Loading...
HomeMy WebLinkAboutPermit Building 1986-7-21 (2) ir . VERA STARK 4033 CAMELLIA STREET SPRINGFIELD, OREGON 97478 STRUCTURAL 1. Raise dwelling to gain additional underfloor clearance and in order to remove det~riorated material. Remove mud sill, header (rim). joist, and. joist ends where deteriorated and replace. Rep 1 ace joi st subfloor and underl ayment in fl oor area at 1 i vi n9 room entry door. Remove earth from crawl space to provide at least 8 inches of clearance from bottom of floor joist to grade throughout dwelling. Install new footing and CMU foundation wall along entire west side of dwelling. Install a new course of CMU upon existing foudation. Install new foundation at west side of dwelling in compliance with Table 29A UBC. Install new pressure-treated plate and anchor bolts or approved straps in compliance with UBC section 2907(e). Ventilate crawl space in compliance with UBC section 2516(c). Install an 18 x 24 inch access hole with screened cover. Install new pier and post supports as needed in crawl space. Install new rim joist and sections of joist where deteriorated. Install new similar cedar shingle siding at areas affected by foundation/dry rot repair work. Install 6 mil. black, plastic vapor barrier lapped 12 inches at all joints. Have underfloor area fumigated by a licensed pest control specialist. Haul away debris and dirt excavated from crawl space. 2. Remove existing overspanned, collapsed roof framing, roof covering, gutter, and downspout. This item includes front entry porch roof. Reframe new gable roof over entire dwelling including front entry porch. Submit elevation and plan views of proposed roof reconstruction with bid. Show dimensions and framing members or trusses if used. Install 18 inch mlnlmum. overha~g of open construction. Install 1/2 inch COX plywood sheathing and 3-tab, 20 year-rated fiberglass shingles. Install new flashing at all roof penetrations. Install metal drip edge at roof edges or lx2 material to cover exposed plywood edges. Install continuous, seamless aluminum gutter and downspout. Install splash blocks. Install new 4x8 support beam and 4x4 posts with positive connections at top and bottom to support roof load at entry patio. Install 1/2 inch T-1-11 no-groove, textured plywood soffet at patio overhang. Install same material at new gable ends. Ventilate enclosed attic areas in compliance with UBC section 3205(c). Install R-30 attic insulation. Haul away all debris created by roof reconstruction. EXTERIOR 3. When exterior reparirs are complete, clean, scrape, sand, and prepare exterior surfaces to receive paint. Apply two coats of good quality exterior latex paint in compliance with manufacturer1s installation instructions. One body and one trim ~ Vera Stark Page Two color may be selected and applied. Protect windows, shrubbery, roof covering, etc. from paint overspray and leave such areas free of paint at completion of paint application. 4. Extend bathroom and kitchen exhaust fan vents to building exter.i or. 5. Install missing shingle siding at retrofitted windows on south and southeast sides of dwelling. 6. Rehang living room entry door to fit properly after house is raised and leveled. Rehang laundry room exterior door to open to exterior. Install concrete step and 3 x3 foot concrete slab landing. Install jamb-up weatherstripping and thresholds at 3 exterior doors. _/ ELECTRICAL 7. Install ground fault circuit Securely install electrical coverp1ate. interrupter at bathroom circuit. outlet in hallway and install 8. Install moderate cost (allowance $20) light fixture at master bedroom ceiling. 9. Raise electrical mast and service drop to accommodate new roof_ structure. Cut back tree limbs ~here touching service lead-in. PLUMBING 10. Disconnect, extend, and reconnect drain lines and water supply lines to allow raising of dwelling. 11. Pipe water heater pressure-re1 ease val ve, to buil di ng exteri or. 12. Divert kitchen sink vent to angle around kitchen window. Extend all plumbing vents through new roof eave and install flashing. Securely fasten vents to west wall of dwelling. FIRE SAFETY 13. Install new 8 inch Imeta1bestos" chimney, cap, and chimney connector to existing stove. Install metal heat shield provided by owner to allow 1 inch ventilation space on brick back up. INTERIOR 14. Remove -water-damaged gypsum board from living room ceiling; haul away debris. Install new gypsum board ceiling; finish with a light texture. Install wood ceiling corner trim. Apply two . Vera Stark Page Three coats of good quality interior latex paint to ceiling and ceiling corner trim. 15. Remove water-damaged, moldy living room carpet and pad; haul old carpet and pad away. Install new moderate quality carpet and pad in living room area. Non-installed cost of carpet is not to exceed $17 per square yard. Adjust living room entry door to new carpet height. Note: Contractors are responsible for obtaining required permits and inspections. These specifications are for bid purposes only. Contractors may suggest alternate materials, methods, or design. Please bid each numbered item and any alternative you may have. TOTAL BID PRICE: NAME: ADDRESS: TELEPHONE #: CONTRACTORS' LICENSE #: #555