Loading...
HomeMy WebLinkAboutBuilding Field Test & Inspection Report 2014-1-2 • ® Page 1 of 1 IEST/NGsINSPECTIGN,E G.cmehnleule Construction Services Geotectmical&CorstruGbnServices Daily Field Report Client: Ms. Sally McKinne Project: Timber Products Headquarters Date: 01-02-14 Timber Products 305 South 4th Street Project No.: 2137185 PO Box 269 Springfield, Oregon Report No.: E-35779 Springfield. Oregon 97477 Inspector: A. Fenstermacher ID No.: 5258882-49 ICC Inspection of: Epoxy Anchors Weather: Inside Continuous Inspection: ❑ Contractor: Chambers Construction BP No.: 811-SPR2013-02200 Periodic Inspection: 11 • Performed continuous inspection during the installation of two (2) 1/2" x 6 1/2" and one (1) 5/8" x 16" all-thread anchors into slab and footing for attachment of plumbing wall hold-downs. Prior to installation, the predrilled holes were cleaned with a brush and compressed air. Verified minimum embedment depth of 8" for 5/8" anchor and 2 3/4" for 1/2" anchors. Anchors were secured with Hilti Hit RE 5005D epoxy(ICC — ES ESR 2322/expiration 09/2014). • • To the best of our knowledge, the work inspected was in accordance with RFI 7 and applicable workmanship provisions of the I.B.C., except if noted above. Reviewed By:. • Michael L. Meyer Technical Manager • • c: Firm 151 —Jenn Ward (email) Chambers Construction— Frank Travis(email) City of Springfield— Robert Castile (email) MLM:sc • • • • • This report and/or enclosed test data is the confidential property of the client to whom it is addressed and pertains to the specific process and/or material evaluated. As such,information contained herein shall not be reproduced in part or full and/or any part thereof be disclosed without FE'Testing 8 Inspection,Inc.'s written authorization. 750 NW Cavell Avenue•Corvallis,Oregon 97330.phone(541)7574698-fax(541)757-2991 29540 B Airport Road•Eugene,Oregon 97402•phone(541)6843849•fax(541)684-3851 62979 NE Plateau Drive,Suite 3•Bend,Oregon 97701 phone(541)382-4844•fax(541)382-4846 •