Loading...
HomeMy WebLinkAboutBuilding Miscellaneous 2014-2-27 • Bend Office (541)330-9155 Geotechnical Office (503)601-8250 Salem Office (541)345-0289 Carlson Testing, Inc. Salem Office 503 589-1252 Tigard Office (503)684-3460 Daily Report of Proprietary Anchors Client: PROPERTY PLUS INVESTMENTS - JOHN HARTSOCK Project: RESIDENCE SPRINGFIELD CTI Job#: E1401553. Address: 1065 N ST SPRINGFIELD OR Jurisdiction: SPRINGFIELD CTI representative D. SMITH OBOA 442 was on site this date Feb. 27, 2014 to perform Special Inspection for: Permit S14-00149 DFS#(sr PO Number: SCOPE OF INSPECTION Location of proprietary anchors inspected [to include grid lines, elevations(floors)and drawing details]: 1. Checked in with superintendent or client representative. EPDXY #4 REBAR 2' ON-CENTER EMBED 4" AT NEW Name: JOE SLAB FOOTING. Company: PROPERTY PLUS INVESTMENT 2. Inspection was "IBC" n Continuous Periodic PROPRIETARY ANCHORS Yes No N/A 1. Reviewed previous inspection reports? X 2. Reviewed evaluation report? X Verified following items meet manufacturer's REPORT SUMMARY published installation instructions. 3. Verified minimum embedment depth of the 1. Work inspected was: © Completed U In progress anchors. X 4.Verified installation of the anchors. 2. Completed work inspected was in compliance with X Approved plans and specifications fl Shop drawings 5.Verified anchor diameter. X 6. Verified steel grade. X E AEI © Design change El Submittal 111 N/A 7. Verified hole diameter. X Document#(s) ENG. SUBMITTAL Dated: 2/25/14 8. Verified type of drill bit used. X 9.Verified hole cleaning method. X 3. Noncompliance item(s) were l r�einoted this d�a�tie,details on 10. Verified adhesive application. x following page(s). I I Yes I I No ® N/A 11. Verified edge distance. X 4. Noncompliance item(s) were reinspected this date,details 12. Verified spacing. x on following page(s). ❑ Yes ❑ No ® N/A 13. Verified installation torque. X ❑ Conform ❑ Remain in progress Evaluation report number&date: Report(s) findings were discussed and lefi with ICC ESR 2508 DATED: 6/1/13 JOE Of PROPERTY PLUS INVESTMENTS Name of product being installed SIMPSON SET XP • Batch Number 149P284P Expiration Date 11/2015 Based on the Code, approval is required from the Building Official before the SPECIAL INSPECTED items noted above can be covered.Carlson Testing has no authority to direct work of contractors or subcontractors. See additional report page(s). Distribute attachments. Page of Daily Report of Proprietary Anchors For: 02/27/2014 CTI Job #: E1401553. Project: RESIDENCE SPRINGFIELD Notes: In some cases more than one box may be checked for a given item on the front page. Our reports pertain to the material tested/inspected only. Information contained herein is not to be reproduced, except in ft without prior authorization from this office. Under all circumstances, the information contained in this report is provided subject to all terms and conditions of CTI's General Conditions in effect at the time this report is prepared. No party other than those to whom CTI has distributed this report shall be entitled to use or rely upon the information contained in this document. If there are any further questions regarding this matter, please do not hesitate to contact this office. Respectfully submitted, CARLSON TESTING, INC. David Smith Reviewed By: Project Manager Project Manager Review Date: 02/28/2014 DS/SL PROPERTY PLUS INVESTMENTS - JOHN HARTSOCK JHARTSOCK@GMAIL.COM TO: CITY OF SPRINGFIELD BUILDING DEPARTMENT PIONEER ENGINEERIN M LUKE DESIGNS LUKEDESIGNS7@GMAIL.COM PROPERTY PLUS CONSTRUCTION - JOHN HARTSOCK JHARTSOCK@GMAIL.COM 89970 HWY 99N,EUGENE OR