Loading...
HomeMy WebLinkAboutItem 11 Master Fee and Charges Schedule - Spring 2014 Update AGENDA ITEM SUMMARY Meeting Date: 4/7/2014 Meeting Type: Regular Meeting Staff Contact/Dept.: Bob Duey Staff Phone No: 726.3740 Estimated Time: 10 minutes S P R I N G F I E L D C I T Y C O U N C I L Council Goals: Provide Financially Responsible and Innovative Government Services ITEM TITLE: MASTER FEES AND CHARGES SCHEDULE –SPRING 2014 UPDATE ACTION REQUESTED: Hold a public hearing and first reading on the following ordinance: AN ORDINANCE OF THE CITY OF SPRINGFIELD AMENDING ARTICLE 1, TABLE 3-A STRUCTUAL PERMIT FEES; TABLE 3-B ELECTRICAL PERMIT FEES; TABLE 3-C PLUMBING PERMIT FEES; TABLE 3-D MECHANICAL PERMIT FEES; TABLE 3-F OTHER INSPECTION AND FEES OF THE “SPRINGFIELD BUILDING SAFETY CODE ADMINISTRATIVE CODE” OF THE SPRINGFIELD DEVELOPMENT & PUBLIC WORKS DEPARTMENT; COMMUNITY SERVICES DIVISION “BUILDING SAFETY CODES”. Hold a public hearing and first reading on the following ordinance: AN ORDINANCE AMENDING THE SPRINGFIELD MUNICIPAL CODE, SECTION 3.356 “SEWER CONNECTOINS – UNASSESSED PROPERTY” TO ADD A NEW SECTION, SECTION 3.356(3)(c) REGARDING PROPERTY DIRECTLY BENEFITED BY THE FRANKLIN/MCVAY SANITARY SEWER EXTENSION AND ADOPTING A SEVERABILITY CLAUSE. ISSUE STATEMENT: Each year, Council and staff review existing fees and charges for appropriateness of rates for meeting cost recovery targets as well as reviewing for areas where new or additional fees should be considered. A work session was held with Council on February 3 to review the proposed changes for this spring. Staff is returning at this time to present to Council the first phase of the proposed fee changes as discussed at that work session. The inclusion of all fees into a single manual for improved public access does necessitate three separate actions for final approval of recommended fee changes. A single ordinance, public hearing and second reading is necessary for changes being made to fees specially stated within the Building Code. A second single ordinance, public hearing and second reading is necessary for changes being made to fees specially stated within the Municipal Code. Both of these ordinances are being presented on April 7 with a second reading scheduled for April 21. It will be asked that these fees be enacted with an emergency clause that has them effective on April 22 to allow all new fees to go into effect at the same time. A separate resolution presented for a public hearing only on April 21 has been scheduled for all other recommended fees changes presented at the February 3rd work session but are not included in the two previously mentioned ordinances. The effective date for these fees will be April 22nd also. ATTACHMENTS: 1. Council Briefing Memorandum 2. Building Code Ordinance Amendment 3. Municipal Code Ordinance Amendment DISCUSSION/ FINANCIAL IMPACT See Council Briefing Memorandum M E M O R A N D U M City of Springfield Date: 3/31/2014 To: Gino Grimaldi COUNCIL From: Bob Duey, Finance Director BRIEFING Subject: Master Fees and Charges Update MEMORANDUM ISSUE: Each year, Council and staff review existing fees and charges for appropriateness of rates for meeting cost recovery targets as well as reviewing for areas where new or additional fees should be considered. A work session was held with Council on February 3 to review the proposed changes for this spring. Staff is returning at this time to present to Council the first phase of the proposed fee changes as discussed at that work session. The inclusion of all fees into a single manual for improved public access does necessitate three separate actions for final approval of recommended fee changes. A single ordinance, public hearing and second reading is necessary for changes being made to fees specially stated within the Building Code. A second single ordinance, public hearing and second reading is necessary for changes being made to fees specially stated within the Municipal Code. Both of these ordinances are being presented on April 7 with a second reading scheduled for April 21. A separate resolution presented for a public hearing only on April 21 has been scheduled for all other recommended fees changes presented at the February 3rd work session but are not included in the two previously mentioned ordinances. The effective date for all fees will be May 21st. COUNCIL GOALS/ MANDATE: Provide Financially Responsible and Innovative Government Services Adopted City policies recognize that the funding sources for different services vary greatly from full cost recovery to full tax subsidy to outside grants to a combination of many different sources. Review of rates, sources and cost recovery models on a regular basis is important to ensure that citizens are able to receive maximum service for the resources available. MEMORANDUM 4/2/2014 Page 2 Attachment 1, Page 2 of 11 BACKGROUND: The City’s schedule of fees and charges are established by Council action. The work in the spring of 2013 by the Council and staff consolidated past documents describing the City’s various fees and the method for making changes into a single document titled Master Fees and Charges schedule. This document provides an easy reference for citizens, Councilors and staff to identify the current fees authorized to be levied and collected by the City. The changes to the document did not change how each of the fees and charges can be modified through action by the Council or staff. The most common of actions by the Council is by simple resolution. The authorization to levy the fee may be contained in the municipal, building, development or fire code, but the actual amount of the fee itself is established by resolution. These most commonly are brought to the full Council with a public hearing and are adopted at that time. Other fees may be authorized by the municipal, building, development or fire code and the specific amount the fee is also contained within that same code. In those cases, the respective code itself must be amended and most commonly requires a public hearing, a first reading and a second reading prior to adoption. Current Action Requested The coordination for updating this spring all of the fees contained in the Master Fees and Charges Schedule will require three separate actions. They are: 1. A single ordinance, public hearing and second reading is necessary for changes being made to fee amounts specifically stated within the Building Code (April 7 and April 21). 2. A second single ordinance, public hearing and second reading is necessary for changes being made to fee amounts specifically stated within the Municipal Code (April 7 and April 21). 3. A public hearing and a single resolution passed by Council is all that is necessary for all other changes to the Master Fees and Charges Schedule (April 21 only). RECOMMENDED FEE CHANGES The two recommendations for discussion on April 7th are described below. The first is the changes to the Building Code as described in Chapter 6 of the Master Fees and Charges Schedule. After the previous work session with the Council, these fee changes were submitted to the State for review and public posting and were shared with representatives of the Lane County Homebuilders Association. The changes are as follows: Section 6: Building and Safety Fees The following fees shall be charged for the Building and Safety activities of the City: Site Plan Review Reduction in fee, Resolution 10-51 To the following fees, please add a $2.50 Continuing Education Fee. Building Permits (ORS 455.447) MEMORANDUM 4/2/2014 Page 3 Attachment 1, Page 3 of 11 Structural, Commercial and Mechanical Permit Fees Table No. 3-A TOTAL VALUE New Fee $1.00 - $2,000 $80.00 $82.00 $2,001 - $25,000 for the first $2,000 in value $80.00 $82.00 plus for each additional $1000 or fraction thereof. $10.33 $10.52 $25,001 - $50,000 for the first $25,000 in value $317.50 $324.00 plus for each additional $1,000 or fraction thereof $7.77 $8.00 $50,001 - $100,000 for the first $50,000 in value $511.75 $523.00 plus for each additional $1,000 or fraction thereof $5.00 $10.00 $100,001 and Up for the first $100,000 in value $761.91 $779.00 plus for each additional $1,000 or portion thereof $4.38 In addition to the Building Permit Fee, the Plan Check Fee shall be 65% of the Building Permit fee. For the purpose of defraying the cost of applying regulations as provided in ORS 455.447 a surcharge of 1% to the total fees collected for essential, hazardous, major and special occupancy structures shall be collected. To the above, please add 12% State Surcharge. To the above fees, please add a $2.50 Continuing Education Fee. Electrical Permits Table No. 3-B Description Fee Residence wiring less than 1000 square feet $147.50 $151.00 Each additional 500 sq.ft. or portion thereof $27.50 $28.00 Manufactured Home or Modular Dwelling (Service or Feeder) $69.00 $71.00 Temporary Power – 200 amps or less $69.00$71.00 Temporary Power – 201 to 400 amps $96.00 $98.00 Temporary Power – 401 to 600 amps $138.50$142.00 Permanent Service or Feeder – 200 amps or less $89.00 $91.00 Permanent Service or Feeder – 201 to 400 amps $104.50 $106.00 Permanent Service or Feeder – 401 to 600 amps $174.00 $178.00 Permanent Service or Feeder – 601 to 999 amps $225.50 $230.00 Permanent Service or Feeder – 1000 amps or volts $516.00 $527.00 Electrical Service Reconnection with no changes to existing service size $65.00 $71.00 One new/alteration/extension of circuit $60.50 $62.00 Each Additional Circuit $6.50 $7.00 Each Irrigation Pump $69.00 $71.00 Each Electrical Sign or Outline Lighting $69.00 $71.00 Each Signal Panel $69.00 $71.00 Limited Energy – Residential $35.00$36.00 Limited Energy – Commercial/Multi-Family $80.00 $82.00 Inspections not covered by this schedule minimum 1 hour $80.00 $82.00 MEMORANDUM 4/2/2014 Page 4 Attachment 1, Page 4 of 11 Re-inspection Fee $80.00 $82.00 Partial Inspection $80.00 $82.00 Inspections Outside Normal Business Hours $94.50 $97.00 Minimum Permit Fee $80.00 $82.00 Investigation Fee $80.00 $82.00 Inspections For Which No Fee is Specifically Indicated $80.00 $82.00 Electrical Quick Permits (sold in 10 only) No longer in Use $-0 Building Without Permit Penalty $ Permit Fee Electrical Plan Review 25% of Permit Fee To the above fees, Please Add 12% State Surcharge. To the above fees, please add a $2.50 Continuing Education Fee. Mechanical Permits (Residential) Mechanical Permit Fees Table No. 3-D Description Fee First Appliance $80.00 $82.00 HVAC Up to 100,000 btu $18.50 $19.00 More than 100,000 $22.00 Unit Heater $18.50 $19.00 Boiler/Compressor Up to 100,000 btu$ $18.50 $19.00 3-15 Horsepower or 100,001 – 500,000 btu $32.00 $33.00 Over 15 to 30 Horsepower or 500,001 – 999,000 btu $47.50$49.00 Over 30 to 50 Horsepower or 1,000,000 – 1,750,000 btu $62.50 $64.00 Over 50 Horsepower or over 1,750,001 btu $104.50 $107.00 Air Handling Unit Up to 10,000 cfm $12.00 10,001 cfm and over $22.00 Evaporative Cooler/Fan $14.50 $15.00 Vents Hood and Exhaust $14.50 $15.00 Vent Fan to One Duct $10.00 Appliance Vent $10.00 Gas Piping Each Piping System 1-4 Outlets $7.50 $8.00 Each Outlet over 4 $4.50 $5.00 Air, Oxygen, Other Medical Specialty Piping Each Piping System 1-4 Outlets $7.50 $8.00 Each Outlet over 4 $4.50 $5.00 LP Gas Tank and Piping $18.50 $19.00 Miscellaneous Domestic Incinerator $22.00 MEMORANDUM 4/2/2014 Page 5 Attachment 1, Page 5 of 11 Commercial Incinerator $82.50 $84.00 Wood/Pellet Stove $42.00 $43.00 Heat Pump $18.50 $19.00 Preliminary Inspection $80.00 $82.00 Each Appliance Not Listed on this Schedule $14.50 $15.00 Inspections Not Covered by this Schedule $80.00 $82.00 Re-inspection Fee $80.00 $82.00 Supplemental Mechanical Fee *Not In Use* $-0- Minimum Permit Fee $80.00 $82.00 Partial Inspection $80.00 $82.00 Inspections Outside Normal Business Hours $94.50 $97.00 Investigation Fee $80.00 $82.00 Building Without Permit Penalty $ Permit Fee Hourly Inspection Fee for Requests Not In Permit Tables $82.00 Mechanical Plan Review Fee 25% of Permit Fee Mechanical Quick Permits (sold in 10 only) No Longer Available $-0- Commercial/Industrial/Public Mechanical System including installation costs Value To the above fees, please add 12% State Surcharge. To the above fees, please add a $2.50 Continuing Education Fee. For the purpose of defraying the cost of applying regulations as provided in ORS 455.447 a surcharge of 1% to the total fees collected for essential, hazardous, major and special occupancy structures shall be collected. Plumbing Permit Fees Table No. 3-C Fees for the construction, alteration or repair of plumbing on one and two family dwellings, shall be calculated as described below. Fees include drain, waste and vent installation, water distribution piping, the first 100 feet of water service. One or two family with one bath $262.00 $268.00 One or two family with two bath $411.00 $420.00 One or two family with three bath $483.00 $494.00 Each Additional Bath $104.50 $107.00 Each Additional Kitchen $104.50 $107.00 Single Plumbing Fixture $21.00 Sanitary Sewer: For the first 100 feet of line $83.50 $85.00 Each additional 100 feet of line or portion $21.00 Water Service: the first 100 feet of line $83.50 $85.00 Each additional 100 feet of line or portion $21.00 Storm and Rain Drain: For the first 100 feet of line $83.50 $85.00 Each additional 100 feet of line or portion $21.00 Sewage Ejector Pump $21.00 MEMORANDUM 4/2/2014 Page 6 Attachment 1, Page 6 of 11 Special Waste Connection $21.00 Manufactured Home hook up on improved lot $80.00 $82.00 Backflow Prevention Device $21.00 Relocated Structure $80.00 $82.00 Sanitary or Storm Sewer Cap $80.00 $82.00 Any trap or waste not connected to a fixture $21.00 Any plumbing installation not listed in this schedule with sanitary waste or portable water supply $21.00 Minimum Plumbing Permit Fee $80.00 $82.00 Partial Inspection fee $80.00 $82.00 Re-inspection Fee $80.00 $82.00 Inspections Not Covered By Schedule $80.00 $82.00 Inspections Outside Normal Business Hours $94.50 $97.00 Investigation Fee $80.00 $82.00 Building Without Permit Penalty $ Permit Fee Accessible Minor Plumbing Labels NO LONGER AVAILABLE $ -0- Not Accessible Minor Plumbing Labels NO LONGER AVAILABLE $ -0- Hourly Inspection Fee for Requests Not In Permit Table $80.00 $82.00 Medical Gas System Inspection Fees – Inspection fees for medical gas systems are a combination of Base Fee $ Value + Plus Each inlet or outlet Plan Review Fee for Med Gas $80.00 $82.00/hr but shall not exceed 30% of the total plumbing permit fee for the building or structure under review. When plans are incomplete or substantially changed so as to require additional plan review, additional plan review fees may be charged based on the additional time required. Plumbing Plan Review Fee 30% of Permit Fee Residential Fire Sprinklers 0001 – 2000 Square feet $80.00 $82.00 2001 – 3600 Square feet $$128.00 131.00 3601 – 7200 Square feet $192.00 $196.00 7201 Square feet and greater $255.00 $261.00 To the above fees, please add 12% State Surcharge. To the above fees, please add a $2.50 Continuing Education Fee. Additional Miscellaneous Fees Miscellaneous Building Fees Table No. 3-F Please add 12% State Surcharge (Where Applicable) Description Fee Master Permit Program $100.00 Investigative Fee $80.00 $82.00 MEMORANDUM 4/2/2014 Page 7 Attachment 1, Page 7 of 11 Inspection For Which No Fee is Specifically Indicated $80.00 $82.00 Moving a Building or Structure $320.00 $327.00 Demolition of a Building or Structure $80.00 $82.00 Mobile Home Accessory Structure $Value Prefabricated Structures $Value Hourly Inspection Fee for Requests Not In Permit Table $80.00 $82.00 Address Assignment, each new or change unless requested by city staff $42.00 $43.00 Temporary Occupancy Permit Approval Shall Not Exceed 30 Days Without Renewal. Renewal Fee is the Same Fee As Original Temporary Occupancy Permit Fee: 1 & 2 Family Dwellings $138.50 $142.00 Triplex & 4-Plex $273.00 $279.00 Apartment Buildings $273.00 $279.00 + $33. $34/unit Remodels Commercial/Industrial Buildings & Tenant Infill $138.50 $142.00 Commercial/Industrial Buildings $411.00 $420.00.00+10% of Bldg Permit Fee Same As Plan Review Submittal $275.00 $281.00 Building Without Permit Penalty Fee $Bldg Permit Manufactured Home Placement $437.00 $447.00 Replacement Plans + copies @ $.75 for first copy + $.50 for each additional copy for 8 ½” x 11” copies, minimum total fee of $20.00 $80.00/hr Fire & Life Safety Plan Review When Required 40% of Building Permit Fee Additional Plan Review Due To Changes In Plans $80.00 $82.00/hr Hazardous Technical Report with No Plan Review $80.00 $82.00/hr Site Investigation and Posting of NSF Check $80.00 $82.00 Administrative Fee for Non-Sufficient Funds Check $138.50 142.00 Administrative Fee – Non Specialty Code Permits 10% Administrative Fee for Cash Deposits 10% Inspections Outside Normal Business Hours – 1 hour minimum $94.50 $97.00 Re-inspection Fee $80.00 $82.00 Quick Start $208.00 $213.00 Not in Use Research Requests Technical (15-30 minutes) $27.50 $28.00 Technical (31-60 minutes) $56.00 $57.00 Non-Technical (15-30 minutes) $18.50 $19.00 Non-Technical (31-60 minutes) $34.00 $35.00 Any copy fee is in addition to research fees. 30 Minutes is minimum fee Posting Substandard Structures $80.00 $82.00 Monthly Reports – Yearly “Mailing” List $70.00 $72.00/mailed $41.00 $42.00/faxed Weekly Issued Reports – Yearly “Mailing” List $303.00 $310.00/mailed $168.00 $172.00/faxed Addressing Information –Non Agency-Government Yearly “Mailing” List $70.00 $72.00/mailed $41.00 $42.00/faxed Fire Department Process/Application Fee 10% of Fire fee MEMORANDUM 4/2/2014 Page 8 Attachment 1, Page 8 of 11 Copying Costs First 5 copies up to 11” x 17” size are free. All additional copies $.50 each Large print copies - $4.00 each All special ordered maps are charged from the GIS price sheet. Copying Fee: Staff charge rate ½ hr. minimum Technical Research Fee: $80.00/hr. Signs Sign Code Plan Review (SMC 8.218(1)) Permit Applications. Two complete sets of plans, engineering calculations, diagrams and other data shall be submitted with each application for a permit. The building official may require plans, computations and specifications to be prepared and designed by an engineer or architect. (a) A scaled plot plan with building dimensions, setback and location of proposed signs shall be submitted with the sign permit application. A photograph of each facade of the building shall be submitted. (b) A scaled elevation drawing shall be submitted in addition to the above requirements if a wall mounted sign will be erected. (c) A description of materials, anchors, footings and attachment systems shall be provided. (d) For all freestanding, pole or projecting signs over 20 feet in height, plans shall be submitted, drawn by a registered engineer. (e) Each application shall include photographs of existing signage on the property associated with the business. (f) If the application is for a billboard, the application must include an approved permit from the state of Oregon under the Oregon Motorists Information Act of 1971 (ORS 377.700 et seq.) prior to the erection of the billboard. Per Sign $42.00 Sign Permit Fees (SMC 8.218(2)) (2) Permit-Fees. Sign permit fees for permanent and temporary signs, excluding electrical, shall be set by resolution of the council. Only one face of a double-faced sign will be used for calculation purposes. Each sign shall be considered separately when calculating plan review and sign permit charges. 0-35 square feet $80.00 36-to 60 square feet $110.00 61 to 100 square feet $140.00 101 to 150 square feet $160.00 151 to 200 square feet $200.00 201 to 300 square feet $250.00 301 to 400 square feet $300.00 MEMORANDUM 4/2/2014 Page 9 Attachment 1, Page 9 of 11 5% Technology Fee (surcharge) will be applied when imposed or collected. 10% Administrative Fee will be applied when imposed or collected. Temporary Sign Permit Fee (SMC 8.218 (4)(3)) Temporary Sign Permit Fees. Four permits for each approved development area shall be permitted per calendar year. The fee for each permit shall be set by resolution by the council. No temporary sign(s) shall be larger than 60 square feet and be erected for a maximum of 30 consecutive days per each permit. The temporary sign(s) shall be located completely on private property and shall be in compliance with the required setbacks as identified in this code. A security deposit is required when this permit is issued. If the applicant fails to remove the temporary sign(s) by the date specified on the permit, the deposit shall be forfeited and the city may remove the temporary sign(s). If any temporary signs are erected without first obtaining a permit, the permit fee shall be doubled. Temporary signs erected by or for the city for city sponsored events, authorized by the city, or for the park district, utility company, or hospital for community events are exempt. Per permit $100.00 Plus security deposit $100.00 5% Technology Fee (surcharge) will be applied when imposed or collected. 10% Administrative Fee will be applied when imposed or collected. Sign Code Modification Fee (SMC 8.238(2)) A modification is defined as a request for a sign that complies with the provisions of this sign code in all respects except size or height and the proposed request is not more than 15 percent greater than otherwise allowed. If the applicant chooses to apply for a modification to the sign code, they may apply through the development services department for a cost set by resolution of the council. This modification request will be reviewed, and a decision reached by the development services director within 30 days of the application, providing the application is complete. The following criteria must be met in order for a modification to be approved: (a) Locational and/or dimensional problems have been identified; and (b) The proposed adjustment will not cause any of the following adverse effects on neighboring properties: (i) Creates a vision clearance hazard for pedestrians, motor vehicles or bicyclists; or (ii) Creates a hazard for fire prevention or fire suppression; or (iii) Public safety is compromised; and (c) The hardship is not self-imposed. Per application $200.00 5% Technology Fee (surcharge) will be applied when imposed or collected. Sign Code Appeal Fee (Building Board of Appeals) (SMC 8.238(5)) An applicant who is denied a modification request may appeal the decision of the DSD to the building board of appeals for a cost set by resolution of the council. The request will be reviewed by the board and a decision reached within 30 days of the application date. Per Application $150.00 5% Technology Fee (surcharge) will be applied when imposed or collected. Sign Code Appeal Fee (City Council Appeal) (SMC 8.238(6)) An applicant may appeal the decision of the Board of Appeals regarding an Appeal of a MEMORANDUM 4/2/2014 Page 10 Attachment 1, Page 10 of 11 modification or a variance to the city council for a cost set by resolution of the council. The city council’s decision is final except that or a writ of review to circuit court is available to appeal the city council’s decision pursuant to Oregon law. [Section 8.238 amended by Ordinance No. 6008, enacted March 18, 2002.] Per application $100.00 5% Technology Fee (surcharge) will be applied when imposed or collected. Sign Code Variance Fee (SMC 2.568(5)) Hear appeals from the sign code as provided in chapter 8, section 8.238 of the Springfield Municipal Code. Per Application $300.00 The following recommended change in Section 7 Engineering for Sewer Connection fee is the only fee change being recommended that requires an amendment to the Municipal Code. It a new few being established to more fairly access to adjoining property owners an in-lieu of assessment fee for a sewer trunk line project that is currently being planned along McVay Hwy. Section 7: Engineering The following fees shall be charged for the Engineering activities of the City: Sewer Connection Fee-Unassessed (Sewer In Lieu of Assessment Fee) (SMC 3.356(3)) Upon making an application as herein provided, such person shall pay to the city an amount based upon the city’s established rate per square foot of benefited property. This rate is based on the average actual sewer construction costs per square foot of benefited property, as set by resolution of the council. Any rate adjustment shall be determined by the previous year’s sewer construction costs and projected inflation to the next construction season. The depth of the benefited property shall not exceed 150 feet from the street or 150 feet from the sanitary sewer line if the sewer line is not within the street right-of-way, except by special authorization by the Director of Public Works and based upon reasonable judgment, such as (a) The location of the building in relation to the referenced 150 foot line; (b) The possibility of future development for the building sites beyond the 150 foot depth. Except as provided by (a) and (b) immediately preceding, a reduced charge will be charged for that area beyond the 150 foot line. The sum so paid may be deposited against any future sanitary sewer assessment which may be made against said property. In the event the sum paid exceeds the assessment any excess will be refunded to the property owner. Per square foot for first 150 fee of depth $0.64 $0.66 And per square foot thereafter $0.32 $0.33 5% Technology Fee (surcharge) will be applied when imposed or collected. Section 3.356(3)(c) “Unassessed Property along McVay Highway, Franklin Boulevard to Nugget Way” The City Council has determined that a special rate is appropriate for properties directly benefitted by the Franklin/McVay Sanitary Sewer Extension, City Project #21080, to provide a reasonable and just fee based upon the size and configuration of the benefitted properties. Per square foot $.18 MEMORANDUM 4/2/2014 Page 11 Attachment 1, Page 11 of 11 RECOMMENDED ACTION: Staff is recommending that two separate public hearings be held for recommended changes to fees and charges contained in the City’s Municipal Code and Building Code. The Building Code changes are primarily changes in response to inflationary cost increases while the change to the Municipal Code is a new fee to address an equitable sharing of costs between the City and property owners. Attachment 2, Page 1 of 2 Attachment 2, Page 2 of 2 Section 6: Building and Safety Fees City of Springfield Community Services Division Building Safety Fee Schedule Effective April 22, 2014 Fees Based on City Council Action of 7/16/2001, 12/2/2002, 11/1/2004 1/17/2004, 1/18/2005, 3/6/2006, 7/2/2007, 6/2/2008 4/21/2014 And ORS455.210, 455.220, 455.842, and 455.844 Section 6: Building and Safety Fees Section 6: Building and Safety Fees The following fees shall be charged for the Building and Safety activities of the City: Site Plan Review Reduction in fee, Resolution 10-51 To the following fees, please add a $2.50 Continuing Education Fee. Building Permits (ORS 455.447) Structural, Commercial and Mechanical Permit Fees Table No. 3-A TOTAL VALUE Fee $1.00 - $2,000 $82.00 $2,001 - $25,000 for the first $2,000 in value $82.00 plus for each additional $1000 or fraction thereof. $10.52 $25,001 - $50,000 for the first $25,000 in value $324.00 plus for each additional $1,000 or fraction thereof $8.00 $50,001 - $100,000 for the first $50,000 in value $523.00 plus for each additional $1,000 or fraction thereof $10.00 $100,001 and Up for the first $100,000 in value $779.00 plus for each additional $1,000 or portion thereof $4.38 In addition to the Building Permit Fee, the Plan Check Fee shall be 65% of the Building Permit fee. For the purpose of defraying the cost of applying regulations as provided in ORS 455.447 a surcharge of 1% to the total fees collected for essential, hazardous, major and special occupancy structures shall be collected. To the above, please add 12% State Surcharge. To the above fees, please add a $2.50 Continuing Education Fee. Electrical Permits Table No. 3-B Description Fee Residence wiring less than 1000 square feet $151.00 Each additional 500 sq.ft. or portion thereof $28.00 Manufactured Home or Modular Dwelling (Service or Feeder) $71.00 Temporary Power – 200 amps or less $71.00 Temporary Power – 201 to 400 amps $98.00 Temporary Power – 401 to 600 amps $142.00 Permanent Service or Feeder – 200 amps or less $91.00 Permanent Service or Feeder – 201 to 400 amps $106.00 Section 6: Building and Safety Fees Permanent Service or Feeder – 401 to 600 amps $178.00 Permanent Service or Feeder – 601 to 999 amps $230.00 Permanent Service or Feeder – 1000 amps or volts $527.00 Electrical Service Reconnection with no changes to existing service size $71.00 One new/alteration/extension of circuit $62.00 Each Additional Circuit $7.00 Each Irrigation Pump $71.00 Each Electrical Sign or Outline Lighting $71.00 Each Signal Panel $71.00 Limited Energy – Residential $36.00 Limited Energy – Commercial/Multi-Family $82.00 Inspections not covered by this schedule minimum 1 hour $82.00 Re-inspection Fee $82.00 Partial Inspection $82.00 Inspections Outside Normal Business Hours $97.00 Minimum Permit Fee $82.00 Investigation Fee $82.00 Inspections For Which No Fee is Specifically Indicated $82.00 Electrical Quick Permits (sold in 10 only) No longer in Use $-0 Building Without Permit Penalty $ Permit Fee Electrical Plan Review 25% of Permit Fee To the above fees, Please Add 12% State Surcharge. To the above fees, please add a $2.50 Continuing Education Fee. Mechanical Permits (Residential) Mechanical Permit Fees Table No. 3-D Description Fee First Appliance $82.00 HVAC Up to 100,000 btu $19.00 More than 100,000 $22.00 Unit Heater $19.00 Boiler/Compressor Up to 100,000 btu$ $19.00 3-15 Horsepower or 100,001 – 500,000 btu $33.00 Over 15 to 30 Horsepower or 500,001 – 999,000 btu $49.00 Over 30 to 50 Horsepower or 1,000,000 – 1,750,000 btu $64.00 Section 6: Building and Safety Fees Over 50 Horsepower or over 1,750,001 btu $107.00 Air Handling Unit Up to 10,000 cfm $12.00 10,001 cfm and over $22.00 Evaporative Cooler/Fan $15.00 Vents Hood and Exhaust $15.00 Vent Fan to One Duct $10.00 Appliance Vent $10.00 Gas Piping Each Piping System 1-4 Outlets $8.00 Each Outlet over 4 $5.00 Air, Oxygen, Other Medical Specialty Piping Each Piping System 1-4 Outlets $8.00 Each Outlet over 4 $5.00 LP Gas Tank and Piping $19.00 Miscellaneous Domestic Incinerator $22.00 Commercial Incinerator $84.00 Wood/Pellet Stove $43.00 Heat Pump $19.00 Preliminary Inspection $82.00 Each Appliance Not Listed on this Schedule $15.00 Inspections Not Covered by this Schedule $82.00 Re-inspection Fee $82.00 Supplemental Mechanical Fee *Not In Use* $-0- Minimum Permit Fee $82.00 Partial Inspection $82.00 Inspections Outside Normal Business Hours $97.00 Investigation Fee $82.00 Building Without Permit Penalty $ Permit Fee Hourly Inspection Fee for Requests Not In Permit Tables $82.00 Mechanical Plan Review Fee 25% of Permit Fee Mechanical Quick Permits (sold in 10 only) No Longer Available $-0- Commercial/Industrial/Public Mechanical System including installation costs Value To the above fees, please add 12% State Surcharge. To the above fees, please add a $2.50 Continuing Education Fee. For the purpose of defraying the cost of applying regulations as provided in ORS 455.447 a surcharge of 1% to the total fees collected for essential, hazardous, major and special occupancy structures shall be collected. Plumbing Permits Plumbing Permit Fees Section 6: Building and Safety Fees Table No. 3-C Fees for the construction, alteration or repair of plumbing on one and two family dwellings, shall be calculated as described below. Fees include drain, waste and vent installation, water distribution piping, the first 100 feet of water service. One or two family with one bath $268.00 One or two family with two bath $420.00 One or two family with three bath $494.00 Each Additional Bath $107.00 Each Additional Kitchen $107.00 Single Plumbing Fixture $21.00 Sanitary Sewer: For the first 100 feet of line $85.00 Each additional 100 feet of line or portion $21.00 Water Service: the first 100 feet of line $85.00 Each additional 100 feet of line or portion $21.00 Storm and Rain Drain: For the first 100 feet of line $85.00 Each additional 100 feet of line or portion $21.00 Sewage Ejector Pump $21.00 Special Waste Connection $21.00 Manufactured Home hook up on improved lot $82.00 Backflow Prevention Device $21.00 Relocated Structure $82.00 Sanitary or Storm Sewer Cap $82.00 Any trap or waste not connected to a fixture $21.00 Any plumbing installation not listed in this schedule with sanitary waste or portable water supply $21.00 Minimum Plumbing Permit Fee $82.00 Partial Inspection fee $82.00 Re-inspection Fee $82.00 Inspections Not Covered By Schedule $82.00 Inspections Outside Normal Business Hours $97.00 Investigation Fee $82.00 Building Without Permit Penalty $ Permit Fee Accessible Minor Plumbing Labels NO LONGER AVAILABLE $ -0- Not Accessible Minor Plumbing Labels NO LONGER AVAILABLE $ -0- Hourly Inspection Fee for Requests Not In Permit Table $82.00 Medical Gas System Inspection Fees – Inspection fees for medical gas systems are a Section 6: Building and Safety Fees combination of Base Fee $ Value + Plus Each inlet or outlet Plan Review Fee for Med Gas $82.00/hr but shall not exceed 30% of the total plumbing permit fee for the building or structure under review. When plans are incomplete or substantially changed so as to require additional plan review, additional plan review fees may be charged based on the additional time required. Plumbing Plan Review Fee 30% of Permit Fee Residential Fire Sprinklers 0001 – 2000 Square feet $82.00 2001 – 3600 Square feet $131.00 3601 – 7200 Square feet $196.00 7201 Square feet and greater $261.00 Section 6: Building and Safety Fees Exhibit A - Ordinance Page 7 To the above fees, please add 12% State Surcharge. To the above fees, please add a $2.50 Continuing Education Fee. Additional Miscellaneous Fees Miscellaneous Building Fees Table No. 3-F Please add 12% State Surcharge (Where Applicable) Description Fee Master Permit Program $100.00 Investigative Fee $82.00 Inspection For Which No Fee is Specifically Indicated $82.00 Moving a Building or Structure $327.00 Demolition of a Building or Structure $82.00 Mobile Home Accessory Structure $Value Prefabricated Structures $Value Hourly Inspection Fee for Requests Not In Permit Table $82.00 Address Assignment, each new or change unless requested by city staff $43.00 Temporary Occupancy Permit Approval Shall Not Exceed 30 Days Without Renewal. Renewal Fee is the Same Fee As Original Temporary Occupancy Permit Fee: 1 & 2 Family Dwellings $142.00 Triplex & 4-Plex $279.00 Apartment Buildings $279.00 + $34/unit Remodels Commercial/Industrial Buildings & Tenant Infill $142.00 Commercial/Industrial Buildings $420.00.00+10% of Bldg Permit Fee Same As Plan Review Submittal $281.00 Building Without Permit Penalty Fee $Bldg Permit Manufactured Home Placement $447.00 Fire & Life Safety Plan Review When Required 40% of Building Permit Fee Additional Plan Review Due To Changes In Plans $82.00/hr Hazardous Technical Report with No Plan Review $82.00/hr Site Investigation and Posting of NSF Check $82.00 Administrative Fee for Non-Sufficient Funds Check $142.00 Administrative Fee – Non Specialty Code Permits 10% Administrative Fee for Cash Deposits 10% Inspections Outside Normal Business Hours – 1 hour minimum $97.00 Re-inspection Fee $82.00 Quick Start $213.00 Not in Use Research Requests Technical (15-30 minutes) $28.00 Technical (31-60 minutes) $57.00 Non-Technical (15-30 minutes) $19.00 Non-Technical (31-60 minutes) $35.00 Section 6: Building and Safety Fees Exhibit A - Ordinance Page 8 Any copy fee is in addition to research fees. 30 Minutes is minimum fee Posting Substandard Structures $82.00 Monthly Reports – Yearly “Mailing” List $72.00/mailed $42.00/faxed Weekly Issued Reports – Yearly “Mailing” List $310.00/mailed $172.00/faxed Addressing Information –Non Agency-Government Yearly “Mailing” List $72.00/mailed $42.00/faxed Fire Department Process/Application Fee 10% of Fire fee Section 6: Building and Safety Fees Exhibit A - Ordinance Page 9 City of Springfield Community Services Division Building Valuation Data The valuation of building construction for building permit purposes shall be the actual total construction cost for the proposed project, including all classes of work. Section 108.3 of the Oregon Structural Specialty Code (OSSC) and the Oregon Residential Specialty Code (ORSC) require permit valuation to include the total value of the work for which a permit is being sought, such as architectural, structural, electrical, gas, mechanical, plumbing equipment and other permanent systems, including material and labor. The applicant for a permit shall provide an estimated permit value at the time of application. If, in the opinion of the Building Official, the valuation is underestimated on the application, the permit shall be denied unless the applicant can provide detailed cost estimates to meet the approval of the Building Official. Final building permit valuation shall be set by the Building Official. The valuation tables below are square foot default tables for certain Occupancies and Type of Construction, provided as a courtesy for permit applicants and are to be used only as a beginning estimate of construction costs where accurate estimates of construction costs have not been determined prior to permit application. As stated previously, permit valuation shall be based on the actual cost of construction. Group 2012 ICC IA IB IIA IIB IIIA IIIB IV VA VB A1 A1 Assembly, theaters with stage 212.00 204.85 199.65 191.24 179.60 174.56 184.86 164.20 157.69 A1.1 A1.1 Assembly, theaters without stage 194.08 186.93 181.72 173.31 161.68 156.64 166.93 146.29 139.78 A2 A2 Assembly, nightclubs 166.35 161.60 157.13 150.84 141.62 137.83 145.25 128.47 123.67 A2.1 A2.1 Assembly, restaurants, bars, banquet halls 165.35 160.60 155.13 149.84 139.62 136.83 144.25 126.47 122.67 A3 A3 Assembly, churches 195.96 188.81 183.60 175.20 163.70 158.66 168.82 148.30 141.80 A3.1 A3.1 Assembly, general, community halls, libraries, museums 163.95 156.80 150.60 143.19 130.66 126.63 136.81 115.27 109.76 A4 A4 Assembly, arenas 193.08 185.93 179.72 172.31 159.68 155.64 165.93 144.29 138.78 B B Business 169.14 162.95 157.42 149.72 135.78 130.75 143.54 119.31 113.65 E E Educational 178.16 172.02 166.90 159.29 148.37 140.44 153.73 129.09 124.71 F1 F1 Factory and industrial, moderate hazard 100.75 96.02 90.26 86.94 77.68 74.37 83.16 64.01 60.19 F2 F2Factory and industrial, low hazard 99.75 95.02 90.26 85.94 77.68 73.37 82.16 64.01 59.19 H1 H1 High Hazard, explosives 94.40 89.68 84.92 80.59 72.52 68.22 76.82 58.86 0.00 H2 H2,3,4 High Hazard 94.40 89.68 84.92 80.59 72.52 68.22 76.82 58.86 54.03 H3 H2,3,4 High Hazard 94.40 89.68 84.92 80.59 72.52 68.22 76.82 58.86 54.03 Section 6: Building and Safety Fees Exhibit A - Ordinance Page 10 H4 H2,3,4 High Hazard 94.40 89.68 84.92 80.59 72.52 68.22 76.82 58.86 54.03 H5 H5 HPM / Semiconductor fab 169.14 162.95 157.42 149.72 135.78 130.75 143.54 119.31 113.65 I1 I1 Institutional, supervised 168.08 162.18 157.65 150.82 138.52 134.86 146.99 124.28 119.86 I2 I2 Institutional, hospitals 287.21 281.02 275.49 267.79 252.87 0.00 261.61 236.40 0.00 I2.1 I2 Institutional, nursing homes 198.55 192.37 186.83 179.13 165.20 0.00 172.95 148.74 0.00 I3 I3 Institutional, restrained 192.65 186.47 180.93 173.23 160.79 154.76 167.05 144.32 136.66 I4 I4 Institutional, day care facilities 168.08 162.18 157.65 150.82 138.52 134.86 146.99 124.28 119.86 M M Mercantile 123.91 119.17 113.69 108.40 98.85 96.06 102.82 85.70 81.90 R1 R1 Residential, hotels 169.51 163.62 159.09 152.26 140.12 136.46 148.59 125.88 121.46 R2 R2 Residential, multiple family 142.14 136.24 131.71 124.88 113.41 109.75 121.89 99.18 94.76 R3 R3 Residential, one-and two-family 133.78 130.13 126.82 123.67 118.74 115.78 119.75 110.94 103.92 R4 R4 Residential, care/assisted living 168.08 162.18 157.65 150.82 138.52 134.86 146.99 124.28 119.86 S1 S1 Storage, moderate hazard 93.40 88.68 82.92 79.59 70.52 67.22 75.82 56.86 53.03 S2 S2 Storage, low hazard 92.40 87.68 82.92 78.59 70.52 66.22 74.82 56.86 52.03 U U Utility, miscellaneous 71.08 67.13 62.83 59.33 53.24 49.79 56.48 41.64 39.44 Attachment 3