HomeMy WebLinkAboutPermit Fence 1988-6-13
", ~.. ',:-.. - "
... " ~, .: ,', '.'
. 'n.... "'...
""'_" ..,', "'.._ .', ....~. ".... ,. , ,'. _.. ..T...'.....A. ,_ "
'.
.. RESlr-NTIAL .-.
APPLICA7'lON /PERMIT
225 North 5th Street
Springfie Zd~ Oregon 974??
BuiZding_: Division
726-3753 '
;/ _ /J ,1/ 1
/Un f1Ilh /JI/(1 /tut/lLvv- _ /
/(oot! "/aMk (-,~{4one: 'il/&- 11YL(
, I....--'
oTob Location:
/&01-/
/703;;L5
ASGessors Map #
Subdivision:
Ol.mer:
Add:r>ess:
Ci ty :
I
I
I
I
NmJ
Addition
Remodel
,
t~~>
"3 ;;( , Tax Lot # / C; q ff1)
Zip:
Describe lior/(:
UobiZe Home
l~ ~l??-ft
Value
'j;(!)CJ
Date of Application
Contractors
n J, Tv> /J '" )
~U / LX./ L../
General
i Plumbing
, E'Lectrical
Mechanical.
Constl'Uction Lender
Add.~ess
/ 1 -/o~~
L '
Rece1.pt #
DIG
qoJ;. vvVI
~iv(
Signed:
Date:
at
(1'-/'J.-~q
Lisc.#
Expires
Phone
It is the responsibi'Lity of the permit ho'Lder to see that a'L'L inspections are made at the proper time~ that each ~ess is readaOZe
from the street, and that the permit' aard is 'Loaated at the front of the property.
*Bui!ding Division approved p'Lan shal'L remain on the Building Site at a'L'L times.
PI?OCEDURE FOR INSPECTION RE'QUEST:CALL 726-3769 (reaorderJ state your City designated job nw,;ber, job address, type of inspection
requested and when you wi'Ll be ready for inspection, Contraators or Owners'ncme and phone number. Requests reaeived before 7:00 ~
z..'ill be made the same day, requests made after 7:00 am will be made the next :Jorking day. CA7:(j510
YOUI' City' Desigr~ted Job Number Is: ~ () (
Reauir>ed Insveation,q
SITE INSPECTION: To be made after
excavation, but prior to set up of
forms.
UNDERSLAB PLUMBING. ELECTRICAL &
, MECHANICAL: To be made before any
work is covered.
o
o
o
FOOTING & FOUNDATION: To be made
after trenches are excavated and
forms are erected, but prior to
pouring concrete.
UND'E:RGROUND PLUMBING. SEWER. WATER,
DRAINAGE: To be made prior to fi!-
Zir.g trenches.
0: UNDERPLOOR PLUMBING & MECHANICAL:
, To be made prior to installation of
floor insulation or decking.
o
o
POST AND BEAM: To be made prior to
installation of floor insulation or
decking.
ROUGH PLUMBING. ELECTRICAL & MECH-
,ANICAL: No work is to be covered
,until these inspections have been
made and approved.
FIREPLACE: Prior to plaair.g facing
materials and before framing inspec-
tion.
D FRAMING: Must be requested after
approval of rough plumbing, electri-
cal & mechanical. An roofing
bracing & chimneys, eta. ~~st be
:' completed. No work is to be con-
,_,,~.cealed until this inspection has
~been made and approved.
D
D
o
INSULATION/VAPOR BARRIER INSPECTION:
To be made after all insulation a~4
required vapor barriers are in place
but before any lath, gypsum board or,
wall covering is applied, and before
any insulation is concealed.
DEMOLITION OR !,;OVED BUILDINGS
=:J Sani tary se'uJer capped at p~opert'd line
~ Septic tank pumped and filled with gra~el
--, Pinal - lihen above items are completed
~ and when demolition is complete or struc-
ture moved and premises cleaned up.
. Mobi le Hemes
~ Blocking and Set-up
~ Plumbing connections s~er and water
~ Eleatrical Connection - Blocking, set-up
~ and plumbing connections ~~st be approved
before requesting electrical inspection
~ Accessory Building
~ Final - After porches, skirting, decks,
~ etc. are completed.
o
All project aonditions, such as the installation of street trees, co~letion of the
required l,andscaping, etc., must be satisfied before the BUILDING FINAL can be requested.
D FINAL PLUMBING
o FINAL MECHANICAL
o FINAL ELECTRICAL
o
o
FINAL BUILDING: The Pinal Building Inspection must be requested alter the Final Plumbinq
Electrical, and Mechanical Inspections have been made and approved.
o
DRYWALL INSPECTION: To be made
after all drywall is in place,
but prior to any taping.
'ALL MANHOLES AND CLEANOUTS MUST BE ACCESSIBLE, ADJUST!fENT TO BE M.1DE AT NO COST TO CITY I Page 1 of 2
D
MASONRY: Steel location, bond
beams, grouting or verticals in
accordance with U.B.C. Section
2415.
o
WOODSTOVE:
completed.
After installation is
o
CURB & APPROACH APRON: After forms
are erected but prior to pouring
ao=rete.
D SIDEWALK & DRIVEWAY: For aU con-
crete paving within street right-
pf-way, to be made after all exca-
vating complete & form work & sub-
, base material in place.
/
IVI FENCE: h'hen complete -- Provide
~ gates or movable sections through
, P.U.E.
o
~\
l:'age ;;
JOB NO,,- fl,]'1{)!5/0S0LAR ACCESS REQ.-
L -CO G~
Zone:
Occ:upanc'! Gro,
LOT TYPE
Type/Cor.st:
Bedrooms:
Lot Sq. Ftg.
% of lot Coverag~
/I of Stories
Total Height
Topography
Interior
Corner
I Lot Faces -
I Setbacks
I P. L. House Carage
North
East
South
IWest
Access. I
I
I
I I
I I
I Enerq7.f Sources
I !/eat
Water Heater
Range
I Firep lace
Woodstove
T;.{De
Panhandle
Cul-de-sac
I
lITEM
I Main
I Ga:1'aae
Fees
SQ.FTG
x
Value
Building Value & Permi't
Carport
This permit is granted on the express condition that the said construction
shall, in all respects, conform to the Ordinance adopted by the City of
Springfield, including the Zoning Ordinance, regulating the construction
and use of buildings, and may be suspended or revoked at any, time upon vio- '
ration of any prov~sions of said Ordinances. '
Accessor7.f
I
,
Is.D.c.
1.5 x
TOTAL VALUE
IvatueJ
*
Building Permit
Total Charges
*
Plan Check Fee:
Date Paid:
Receipt II:
I Signed:
State SUI'charge
ITEM
FixtuI'es
I Residential (i bath)
\ Sanitary SeLler
I Water
I
NO. FEE
CHARGE
Plumbing Permit
No person shall construct, install, alter or change any new or existing
plumbing or drainage syste~ in whole or in part, unless such person is the
legal possessor of a valid pi~ber's license, except that a person may do
plumbing work to property whidh is owned, leased or operated by the appli-
cant. '
Plumbing Permit
State SUI'cr.arge
Total Charaes
ITEM
NO.
FEE
*
CHARGE I
I
I
r
I
I
I
I *
CHAReE
Electrical Permit
lITEM
I Res. Sa. fta.
I Naw/Extend Circ:uits
Temporary Service
NO. I FEE
Where State Law requires tr4t the electrical work be done by an Electrical
Contractor, the electrical portion of this permit shall not be valid until
the Zabel has been signed by the Electrical Contractor.
Electrical Permit
State SUI'charge
Total Charges
Furnace ETU'S
E:::tzaust Hood
Mechanical Permit
Vent Fan
Woodstove
Pemt Issuance
Mechanical Perrrrit
State SUI'charae
Total Charaes
I -- ENCROACHMENT --
Ise~~rit7.f Deposit
I Storage
I Maintenan:::e
I Pemt
I Total Charges
, *
Plan EXCJn'l-ner
Uate
Curbc:ut
I HAVE CAREFULLY EXAMINED the completed application for permit, and do
hereby certify that all information hereon is true and correct, and I
further certify that any ar.d all work performed shall be done in accor-
dance with the Ordinances of the City of Springfield, and the L~~s, of the
* State of Oregon pertaining to the work described herein, and that NO OCCU-
PANCY will be made of any structure without permission of the Building Di-
vision. I further certify that only contractors and e~loyees who are in
compliance with ORS 701.055 will be used on this project
Sidewalk
I Pen.::e
I Electrical Label
I
I Mobile Home
I
1
c::s _ 00
TOTAL AMOUNT DUE: *
, 00
--.J .
.
~~ ~U1~~-i~-~
*