 $33.00 $49.00 $64.00 ORDINANCE NO. 6317 Over 50 Horsepower or over 1,750,001 btu Air Handling Unit Up to 10,000 cfm 10,001 cfm and over Evaporative Cooler /Fan Vents Hood and Exhaust Vent Fan to One Duct Appliance Vent Gas Piping Each Piping System 1 -4 Outlets Each Outlet over 4 Air, Oxygen, Other Medical Specialty Piping Each Piping System 1 -4 Outlets Each Outlet over LP Gas Tank and Piping Miscellaneous Domestic Incinerator Section 6: Building and Safety Fees EXHIBIT A, Page 4 of 10 $107.00 $12.00 $22.00 $15.00 $15.00 $10.00 $10.00 $8.00 $5.00 $8.00 $ 5.00 $19.00 $22.00 Commercial Incinerator $84.00 Wood /Pellet Stove $43.00 Heat Pump $19.00 Preliminary Inspection $82.00 Each Appliance Not Listed on this Schedule $15.00 Inspections Not Covered by this Schedule $82.00 Re- inspection Fee $82.00 Supplemental Mechanical Fee *Not In Use* $_O_ Minimum Permit Fee $82.00 Partial Inspection $82.00 Inspections Outside Normal Business Hours $97.00 Investigation Fee $82.00 Building Without Permit Penalty $ Permit Fee Hourly Inspection Fee for Requests Not In Permit Tables $82.00 Mechanical Plan Review Fee 25% of Permit Fee Mechanical Quick Permits (sold in 10 only) No Longer Available $ -0- Commercial /Industrial /Public Mechanical System including installation costs Value To the above fees, please add 12% State Surcharge. To the above fees, please add a $2.50 Continuing Education Fee. For the purpose of defraying the cost of applying regulations as provided in ORS 455.447 a surcharge of 1% to the total fees collected for essential, hazardous, major and special occupancy structures shall be collected. Plumbing Permits Plumbing Permit Fees ORDINANCE NO. 6317 Section 6: Building and Safety Fees EXHIBIT A, Page 5 of 10 Table No. 3 -C Fees for the construction, alteration or repair of plumbing on one and two family dwellings, shall be calculated as described below. Fees include drain, waste and vent installation, water distribution piping, the first 100 feet of water service. One or two family with one bath $268.00 One or two family with two bath $420.00 One or two family with three bath $494.00 Each Additional Bath $107.00 Each Additional Kitchen $107.00 Single Plumbing Fixture $21.00 Sanitary Sewer: $82.00 For the first 100 feet of line $85.00 Each additional 100 feet of line or portion $21.00 Water Service: $_O_ the first 100 feet of line $85.00 Each additional 100 feet of line or portion $21.00 Storm and Rain Drain: For the first 100 feet of line $85.00 Each additional 100 feet of line or portion $21.00 Sewage Ejector Pump $21.00 Special Waste Connection $21.00 Manufactured Home hook up on improved lot $82.00 Backflow Prevention Device $21.00 Relocated Structure $82.00 Sanitary or Storm Sewer Cap $82.00 Any trap or waste not connected to a fixture $21.00 Any plumbing installation not listed in this schedule with sanitary waste or portable water supply $21.00 Minimum Plumbing Permit Fee $82.00 Partial Inspection fee $82.00 Re- inspection Fee $82.00 Inspections Not Covered By Schedule $82,00 Inspections Outside Normal Business Hours $97.00 Investigation Fee $82.00 Building Without Permit Penalty $ Permit Fee Accessible Minor Plumbing Labels NO LONGER AVAILABLE $_O_ Not Accessible Minor Plumbing Labels NO LONGER AVAILABLE $_O_ Hourly Inspection Fee for Requests Not In Permit Table $82.00 Medical Gas System Inspection Fees — Inspection fees for medical gas systems are a ORDINANCE NO. 6317 Section 6: Building and Safety Fees EXHIBIT A, Page 6 of 10 combination of Base Fee $ Value + Plus Each inlet or outlet Plan Review Fee for Med Gas $82.00 /hr but shall not exceed 30% of the total plumbing permit fee for the building or structure under review. When plans are incomplete or substantially changed so as to require additional plan review, additional plan review fees may be charged based on the additional time required. Plumbing Plan Review Fee Residential Fire Sprinklers 0001— 2000 Square feet 2001— 3600 Square feet 3601 — 7200 Square feet 7201 Square feet and greater 30% of Permit Fee $82.00 $131.00 $196.00 $261.00 ORDINANCE NO. 6317 To the above fees, please add 12% State Surcharge. To the above fees, please add a $2.50 Continuing Education Fee. !Additional Miscellaneous Fees Miscellaneous Building Fees Table No. 3 -F Please add 12% State Surcharge (Where Applicable) Description Section 6: Building and Safety Fees Fee Master Permit Program $100.00 Investigative Fee $82.00 Inspection For Which No Fee is Specifically Indicated $82.00 Moving a Building or Structure $327.00 Demolition of a Building or Structure $82.00 Mobile Home Accessory Structure $Value Prefabricated Structures $Value Hourly Inspection Fee for Requests Not In Permit Table $82.00 Address Assignment, each new or change unless requested by city staff $43.00 Temporary Occupancy Permit Approval Shall Not Exceed 30 Days Without Renewal. Renewal Fee is the Same Fee As Original Temporary Occupancy Permit Fee: $82.00 /hr 1 & 2 Family Dwellings $142.00 Triplex & 4 -flex $279.00 Apartment Buildings $279.00 + $34 /unit Remodels Commercial /Industrial Buildings & Tenant Infill $142.00 Commercial /Industrial Buildings $420.00.00 +10% of Bldg Permit Fee Same As Plan Review Submittal $281.00 Building Without Permit Penalty Fee $Bldg Permit Manufactured Home Placement $447.00 Fire & Life Safety Plan Review When Required 40% of Building Permit Fee Additional Plan Review Due To Changes In Plans $82.00 /hr Hazardous Technical Report with No Plan Review $82.00 /hr Site Investigation and Posting of NSF Check $82.00 Administrative Fee for Non - Sufficient Funds Check $142.00 Administrative Fee — Non Specialty Code Permits 10% Administrative Fee for Cash Deposits 10% Inspections Outside Normal Business Hours —1 hour minimum $97.00 Re- inspection Fee $82.00 Quick Start $213.00 Not in Use Research Requests Technical (15 -30 minutes) $28.00 Technical (31 -60 minutes) $57.00 Non - Technical (15 -30 minutes) $19.00 Non - Technical (31 -60 minutes) $35.00 Exhibit A - Ordinance Page 7 ORDINANCE NO. 6317 Section 6: Building and Safety Fees Any copy fee is in addition to research fees. 30 Minutes is minimum fee Posting Substandard Structures $82.00 Monthly Reports — Yearly "Mailing' List $72.00 /mailed $42.00 /faxed Weekly Issued Reports — Yearly "Mailing' List $310.00 /mailed $172.00 /faxed Addressing Information —Non Agency- Government Yearly "Mailing" List Fire Department Process /Application Fee $72.00 /mailed $42.00 /faxed 10% of Fire fee Exhibit A - Ordinance Page 8 ORDINANCE NO. 6317 Section 6: Building and Safety Fees City of Springfield Community Services Division Building Valuation Data The valuation of building construction for building permit purposes shall be the actual total construction cost for the proposed project, including all classes of work. Section 108.3 of the Oregon Structural Specialty Code (OSSC) and the Oregon Residential Specialty Code (ORSC) require permit valuation to include the total value of the work for which a permit is being sought, such as architectural, structural, electrical, gas, mechanical, plumbing equipment and other permanent systems, including material and labor. The applicant for a permit shall provide an estimated permit value at the time of application. If, in the opinion of the Building Official, the valuation is underestimated on the application, the permit shall be denied unless the applicant can provide detailed cost estimates to meet the approval of the Building Official. Final building permit valuation shall be set by the Building Official. The valuation tables below are square foot default tables for certain Occupancies and Type of Construction, provided as a courtesy for permit applicants and are to be used only as a beginning estimate of construction costs where accurate estimates of construction costs have not been determined prior to permit application. As stated previously, permit valuation shall be based on the actual cost of construction. Grou 21CC IA 113 IIA 1113 IIIA IIIB IV VA VB Assembly, rtheaters with Al e 212.00 204.85 199.65 191.24 179.60 174.56 184.86 164.20 157.69 A1.1 Assembly, theaters without A1.1 stage 194.08 186.93 181.72 173.31 161.68 156.64 166.93 146.29 139.78 A2 Assembly, A2 nightclubs 166.35 161.60 157.13 150.84 141.62 137.83 145.25 128.47 123.67 A2.1 Assembly, restaurants, bars, banquet A2.1 halls 165.35 160.60 155.13 149.84 139.62 136.83 144.25 126.47 122.67 A3 Assembly, A3 I churches 195.96 1 188.81 183.60 175.20 163.70 158.66 168.82 1 148.30 141.80 A3.1 Assembly, general, community halls, libraries, AM museums 163.95 156.80 150.60 143.19 130.66 126.63 136.81 115.27 109.76 A4 Assembly, , A4 arenas 193.08 185.93 179.72 172.31 159.68 155.64 165.93 144.29 138.78 B B Business 169.14 162.95 157.42 149.72 135.78 130.75 143.54 119.31 113.65 E E Educational 178.16 172.02 166.90 159.29 148.37 140.44 153.73 129.09 124.71 F1 Factory and industrial, F1 I moderate hazard 100.75 96.02 90.26 86.94 77.68 74.37 83.16 64.01 60.19 F2Factory and industrial, low F2 hazard 99.75 95.02 90.26 85.94 77.68 73.37 82.16 64.01 59.19 H1 High Hazard, H1 explosives 94.40 89.68 84.92 80.59 72.52 68.22 76.82 58.86 0.00 H2,3,4 High H2 Hazard 94.40 89.68 84.92 80.59 72.52 68.22 1 76.82 58.86 54.03 [HH2,3,4 High 3 94.40 89.68 84.92 80.59 72.52 68.22 1 76.82 58.86 54.03 Exhibit A - Ordinance Page 9 ORDINANCE NO. 6317 Section 6: Building and Safety Fees Exhibit A - Ordinance Page 10 ORDINANCE NO. 6317 H2,3,4 High H4 Hazard 94.40 89.68 84.92 80.59 72.52 68.22 76.82 58.86 54.03 H5 HPM / Semiconductor H5 fab 169.14 162.95 157.42 149.72 135.78 130.75 143.54 119.31 113.65 11 Institutional, 11 supervised 168.08 162.18 157.65 150.82 138.52 134.86 146.99 124.28 119.86 12 Institutional, 12 hospitals 287.21 281.02 275.49 267.79 252.87 0.00 261.61 236.40 0.00 12 Institutional, 12.1 nursin homes 198.55 192.37 186.83 179.13 165.20 0.00 172.95 148.74 0.00 13 Institutional, 13 restrained 192.65 186.47 180.93 173.23 160.79 154.76 167.05 144.32 136.66 14 Institutional, 14 day care facilities 168.08 162.18 157.65 150.82 138.52 134.86 146.99 124.28 119.86 M M Mercantile 123.91 119.17 113.69 108.40 1 98.85 96.06 102.82 85.70 81.90 R1 Residential, R1 I hotels 169.51 1 163.62 159.09 152.26 140.12 136.46 148.59 125.88 1 121.46 R2 Residential, R2 multiple family 142.14 136.24 131.71 124.88 113.41 109.75 121.89 99.18 94.76 R3 Residential, one -and two - R3 family 133.78 130.13 126.82 123.67 118.74 115.78 119.75 110.94 103.92 R4 Residential, care /assisted R4 living 168.08 162.18 157.65 150.82 138.52 134.86 146.99 124.28 119.86 S1 Storage, S1 moderate hazard 93.40 88.68 82.92 79.59 70.52 67.22 75.82 56.86 53.03 S2 Storage, low S2 hazard 92.40 87.68 82.92 78.59 70.52 66.22 1 74.82 56.86 52.03 U Utility, U miscellaneous 71.08 67.13 62.83 59.33 53.24 49.79 56.48 41.64 39.44 Exhibit A - Ordinance Page 10 ORDINANCE NO. 6317