Loading...
HomeMy WebLinkAboutBuilding Field Test & Inspection Report 2013-10-25 Si e f Page 1 of 1 nrfsDNC&)nsFfco&seric , Geoted,nical&ConstudionServices Daily Field Report Client: Mr. Nathan Endicott Project: Hayden Bridge Headhouse Date: 10-25-13 EWEB 3957 Hayden Bridge Project No.: 2137186 500 E. 4th Ave. Springfield, Oregon Report No.: E-35299 PO Box 10148 Inspector: D. Delatte Eugene, Oregon 97440 ID No.: 1080867-88 ICC Inspection of: Reinforced Concrete Weather: Overcast Continuous Inspection: ❑ Contractor: John Hyland Construction BP No.: 513-1789 Periodic Inspection: 0 Performed final inspection on the reinforcing steel for infill around new man door at existing wall. Preliminary reinforcing steel inspection was performed on 10-21-13 (ref: • FEI report E-35281). Observed the placement of 3.0 yards of Knife River 4000 psi concrete (mix 40N15200). Concrete was placed by pump and was manually and mechanically consolidated. Cast one (1) set of four (4) 4" x 8" concrete test cylinders. Slump —4 3/4"; air temperature— 43F; concrete temperature—63F. Dave Shaw(JHC)was advised of the on-site test results. To the best of our knowledge, the work inspected was in accordance with plans dated 05-28-13 and applicable workmanship provisions of the I.B.C., except if noted above. Reviewed By: Michael L. M r Technical Manager c: John Hyland Construction—Dave Shaw (email) City of Springfield — Robert Castile (email) MLM:sc This report and/or enclosed test data is the confidential property of the client to whom it is addressed and pertains to the specific process and/or material evaluated. As such, information contained herein shall not be reproduced in part or full and/or any part thereof be disclosed without FEI Testing&Inspection,Inc.'s written authorization. 750 NW Cornell Avenue•Corvallis,Oregon 97330 phone(541)757-4-698.fax(541)757-2991 2954013 Airport Road•Eugene,Oregon 97402•phone(541)684-3849 fax(541)684-3851 62979 NE Plateau Drive,Suite 3 Bend,Oregon 97701 •phone(541)382-4844•fax(541)382-4846