HomeMy WebLinkAboutPermit Plumbing 1985-12-31
.. RESI.TIAl..
APPLICATION/PERMIT
225 North 5th street
. Springfield" Oregon- 97477.
Building Division
726~3753
Job Loeation:
jq~(o '(~~d~'~
\\D~~~3~
#'\4~
Assessors Map #
Subdivision:
,T= Lot
n~~
C-~d~
'.- '- ,':.
, , '
;aw~,'.'.~~""~'
", flv--.~' "
, ..." :-'..&' . '
12 ;".~/-fr V Value' Il/. <II
Owner:
Address: \ q d-: C9
City: ~ r fttJ
_~J/~,'
I ,', 0 ,
Nm)"
Addition
I-1"Remode l
, -R.a..
, ~ ),
I !1obi le Home
Date of Applieation"
Contractors
Phone: 7'-17-7 tf g (b
Zip: '1 7'1 "? 7
'Describe fior7<:
Add..~ess
Genera 7..
PZwnbing
E7..ectrieal
MechanicaL
'? ,Lt;. J?tu,!f'fJ.Ly PI}. q:lJ"")ft-/ BLJ.
ftJA~ ~~~I" p~~__ E~
Constzouetion Lender
-# ;)..,67QJ..bt/
Reee-:pt # b& If()GL(
Signed:
Date:
.~
1~-')'':z, <(
Lise. #
Expires
1/:2'1 jJS
1'/ ,
It; / /0 /~S
Phone
41 /2'10 ;). Yo I
It is, the responsibility of the permit holder to see that alt inspeetions are made at the proper time, that each cddress is rea:iabZe :
from the street, and. that the permit eard is Loeated at the front of the property.
"BuUding Dividon approved plan sluill remain on the Building Site at aU times.
PROCEDURE FOR INSPECTION REQUEST:CALL726-3769 (reeorder) state your City designated job nw,;ber, job address, type of inspeeticn
xoequested and when you will be ready for inspection, Contraetors 01" Owners ncme and phone nwnbcr. Requests reeeived before 7: 00 a;;;
:.'i l l be made the scone day, requests made afte:t' 7: 00 am wi ZZ be made the next :.lor king day.
Reauired Insveeticns
O SITE INSPECTION: To be made after
excavation, but prior to set up of
, forms.
D
UNDERSLAB PLUMBING. ELECTRICAL &
: MECHANICAL: To be made before any
work is covered.
o
FOOTING & FOUNDATION: To be made
after trenehes are excavated and
, forms a!'e erected, but prior to
pouring eonerete.
01 "UNDERGROUND PLUMBING, SEWER, W.1TER,
DRAINAGE: To be made prior to fil~
,'ling trenehes.
o
D
UNDERFLOOR PLUMBING & MECHANICAL:
To be made prior to installation of
j700r insulation or decking.
POST AND BEAM: To be made prior to
installation of f7..oor insulation or
decking. .
D ROUGH PLUMBING. ELECTRICAL &MECH-'
ANICAL: No work is to be covered
:until these inspeetions have been
made and approved. '
O FIREPLACE: Prior to p7..aeir..g faeing
materials and before framing inspee-
tion.
O FRAMING: Must, be requested after' ,
approval of rough plumbing, e7..eetr~-
cal & meehanical. AU ,rOOfing
'bracing & ehimneys, etc. nr~stbe
C completed. No work is to be eon-
,_.,,~,-cealed until this inspei::tion has
~bee? made and approved.
.-~..,;..-. -
Your city Desigr~ted Job NUmber Is:
o
INSULATION/VAPOR BARRIER INSPECTION:
To be made after all insula.tion a:!".d
required vapor barriers a!'e in place
but before any lath,' gypsum bOa!'d 01"
UXlll eovering is applied, and before
'any insulation is coneea7..ed.
~4 0970
DEMOLITION OR {.JOVED BUILDIiIGS
~ Sanitary se'.Jer capped a.t property line I
--.J - (
i
=:J Septic tank pwrrped and fiZZad UJith gravel I
~ Final - f>'hen above items are eompleted
~ and when demolition is eomplete 01" struc-
ture moved and premises cleaned up.
I Mobile Hemes
:=J Bloeking and Set-up
"~ Plumbing eonnections s<:tJer and water
~ Eleetrieal Conneetion - Bloeking, set-up
-.-J and plumbing eonnections nr..st be approved
, before requesting eleetrical inspeetion
=:J Aecessory Building
-:",...
':J
DRYWALL INSPECTION: To be made
after aU drywaU is in place,
but prior to any taping.
0, ~SONRY: Steel Location, bond
beams, grouting 01' vertieals in
accordanee,UJith U.B.C. Section
,2415.
o
WOODSTOVE: After installation is
eompleted.
J Final - /lfter porehes, skirting, decks,
---J etc. are eompletcd.
D
All project eonditions, such as the installation of street trees, cc"?letion of tne
r:quired landseaping, ete., must be satisfied before the BUILDING FINAL can be requested.
~INAL BUILDING: The Final Building Inspeetion must be requested after the Pinal Plumbing
V' ~'leetrical, and Meehanieal Inspeetions have been made and approved.
D FINAL PLUMBING
.0 FINAL MECHANICAL
I~ ELECTRICAL,'
!c=J
o
CURB & APPROACH APRON: After forms
are erected but prior to,pouring
concrete. '
"ALL MANHOLES AND CLEANOUTS MUST BE ACCESSIBLE, ADJUST!1ENT' TO BE !'L~DE I!T NO COST TO CITY I Pa.ge 1 of 2
D
SIDEWALK & DRIVEWAY: For aU, eon-
erete paving within street right-
of-ux::.y, to be made after aU exea-
vating complete & form work & sub-
base material in place.
o
PENCE: h'hen complete Provide
gates or movable seetions throu~h
P.U.E.
o
i,.1"
IJOB NO.<6lto970
I Zone:
Lot. Sq. Ftg.
Z of lot. Coverag~
# of Stories
Total Height
Topography
I
lITEM
I Main
I Garaae '
I Carvort
I Accessorl/
I SQ. FTC
S.D.C.
TOTAL VALUE
(va~ue)
1.5 x
Building Permit
State Su:t'charge
Total Charges
ITEM
Fixtures
Residential (1 bath)
Sanitary Sewer
Water
Plwnbing Permit
State Su:t'cr.arge
Total Charoes
ITEM
Res. Sa. fto.
I New/Extend Circuits
I Temporary Service
121
I I
I I
Electrical Permit
State Su:t'charqe
Total Charges
ITEM
I Furnace ETU' S
,\ Exhaust Hood
Vent Fan
I NO.
,
Woodstove
Permit. Issuance
Mechanical Permit.
State Su:t'charae
Total Charaes
-- ENCROACHMENT --
Se~~rity Deposit
Storage
Maintenance
Permit
Tot.al Charqes
Curbcut
I Sidewa lk
I Fence
, Electrica l Labe l
I Mobi le Home
I
I
TOTAL AMOUNT DUE: *
NO.
NO. FEE
SOLAR E S S REQ.-
Occupancy Croup:
LOTTYFE
Interior
Corner
Panhandle
Cul-de-sac
x Value
FEE
I *
15.00
,&,o
15,&0 , *
CHARGE I
I
I
I
CHARGE '
;(, ( (!) 0
FEE
15,(90
[00 I
I SI (00 l *
CHARGE I
I
3/
zo
rage c
L-CO G~
Type/Cor.st:
Bedrooms:
I Enerq1.f Sources
I Heat
I Water Heater
I I Range
I I Firep lace
I I Woodstove
I.J
T;;oe
Lot Faces -
P.L.
INorth
lEast
ISouth
,lWest
Fees
Setbacks
House ' Carage' I Access.
I
Building Value &. Permit
This pe1'TTr'~t is granted on the express condit~on that the said_ construction
shall, in all respects, conform to the Ordinance adopted by the City of
Springfield, including the Zoning Ordinance, regulating the construction
and use of buildings, and may be suspended or revoked at cny time upon vio-
lation of any provisions of said Ordinances.
Plan Check Fee:
Date Paid:
Recdpt #:
I Signed:
Plumbing Permit
No person shall construct, install, alt.er or change any r~W or existing
plwnbing or drainage syste~ in whole or in part, unless such person is the
legal possessor of a valid plwnber's license, except that a person may do
plwnbing work to property which is owned, leased or "operated by the appli-
cant .-
*
Electrica I Perm it
Where State Law requires tr4t the electrical work be done by an Electrical
Contractor, the electrical portion of this permit shall not be valid until
the label has been signed by the Electrical Contractor.
Mechanical Permit
*
Plan Excornner
uat;e
I
I
r *
I
I
I HAVE CAREFULLY EXAMINED the completed application for permit, and do
hereby certify that all information hereon is true and correct, and I
further certify that any dr.d all work performed shall be done in accor-
dance with the Ordinances of the City of Springfield, and th~ L~~s of the
State of Oregon pertaining to the work described herein, and that NO OCCU-
PANCY will be'made of any structu:t'e without permission of the Building Di-
vision. I further certify that only contractors and e~loyees who are in
compliance with ORS 701.055 will be used on this project
*
!)
/~J /J>Y
Signed
Date
I