Loading...
HomeMy WebLinkAboutBuilding Field Test & Inspection Report 2013-11-14 ® Q n '� 00 Page 1 of 1 lfsh/nc A/NSPfCI/ON,YMce technical&Construction Services ', / Daily Field Report Client: Ms. Laura Farthing Project: Hayden Bridge Water Date: 11-14-13 EWEB Intake Improvements Project No.: 2127278 PO Box 10148 Springfield, Oregon Report No.: E-35480 Eugene, Oregon 97440 Inspector: A. Fenstermacher ID No.: 5258882-49 ICC Inspection of: Epoxy Dowels Weather: Overcast Continuous Inspection: ❑ Contractor: John Hyland Construction BP No.: -- Periodic Inspection: RI Performed continuous inspection during the installation of eighteen (18) #5 x 3' dowels into wall for door infill on the west side: Prior to installation, the predrilled holes were . cleaned with a brush and compressed air. Verified minimum embedment depth of 5". Dowels were secured with Hilti Hit RE 500SD (ICC — ES ESR 2322/ expiration date 08/2014). To the best of our knowledge, the work inspected was in accordance with plans dated 04/2012 and applicable workmanship provisions of the I.8:C., except if noted above. • Reviewed By: M. , /r • Michael L. Mey r Technical Manager c: • John Hyland Construction — Dave Shaw(email) OBEC — Pete Slocum (email) City of Springfield MLM:sc This report and/or enclosed test data is the confidential property of the client to whom it is addressed and pertains to the specific process and/or material evaluated. As such,information contained herein shall not be reproduced in part or full and/or any pad thereof be disclosed without FEI Testing&Inspection,Inc.'s written authorization. 750 NM/Cornell Avenue•Corvallis,Oregon 97330•phone(541)757-7698 fax(541)757-2991 29540 B Airport Road•Eugene,Oregon 97402•phone(541)6843849•fax(541)684-3851 62979 NE Plateau Drive,Suite 3 Bend,Oregon 97701 •phone(541)382-4844•fax(541)382-4846