Geotecknitol lon Services Geotechncal&CarsUuclionSerriw5
Daily Field Report
Client: Ms. Laura Farthing Project: Hayden Bridge Water Date: 03-04-14
EWEB Intake Improvements Project No.: 2127278 •
PO Box 10148 Springfield, Oregon • Report No.: E-36267
Eugene, Oregon 97440 Inspector: A. Fenstermacher
ID No.: 5258882-49
ICC
Inspection of: Epoxy Dowels Weather: Partly Sunny Continuous Inspection: ❑
Contractor: John Hyland Construction BP No.: -- Periodic Inspection: 2
Performed continuous inspection during the installation of eight (8) embed plates with
four (4) 3/4" x 4" galvanized all thread anchors welded to each plate into roof for top
collector connection. Prior to installation, the predrilled holes were cleaned with a
brush and compressed air. Verified minimum embedment depth of 4". Anchors were
secured with Hilt Hit RE 500SD (ICC—ES ESR 2322/expiration date 10/2014).
To the best of our knowledge, the work inspected was in accordance with plans dated
04/2012 and applicable workmanship provision's of the I.B.C., except if noted above.
Reviewed By:
Michael L. Me er
Technical Manager
c:
John Hyland Construction—Dave Shaw(email)
OBEC—Pete Slocum (email)
City of Springfield
MLM:vs
This report and/or enclosed test data is the confidential property of the client to whom it is addressed and pertains to the specific
process and/or material evaluated. As such,information contained herein shall not be reproduced in part or full and/or any part
thereof be disclosed without FEI Testing 8 Inspection,Inc.'s written authorization.
750 MN Cowell Avenue-Corvallis,Oregon 97330•phone(541)757-4698 fax(541)757-2991 •
29540 B A rport Road Eugene,Oregon 97402.phone(541)684-3849.fax(541)684-3851
•
62979 NE Plateau Drive,Suite 3 Bend,Oregon 97701 'phone(541)382-4844•fax(541)382-4846
•