HomeMy WebLinkAboutPermit Fence 1988-3-21
" T'
- _."'..............:-,.-.e...
Rcceipt fI.
//1 h f
_ ._....,,.,~.;.........::'u....._. _ ~....-.,..... ___.._~ ,_ ",~......,-:....._\.
oe RESI~TIAL..
APPLICAT1UN/PERMIT
225 North 5th Street
Springfield3 Oregon 97477
Building Division
726-3753
Job Location:
/143
)'7 03
L~r/aa e.,
~5 ~I J
Ha (!€.
fJ1 ~U / D 1/ fL}-10 10 IUS
Address: j r; '1-/3 (P.tl-Y )"1 ttl q e...- Pc.
. <:) ~ (). I /I .J
City: ~)YJ# Q ft'f"_lcf
, I
Assessors Map #
Subdivision:
Ol.mer:
NmJ
Addi tion
Remodel
Nobile Home
Date of Applicatien
Contractors
3-0<./- (1.~
~.p~ri:-
General
Plwribing
, Electrical
Mechanical.
C0718tl'Uetion Lender
T= Lot #
/DIOO
v~.
-OIL
Phone:
7<1'1 h</~O
9?'I77
0C"d \
II \ I
Zip:
Describe ivork:
~Po
Value
-S6D ~
';V
~.^)
Signed:
Date:
~t'~R~
'f..:...c:L I - 8'&-
Ad.cL.=ess
Lisc.#
Exr;ircs
Phonc
It is, the responsibility of the permit hoLder to see that all inspections are made at the proper time, that eaeh ~ess is readabre
from the street, and that the permit card is located at the front of the property.
*BuiZding Divi~ion approved plan shall remain on the Building Sits at all times.
PROCEDURE FOR INSPECTION REQUEST:CALL 726-3769 (rccorder) state your City designated job nwnber, job address, type of inspecticn
requested and when you will be ready for inspection, Contracters or Ol.mers name and' phone nwribcr. Requests received befere 7:00 am
;,.'iU be made the same day, requests made after 7:00 am wiU be made the next :;lorking day.
Reouipcd Tnsvcctiens
D SITE INSPECTION: To be made after
excavation, but prier to set up of
, forms.
O UNDERSLAB PLUNBING. ELECTRICAL &
: MECHANICAL: To be made before any
work is covered.
o
FOOTING & FOUNDATION: To be made
after trenches are excavated and
forms are erected, but prior to
pouring concrete.
UNDERGROUND PLUMBING. SEWER. W.4TER.
DRAINAGE: To be made prior to fiZ-
,Zir.g trenches.
o
o
UNDERFLOOR PLUMBING & MECHANICAL:
To be made prior to installation of
/Zoor insulation or decking.
POST AND BEAM: To be made prior to
installation of floor insulation or
deckin:; .
ROUGH PLUMBING. ELECTRICAL & MECH-
ANICAL: No :;lork is to be covered
.ur.til these inspections have beer.
made and approved.
FIREPLACE: Prior to placir.g facing
materials and before framing inspec-
tion.
D FRAJ1ING: Must be requested after
approval of rough plwnbing, electri-
cal & mechanical. All roofing
braaing & chimneys, etc. TrrvlSt be
,. comp leted. No work is to be con-
,~,cealed until this inspection has
~be~n made and approved.
o
o
D
.~'.'~' -
Your City Desigr~ted Job Number Is:
D INSULATION/VAPOR BARRIER INSPECTION:
To be made after all insulation a~4
" required vapor barriers are in place
, , but before any lath, gypsum board or
1.JClU covering is applied, and before
any insulation is concealed.
o
DRYWALL INSPECTION: To be made
after aU d:t>ywaU is in place,
but prior to any taping.
?5'i?LJw3lJ
DEMOLITION OR ;~;OVET) BUILDIilGS
==:J Sanitary se~er capped at p~oper~d line
~ Septi~ tank p~ed and filled with gravel
I Pinal - f"hen above items are completed
~ and when demolition is complete or stru~-
ture moved and premises cleaned up.
I Mobi l.e Homes
~ Blocking and Set-up
~ Plumbing connections s~er and Water
~ Electrical Connection - Blocking, set-up
~ and plumbing connections TrrvlSt ce approved
before requesting electrical inspection
~ AcceSso1"d Building
I Pinal - Aftcr porches, skirting, decks,
---l etc. are completed.
D
All project conditions, such as the installation of street trees, co~letion of the
required landscaping, etc., must be satisfied before the BUILDING FINAL can be requested.
D FINAL PLUMBING
o FINAL MECHANICAL
o PINAL ELECTRICAL
o
o
FINAL BUILDING: The Final Building Inspection must be requested after the Final Plumbing
Electrical, and Mechanical Inspections have been made and approved.
D MASONRY: Steel
beams, grouting
accordance with
2415.
O WOODSTOVE: After installation is
completed.
location, bond
or verticals in
U. B. C. Section
D
CURB & APPROACH APRON: After forms
are erected but prior to pouring
concrete.
SIDEWALK & DRIVEWAY: For aU con-
crete paving within street right-
of-way, to be made after all exca-
vating complete & form work & sub-
, base material in place.
o
~"'ENCE: 'ilhen complete -- Provide
ates or movable sections through
P.U.E.
o ~\'
*ALL MANHOLES AND CLEANOUTS MUST BE ACCESSIBLE, ADJUST!fENT TO BE U1DE J1.T NO COST TO CITY I Page 1 of 2
Pa.ge;!
'- -
"
-.'-~
. 1 :"t~.
\./- '-': c ,
JOB NO.
SOL A R A,S:; C E S S R E Q.-
L -CO G~
I
I
\
I
1
I
I
I
I
Zone:
Ocauvancy Grr..,
Tijpe/Const:
Inter>ior>
Corner
P.L.
North
East
South
West
Setbacks
I House , CaI'age
I
i
I
I
Access.
Bedrooms:
Enerqu Sources Ti./ve
Heat
Water> Heater
Range
I Firev lace
Wood3tove
Lot Sq. Ftg.
~ of lot Coverag~
# of Stories
Total Height
, Topography
WTTYPE
Lot Faces -
Panhandle
CUl-de-sac
Fees
ITEM SQ.FTG X Value
Main
Gc::r>aae
I CaI'vor>t
I "
",
I Accessori./
I
, TOTAL VALUE
Is.D.C. (va.~ue)
1.5 x ' *
Building Value & Permit
This permit is granted on the express condition that the said construction
shall. in all respects. conform to the Ordinance adopted by the City 'of
Springfield. including the Zoning Ordinance. regulating the construction
and use of buildings. and may be suspended or revoked at a.ny time upon vio-
Zation of any provisions of said Ordinances.
Building Permit
Total Cha..~ges
*
Plan Check Fee:
Date Paid:
IRec~ipt #:
I Signed:
State SUX'chaI'ge
ITEM
Fixtu:r>es
NO.
FEE
CHARGE
Plumbing Permit
Residential (1 bath)
I Sanitary Sewer
I Water>
No person shall construct. install. alter or change any new Dr existing
plumbing or drainage system in whole or in paI't. unless such person is the
legal possessor of a valid plumber's license. except that a person may do
plumbing work to property which is owned. leased or operated by the appli-
cant.
Plumbing Permit
State SUX'cr.a.!'ge
lITEM
Res. So.' fto.
I New/Extend Cirauits
!Temporary Service
I
NO.
FEE
CHARGE
I *
I
Electrica I
Perm it
Total Charaes
Wher>e State LCl1JJ requires th.at the electrical wor>k be done by an EleCJtrical
Contractor. the electrical portion of this permit shall not be valid until
the label has b~en signed by the Electrical Contractor>.
FEE
CHARGE
I
I
I
I *
I,
I
I
I
Mechanical Permit
Electrical Permit
State SUX'CJharge
Total Charqes
lITEM
I Fia'nace ETU' S
I Exhaust, Hood
I Vent Fan
Woodstove
I NO.
I
I
I
I
I
Permit Issuance
Mechanical Permit
State SUI'charoe
Total Charaes
I -- ENCROACHMENT --
Ise~~rity Deposit
I Stor>age
I Maintfnanaf}
Permi t
*
Ferwe
I
I
I
I
I
I
I
5~
l
I
I
r
I
I
5:,oV , \~
I '
Plan Examiner>
uate
Total Char>ges
I HA VE CAREFULLY EXAMINED, the comp leted app I ication for permi t. and do
hereby certify that all information hereon is true and cor>r>ect. and I
further certify that any ar.d all work perfor:ned shall be done ~n accor-
dance with the Ordinances of the city of Springfield. and th~ L~~s of the
* State of Oregon pertaining to the wor>k described herein. and that NO OCCU-
PANCY will be made of any structUl'e without permission of the Building Di-
vision. I further certify that only contractors and ~~ployees who aI'e in
compliance with ORS 701.055 will be used on this project
I CuZ'baut
I Sidewalk
Electrical Label
I Mobile Home
TOTAL AMOUNT DUE: *
~t:~
Signad
. . . . - - .
CJ?<?'/~i1?,<.' -;
, Date
.-)
',. ,'"'
<..: ,."', ... .....
*