HomeMy WebLinkAboutBuilding Miscellaneous 2014-3-27 •
•
FE, Page l of 1
°I£Shnieol N5G£CAON,Ynr. Geotechnic318,Constmdion Services Daily Field Report Construction
•
Client: Mr. Jeff Givens Project: IP—UPS Electric/Battery Room Date: 03-27-14
International Paper, Inc. 801 42n°Street Project No.: 2147043
801 42nd Street Springfield, Oregon Report No.: E-36482
Springfield, Oregon 97478 Inspector: D. Delatte
ID No.: 1080867-88
ICC
Inspection of: Reinforced Concrete Weather: Overcast/Rain Continuous Inspection: ❑
Contractor: 0& S Contractors • BP No.: 811-SPR2013-02528 Periodic Inspection:
Performed inspection on the reinforcing steel for perimeter and two (2) interior CMU
wail footings. Reinforcing steel was checked for grade, size, lap, placement, quantities
and clearance.
Observed the placement of 31.0 yards of Knife River 4000 psi concrete (mix
40NE7100). Concrete was placed by pump and was mechanically consolidated. Cast
one (1) set of four (4) 4" x 8" concrete test cylinders from load 1. Slump — 4 1/4"; air
temperature—49F; concrete temperature—70F.
To the best of our knowledge, the work inspected was in accordance with plans dated
11-13-13 and applicable workmanship provisions of the I.B.C., except if noted above.
Reviewed By:
Michael L. Meyer
Technical Manager
c:
0 & S Contractors—Arlo Ward (email) •
Jacobs Engineering—Curt LaCount(email)
City of Springfield (email)
MLM:sc
•
•
This report and/or enclosed test data is the confidential property of the client to whom it is addressed and pertains to the specific
process and/or material evaluated. As such,information contained herein shall not be reproduced in part or full and/or any part
thereof be disclosed without FEI Testing&Inspection,Inc.'s written authorization.
7W NW Cornell Venue•Corvallis,Oregon 97330'phone(541)7574698'fax(541)757-2991
29540 B Airport Road Eugene,Oregon 97402'phone(541)684-3849•fax(541)684-3851
62979 NE Plateau Drive,Suite 3'Bend,Oregon 97701 • phone(541)3824844 fax(541)3824846
•