Loading...
HomeMy WebLinkAboutBuilding Miscellaneous 2014-3-4 • Par C DV4 °° g 3t Page l of l CE® 4I l to TfSI/NgNSPfC i Geotecknitol lon Services Geotechncal&CarsUuclionSerriw5 Daily Field Report Client: Ms. Laura Farthing Project: Hayden Bridge Water Date: 03-04-14 EWEB Intake Improvements Project No.: 2127278 • PO Box 10148 Springfield, Oregon • Report No.: E-36267 Eugene, Oregon 97440 Inspector: A. Fenstermacher ID No.: 5258882-49 ICC Inspection of: Epoxy Dowels Weather: Partly Sunny Continuous Inspection: ❑ Contractor: John Hyland Construction BP No.: -- Periodic Inspection: 2 Performed continuous inspection during the installation of eight (8) embed plates with four (4) 3/4" x 4" galvanized all thread anchors welded to each plate into roof for top collector connection. Prior to installation, the predrilled holes were cleaned with a brush and compressed air. Verified minimum embedment depth of 4". Anchors were secured with Hilt Hit RE 500SD (ICC—ES ESR 2322/expiration date 10/2014). To the best of our knowledge, the work inspected was in accordance with plans dated 04/2012 and applicable workmanship provision's of the I.B.C., except if noted above. Reviewed By: Michael L. Me er Technical Manager c: John Hyland Construction—Dave Shaw(email) OBEC—Pete Slocum (email) City of Springfield MLM:vs This report and/or enclosed test data is the confidential property of the client to whom it is addressed and pertains to the specific process and/or material evaluated. As such,information contained herein shall not be reproduced in part or full and/or any part thereof be disclosed without FEI Testing 8 Inspection,Inc.'s written authorization. 750 MN Cowell Avenue-Corvallis,Oregon 97330•phone(541)757-4698 fax(541)757-2991 • 29540 B A rport Road Eugene,Oregon 97402.phone(541)684-3849.fax(541)684-3851 • 62979 NE Plateau Drive,Suite 3 Bend,Oregon 97701 'phone(541)382-4844•fax(541)382-4846 •