HomeMy WebLinkAboutPacket, Pre PLANNER 11/26/2013 • ,
' r♦
Planner: L
Date: 1 1 Zlr 1
Pre-Submittal Packet
1 of (07 pages
PRE-SUBMITTAL
DISTRIBUTION LIST:
Date Distributed: 1 •
•
✓ David Bowlsby — Building
Gilbert Gordon/Melissa Fechtel — Fire
✓ Michael Liebler — Traffic
✓, Ken Vogeney- DPW/Engineering
✓ Chris Moorhead, Surveying _
Planner ;e144 aid c witizil/td,
The complete Pre-Submittal Meeting informational packet for this meeting
is available on-line for you to review or print out @ Laserfiche website:
www.springfield-or.qov/weblink8/
•
City of Springfield
Development Services Department SPRINGFIELD
225 Fifth Street
Springfield, OR 97477
541-725-3753 Phone OREGON
541-726-3689 Fax
Pre-Submittal Meeting
Case Number Assigned: PRE13-00038
Date Submitted: 11/25/2013
Project Name: Gateway Mall Redevelopment-Andy Limbird planner
Project Description: Pre-Submittal Meeting- Site Plan Review Major Modification
Redevelopment/Enhancement of the existing mall with development of new
retail/anchor stores.
Application Type: Pre-Submittal Site Plan Tentative Mod Major -
Job Address: 2780 GATEWAY ST
Assessor's& Tax Lot#: 1703220002109
1703220002200
1Meettng Date :E:t 12/06/2013 °""' 1� -� r r. f, .
Meetmg Ttmea, s. f. r 17 00 I'LQOf t A P CO & :sr e s -'A
''Planner ALIMBIRD -i'" .a
#tMvnF i "� G rs,+ _ U: a :+a 4 rssr''�+f. ."� at: r41 t,
€'x 5 a "1 it
s r
?X.m,,;tt.,a,...s wt- ., r .itkit .._.. r_ -. ,w .....«i�.,.t ..'r__ , m_ irE'Et«...,:, q.'_.__� _..;w."'=..:::Stems t.w"_3...: AM b
DISCLAIMER:Applications will not be exempt from Development Code or procedural amendments that may occur between the
time of the Pre-Submittal Meeting and Submittal of the Application for Development Review. Please contact our office at
541-726-3753 with any questions or concerns.
A Planner will be assigned the following business day and will contact you to confirm the meeting date and time.
PO3 -Owoig'►
PRE-SUBMITTAL REC'D
NOV 2 5 2013
C\myReports/reports//production/Springfield/PL_FRM_PRESUB.rpt - 11/25/2013
• • •
Pre- Submittal Meeting
Development and Public Works Department
Room 616
PRE-SUBMITTAL MEETING DATE: Friday, December 6, 2013
1. PRE-SUBMITTAL MTG#PRE13-00038 SITE MODIFICATION-Major ROUSE PROPERTIES
Assessor's Map: 17-03-22-00 TL 2109, 2200, 2218, 2300, 2305 PRJ13-00019 (Gateway Mall)
Address: 3000 Gateway Street
Existing Use: Gateway Mall
The applicant submitted plans proposing a major redevelopment to existing Gateway Mall. The
proposed modifications will include selective demolition and redevelopment of the existing Mall
building, construction of new satellite retail and restaurant building pads around the east perimeter of
interior road, new truck loading docks on the west side, and associated site improvements.
Meeting Date/Time: Friday, December 6, 2013 11:00—noon DPW 616
Planner: Andy Limbird
The Pre-Submittal informational packet for this meeting is available on-line for you
to review or print out @ the laserfiche website: www.springfield-or.gov/weblink8/
PRE-SUBMITTAL REC'D
NOV 2 5 2013
•
• •
;City of Springfield SPRINGFIELD
Development Services Department
225 Fifth Street
Springfield, OR 97477
Site Plan Review
Application Type (Applicant: check one)
Site Plan Review Pre-Submittal: • Major Site Plan Modification Pre-Submittal:
Site Plan Review Submittal: ❑ Ma-or Site Plan Modification Submittal: ❑
Required Project Information (Applicant: complete this section)
Applicant Name: Eric Dinenberg, Senior Director, Developement Phone: 645-593-7685
Company: Rouse Properties Inc. Email: Eric.Dinenberg@
rouseproperties.com
Address: 1114 Avenue of the Americas,Suite 2800, New York,NY 10036-7703
Applicant's Rep.: Geoff Larsen, P,E, Phone: 541-686-8478
Company: Balzhiser&Hubbard Engineers Inc. Email: Glarsen@
bhengineers.com
Address: 100 West 13th Avenue, Eugene, OR 97401
Property Owner: Rouse Properties Inc. Phone: 645-593-7685
Company: Same as above Email: N/A
Address: Same as above
.f- . -,..-hare. Os+�4•∎••
ASSESSOR'S MAP NO: 17-03-22 TAX LOT NO(S): 2109, 2200, 2218,2300,2305
Property Address: 3000 Gateway Street, Springfield OR 97447
,Size of Property: 70 Acres • Square Feet 0 , Proposed Density: N/A
Proposed Name of Project: Gateway Mall Redevelopment
Description of If you are filling In this form by hand, please attach your proposal description to this application.
Proposal: Refer to attached written statement
Existing Use: Shopping Center!Mall
New Impervious Surface Coverage (Including Bldg. Gross Floor Area): sf
Si natures: Please sign and •rint our name and date in the a••ro•riate box on the next .a.e.
Required Project Information (City Intake Staff: complete this section)
Associated Applications: 7 I�
Signs:
Pre-Sub Case No.: f r
r Date: I I ) L5 1 J Reviewed by: I
ro �Case No.: I 1 r 000 2 g Date: Reviewed by:
Application Fee: $ 3I1O Technical Fee: $ Postage Fee: $
TOTAL FEES: bi-qp PROJECT NUMBER: (12---5 I - 040
Revised 2/27/12 EMM NOV Q 13 1 of 11
v
. . • •
,, i. ± :i''' i 1.- i ; r Ns. '":„.. \<
i g 1 litiskiete
Postal-Vijay i 2 '� N. # _
,: Of '4 '
' - - ---Ii IL -
I ...,
_ ..- a ..- -
' :7 r! r� � / flame �
M
:II- . � �3
JIi !j try'- � !
f 1 ■ - -n 'il ill
\-tbirt.�
li
laverk �
■
1
1 IARLOW.RD-
5 i t-t
c ii,
• _ -ie.,'" I-, ! a i ,. II, , _ Elm
i1 i.1)11) 1_I '.S,=l j - -
c- �, --1.; r _q DI
` V
SITES
VICINITY MAP
ft PRE13-00038 Pre-Submittal Mtg (Site Mod — Major)
17-03-22-00 TL 2109, 2200, 2218, 2300, 2305
N 3000 Gateway Street
Rouse Properties (Gateway Mall)
PRE-SUbivlu I IHI RECD
NOV 2 5 2013
• •
ROUSE
PR PFP
Gateway Mall Redevelopment
Site Plan Review Major Modification
Draft Written Statement
Engineer-of-Record: Monica Anderson, PE
Project Engineer: Geoff Larsen, PE
Author: David Looney, EIT
November 15, 2013
BHE Project No. 2100-024-13
•
f11~ a 14,1 ± r.
-4111hir .11
BALZHISER & HUBBARD ENGINEERS'RE,SUBMITIAI RECD
NOV 2 5 2013
Mechanical • Electrical •Civil • Surveying
100 West 13th Avenue,Eugene,Oregon 97401
Phone:(541)686-8478•Fax:(541)345-5303 _
www.bhengineers.com
• •
Gateway Mall Redevelopment
Site Plan Review - Major Modification Pre-Application 11/15/13
Contents
I. INTRODUCTION 3
A. General Information 3
B. Project Summary 3
II. LAND USE REQUEST 4
III. SITE INFORMATION 4
A. Location and Property Information 4
B. Existing Development Agreement and Site Use 4
C. Proposed Modifications and Site Use 5
IV. APPROVAL CRITERIA 6
A. Compliance with Zoning Requirements: 6
B. Maintaining Adequate Capacity in Public and Private Facilities:' 6
C. Compliance with Applicable Design and Construction Standards: 7
D. Compliance with Parking and Ingress-Egress Standards: 7
E. Protection of Physical Features 7
V. COMPLIANCE WITH SPRINGFIELD DEVELOPMENT CODE 7
A. Section 3.2-300 - Commercial Zoning Districts 7
3.2.310 Schedule of Use Categories 7
3.2.315 Base Zone Development Standards 8
B. Section 3.3-200 - Drinking Water Protection Overlay District 8
3.3-220 Time of Travel Zones 8
3.3-225 Review 8
3.3-235 Standards for Hazardous Materials within Time of Travel Zones 9
C. Section 3.3-400 Floodplain Overlay District 9
3.3-410 Applicability 9
D. Section 4.2-100 - Infrastructure Standards - Transportation 9
4.2-105 Public Streets 9
4.2-110 Private Streets 9
4.2-115 Block Length 9
4.2-120 Site Access and Driveways 9
4.2-125 ' Intersections 10
4.2-130 Vision Clearance 10
4.2-135 Sidewalks 10
4.2-140 Street Trees 10
4.2-145 Street Lighting 10
4.2-150 Bikefvays 11
4.2-155 Pedestrian Trails 11
PRE-SUBMITTAL RECD
NOV 2 5 2013 PAGE 1
A BALZHISER Sr HUBBARD ENGINEERS
II/
Gateway Mall Redevelopment
Site Plan Review - Major Modification Pre-Application 11/15/13
4.2-160 Accessways 11
E. Section 4.3-100 - Infrastructure Standards - Utilities 11
4.3-105 Sanitary Sewers 11
4.3-110 Stornnvater Management 11
4.3-115, 4.3-117 Water Quality Protection, Natural Resource Protection Areas • 13
4.3-120 Utility Provider Coordination - 13
4.3-125 Underground Placement of Utilities 13
4.3-130 Water Service and Fire Protection 13
4.3-135 Major Electrical Power Transmission Lines 14
4.3-140 Public Easements 14
4.3-145 Wireless Telecommunications System (WTS)Facilities 14
F. Section 4.4 - Landscaping, Screening and Fence Standards 14
4.4-105 Landscaping 14
• 4.4-110 Screening 14
4.4-115 Fences 14
G. Section 4.5-100 - On-Site Lighting Standards 14
4.5-110 Illumination and Height • 14
H. Section 4.6-100 - Vehicle Parking, Loading and Bicycle Parking Standards 15
4.6-110 Vehicle Parking- General 15
4.6-115 Vehicle Parking- Parking Lot Design 15
4.6-120 Vehicle Parking-Parking Lot Improvements 15
4.6-125 Vehicle Parking- Parking Space Requirements 15
4.6-135 Loading Areas -Facility Design and Improvements 15
- 4.6-145 Bicycle Parking - Facility Design 16
•4.6-150 Bicycle Parking-Facility Improvements 16 •
4.6-155 Bicycle Parking-Number of Spaces Required 16
I. Section 5.17-100 - Site Plan Review 16
5.17-115 Phased Development 16
5.17-120 Submittal Requirements 16
VI. EXHIBITS 18
A. Exhibit A: TIS and Parking Study 18
B. Exhibit B: Deed and Title Report 19
C. Exhibit C: Architectural Renderings • 20
D. Exhibit D: Reduded Scale Site Map 21
E. Exhibit E: Existing Lighting Cutsheets 22
F. Exhibit F: Photometric Test Report for Light Sources 23
PRE-SUBMITTAL RECD
NOV 252013
BALZHISER & HUBBARD ENGINEERS PAGE2
• •
Gateway Mall Redevelopment
Site Plan Review - Major Modification Pre-Application 11/15/13
INTRODUCTION
A. General Information
Owner and Applicant:
Gateway Mall
Rouse Properties, Inc.
1114 Avenue of the Americas, Suite 2800, New York, NY 10036-7703
(645) 593-7685
Contact: Eric Dinenberg, Senior Director, Development
Eric.Dinenberg a rouseproperties.com
Applicant's Representative:
Balzhiser & Hubbard Engineers, Inc.
100 West 13th Avenue, Eugene, OR 97401
(541) 686-8478
Contact: Geoff Larsen, P.E.
G Larsen @bh engineers.com
B. Project Summary
Rouse Properties, Inc., the owner of the Gateway Mall and associated properties, is
proposing a major redevelopment project to improve the existing Gateway Mall facility
and surrounding site. The proposed redevelopment seeks to revitalize the Mall through
building renovations and modernization, building additions, and site improvements. The
proposed improvements include:
• Renovation and modernization of the main Mall building located between the
existing Kohl's, Cabela's, and Target anchor stores.
• Reconstruction of the east face of the Mall building to improve tenant visibility
and provide direct exterior access to retail stores.
• Removal of the existing Food Court and Movies 12 theater to improve access to
the east face of the Mall.
• Construction of a new retail store addition located south of the existing Kohl's
anchor store.
• Addition of four new satellite retail and restaurant building pad sites located along
the eastern section of the Mall Ring Road.
• Extension of the existing covered walkway from the Lane Transit District (LTD)
EMX bus station to the new west face of the Mall.
• Construction of three new truck loading areas along the west face of Mall.
• Parking lot improvements to improve pedestrian, bicycle, and vehicle access and
safety throughout the site.
• Bicycle and pedestrian improvements to improve connectivity between the
Interstate-5 bike/pedestrian bridge and Gateway Street.
PRE-SUBMITIAL REC'D
NOV 2 5 2013
�� BALZHISER be HUBBARD ENGINEERS --- ' PAGE
3
I1/
• •
Gateway Mall Redevelopment
Site Plan Review - Major Modification Pre-Application 11/15/13
II. LAND USE REQUEST
The applicant is requesting approval of a Site Plan Review Major Modification
(SPRMM), under the Type II land use process, for the proposed site redevelopment
project. The nature of the proposed redevelopment and associated site plan is
documented in this written statement, supporting exhibits, and drawings. Section III,
below, provides context and background information for the existing and proposed
development site and associated uses. Section IV, below, provides specific information
necessary to evaluate application approval criteria.
III. SITE INFORMATION
A. Location and Property Information
Location: The development site is located in the Gateway area of Springfield, bordered
by Gateway Street to the east, I-5 to the west, Harlow Road to the south, and commercial
property to the north.
Property: The development site is located within Tax Lots 2109, 2200, 2218, 2219, 2300,
2307, and 2305 of Lane County Assessor's Map 17-03-22. Rouse Properties Inc. owns
all Tax Lots except Lot 2307, which is owned by Target Corporation. The development
site comprises approximately 70 acres. Refer to the attached title report in Exhibit B for
additional property information.
Floodplain: Federal Emergency Management Agency (FEMA) Flood Insurance Rate
Map (FIRM) No. 41039C1133F lists the site as "Zone X" which is outside of the 500-
year floodplain, and not within a special flood hazard area.
Soil Conditions: The National Resources Conservation Service (NRCS) Soil Survey
classifies the on-site soils as Courtney Gravelly Silty Clay Loam, Malabon Silty Clay
Loam, Malabon-Urban Land Complex, Salem Gravelly Silt Loam, and Salem-Urban
Land Complex. The approximate depth to groundwater is greater than 60-inches.
B. Existing Development Agreement and Site Use
The existing Gateway Mall development was originally approved through a 1988 site
plan review and Disposition and Development Agreement (Journal #88-44251). The site
plan has been subsequently modified several times to accommodate a new movie theater,
anchor stores, satellite building pads, site improvements, and public transit projects.
Refer to Table 1 for a summary of existing buildings and floor areas within the
development site.
PRE-SUBMITTAL REC'D
NOV 2 5 2013
011' PAGE Sc HUBBARD ENGINEERS PAGE4
Gateway Mall Redevelopment
Site Plan Review - Major Modification Pre-Application 11/15/13
Table 1A-Existing Site Usage Table 1B-Proposed Site Usage
Mall Building Mall Building
Description Building Space Description • Building Space
(Square Feet) (Square Feet)
Existing Retail Space 746,588 Existing Retail Space to Remain 438,179
Intact
Total-Mall Building 746,588 Existing Retail Space to be 245,196
Renovated
Existing Retail Space to be (63,213)
Removed
Proposed Building Expansion 18,829
Total-Mall Building 702,204
Net Change, Decrease (44,384)
Satellite Building Pads Satellite Building Pads
Description Building Space Description Building Space
(Square Feet) (Square Feet)
Existing Roadhouse Grill 6,917 Existing Roadhouse Grill 6,917
Existing Applebec's 5,250 Existing Applebee's 5,250
Existing Carl's Jr. 3,656 Existing Carl's Jr. 3,656
Existing Buffalo Wild Wings 5,890 Existing Buffalo Wild Wings 5,890
Existing Umpqua Bank 1,300 Existing Umpqua Bank 1,300
Existing Big 5 13,000 Existing Big 5 13,000
Existing Walmart 37,857 Existing Walmart 37,857
Total-Satellite Pads 73,870 New Pad 1 29,400
New Pad 2 17,401
New Pad 3 7,263
New Pad 4 7,263
Total-Satellite Pads 135,197
Net Change, Increase 61,327
C. Proposed Modifications and Site Use
The proposed modifications will include selective demolition and redevelopment of the
existing Mall building, construction of new satellite retail and restaurant building pads
around the east perimeter of the ring road, new truck loading docks at the west side of the
Mall, • and associated site improvements. Proposed building improvements are
summarized in Table 1B.
•
PRE-SUBMITTAL REC'D
NOV 252013
/ � BALZHISER & HUBBARD ENGINEERS PAGE5
Gateway Mall Redevelopment
Site Plan Review - Major Modification Pre-Application 11/15/13
IV. APPROVAL CRITERIA
In accordance with Springfield Development Code (SDC) 5.17-125 (A) through (E), the
criteria for approval of the SPRMM application includes compliance with zoning
requirements, maintaining adequate capacity in public and private facilities, compliance
with applicable design and construction standards, compliance with parking and ingress-
egress standards, and protection of physical features. The findings presented below
document compliance with each of the approval criteria and applicable sections of the
SDC. This section is organized to follow the format of the applicable SDC Sections,
which are outlined in bold below, where included. The wording of the SDC is shown in
italics below, followed by the proposed findings of fact in normal text.
A. Compliance with Zoning Requirements:
The zoning is consistent with the Metro Plan diagram, and/or the applicable Refinement
Plan diagram, Plan District map, and Conceptual Development Plan.
Findings: The development site is zoned and designated Community Commercial (CC)
according to Springfield Zoning Map and adopted Gateway Refinement Plan. There are
no proposed changes to the zoning for this site. Refer to findings under SDC 3.2-300 for
further discussion. The adopted Gateway Refinement plan also includes the following
Policies and Implementation Actions:
1.1 Give particular attention, during the site plan review process, to minimize lighting,
noise, and visual impacts from commercial development on adjacent residential areas.
Existing residential areas, zoned as Medium Density Residential (MDR), are located to
the east of the development site. The redevelopment project is separated from the
• existing residential areas by Gateway Street and the Mall Ring Road. Existing street
trees currently provide a visual buffer between the proposed development site and the
existing residential areas. Proposed landscaping improvements will enhance this visual
buffer. Refer to Planting Plans [to be provided for tentative submittal] for location of
new and existing trees.
B. Maintaining Adequate Capacity in Public and Private Facilities:
Capacity requirements of public and private facilities, including but not limited to, water
and electricity; sanitary sewer and stornnvater management facilities; and streets and
traffic safety controls shall not be exceeded and the public improvements shall he
available to serve the site at the time of development, sinless otherwise provided for by
this code and other applicable regulations. The public works director or a utility
provider shall determine capacity issues.
Findings: The capacity of existing and proposed public and private facilities is expected
to be adequate for the proposed development. Refer to findings for SDC 4.3-100 -
Infrastructure Standards-Utilities, below for further discussion about availability and
capacity of public and private utilities. Refer to findings for SDC 4.2-100 - Infrastructure
Standards-Transportation, below, for further discussion about availability and capacity
��� NOV 2 5 2013 PAGE
BALZHISER & HUBBARD ENGINEERS
•
Gateway Mall Redevelopment
Site Plan Review - Major Modification Pre-Application 11/15/13
for streets and traffic safety controls.
C. Compliance with Applicable Design and Construction Standards:
The proposed development shall comply with all applicable public and private design
and construction standards contained in this Code and other applicable regulations.
Findings: The proposed development will comply with the applicable design and
construction standards of the SDC and the Springfield Engineering Design and
Procedures Manual (EDSP). Refer to findings for SDC 3.2-300, 3.3-200, 3.3-400, 4.2-
100, 4.3-100, 4.4-100, 4.5-100, 4.6-100, in Pail IV below for specific standards.
D. Compliance with Parking and Ingress-Egress Standards: •
Pa;-king Areas and ingress-egress points have been designed to: Facilitate vehicular
traffic, bicycle and pedestrian safety to avoid congestion;provide connectivity within the
development area and to adjacent residential areas, transit stops, neighborhood activity
centers, and commercial, industrial, and public areas; minimize driveways on arterial
and collector streets as specified in this code or other applicable regulations and comply
with the ODOT access management standards for State Highways.
Findings: [To be provided for tentative submittal following completion of Transportation
Impact Study].
E. Protection of Physical Features:
Physical features, including, but not limited to: steep slopes with unstable soil or
geologic conditions; areas with susceptibility offlooding; significant clusters of trees and
shrubs; watercourses shown on the WQLW Map and their associated riparian areas;
wetlands;.rock outcroppings; open spaces; and areas of historic and/or" archaeologic
significance, as may be specified in Section 3.3-900 or ORS 97.740-760, 358.905-955,
and 390.235-240, shall be protected as specified in this Code or in State or Federal Law.
Findings: Physical features will not be impacted as a result of the proposed development.
Refer to findings under SDC 4.3-115 and 117, below, for further discussion.
V. COMPLIANCE WITH SPRINGFIELD DEVELOPMENT CODE
A. Section 3.2-300 - Commercial Zoning Districts
3.2.310 Schedule of Use Categories
. Findings: The development is not proposing new uses complying with the
"Permitted Use" category for the CC district. Existing uses subject to "Special
Development Standards" in the CC district, may continue to function at their
current location or within a relocated space within the main Mall building. Such
uses may include existing automobile repair garages, automobile rentals, and
arcades.
PRE-SUBMTfAL REC'D
Kim, 9 5 9012
/1- BALZHISER & HUBBARD ENGINEERS a _ PAGE7
•
Gateway Mall Redevelopment
Site Plan Review - Major Modification Pre-Application 11/15/13
3.2.315 Base Zone Development Standards
Findings: Compliance with Base Zone Development Standards is summarized as
follows:
Lot Size and Frontage: The proposed development will have no impact on
the lot size or street frontage.
Building Setback: The proposed development will maintain a minimum •
setback of 10' between front, side, and rear property lines and proposed
buildings. •
• Parking, Driveway, and Outdoor Storage Setback: The proposed
development will maintain a minimum setback distance of 5-feet between
the front, side, and rear property lines and adjacent parking lots or interior
access drives. Based on coordination with City staff, a sidewalk or shared
bicycle/pedestrian path may be placed between the interior Mall Ring
Road access drive and the north property line, resulting in a landscape
width of less than 5-feet.
Maximum Building Height: There is no restriction on building height for
the proposed development, as there are no structures proposed within 50'
of the MD district located to the east of the development site.
•
B. Section 3.3-200 - Drinking Water Protection Overlay District
3.3-220 Time of Travel Zones
Findings: The property is located within the 10-20 year time of travel zone
(TOTZ) as shown on the Site Assessment of Existing Conditions - Overall Plan
(Sheet C2.0).
3.3-225 Review
Findings: Per SDC 3.3-225(A)(2)(a) and (b), a Drinking Water Protection (DWP)
Overlay District Development Application is required when there is a change in
use that affects storage, use, and/or production of hazardous materials that pose a
risk to groundwater or there is an increase in quantity of hazardous or other
materials that pose a risk to groundwater that are stored, used, and/or produced.
Based on coordination with City staff and Springfield Utility Board (SUB), all
Mall tenants impacted by the proposed development will be required to submit a
DWP application exemption request and tenants with impacts to hazardous
materials use will be required to submit either a DWP application or exemption
request, whichever applies. Since the nature of operations of potential Mall
tenants have not been fully determined at this time, City staff and SUB have
agreed to defer submittal of the DWP application or exemption request to a time
after SPR Modification application, but prior to building occupancy. DWP
applications and/or exemption requests will be consistent with project phasing.
NOV 2 5 2Q13 PAGES
�� BALZHISER & HUBBARD ENGINEERS
• •
Gateway Mall Redevelopment
Site Plan Review - Major Modification Pre-Application 11/15/13
3.3-235 Standards for Hazardous Materials within Time of Travel Zones
Findings: Applicable standards will be addressed on a case-by-case (tenant-by-
tenant) basis at the time of DWP application and/or exemption request.
C. Section 3.3-400 Floodplain Overlay District
3.3-410 Applicability
Findings: The Floodplain (FP) Overlay District applies to all areas of special
flood hazard. Federal Emergency Management Agency(FEMA) Flood Insurance
Rate Map (FIRM) No. 41 039C 1 1 33F lists the site as "Zone X" which is outside of
the 500-year floodplain, and not within a special flood hazard area.
D. Section 4.2-100 - Infrastructure Standards - Transportation
4.2-105 Public Streets
Findings: Since the proposed development does not include any new public
streets, the design standards stipulated in SDC 4.2-105 generally do not apply.
However, based on coordination with City staff(refer to 09/04/13 Traffic Impact
Study Scope of Work letter by City staff), a "major traffic study" will be required
in accordance with SDC 4.2-105(A)(4). The completed Traffic Impact Study
(TIS) is attached as Appendix "A" [TIS to be included for tentative application
submittal].
4.2-110 Private Streets
Findings: No new private streets are proposed with the development; therefore
this section does not apply. Per SDC 6.1-110, a Private Street is defined as a road
that is "functionally similar to a public street" and a Driveway is defined as a
"vehicular access that provides a connection between a structure or parking area
on private property and the public street system." The existing Mall ring road,
north access road, and south access road are understood to meet the definition of
Driveway and not Private Street.
4.2-115 Block Length •
Findings: The proposed development will not impact the alignment of any
existing public or private streets, nor are any new public or private streets
proposed. Therefore, this section does not apply.
4.2-120 Site Access and Driveways
Findings: Vehicular access to the site is currently provided to the site by four
primary access points. The access points are shown on the Site Plan - Overall
drawing(sheet C3.0) and summarized as follows:
Gateway Loop: Access provided through south terminus of Gateway
Loop, where it intersects the Mall Ring Road.
PRE-SUBIVIITAI REC'D
NOV 2 5 2013
�� BALZHISER & HUBBARD ENGINEERS PAGE9
Gateway Mall Redevelopment
Site Plan Review - Major Modification Pre-Application 11/15/13
Gateway Street - North Mall Access: Access provided at the signalized
intersection located at the north Mall Access Road.
Gateway Street - South Mall Access: Access provided at the signalized
intersection located at the south Mall Access Road.
Beverly Street: Access is provided from the north terminus of Beverly
Street, where it intersects the Mall Ring Road. Access to Beverly Street is
provided at signalized intersection at Beverly Street and Harlow Road.
Secondary access is provided by a connection to the US Postal Service Parking
Lot at the northeast corner of the site.
The proposed development will not add or remove any site access points or
driveways; therefore the standards of this section for new access points and
driveways do not apply. However, in accordance with SDC 4.2-120(B) and (C),
the proposed development will incorporate off-street improvements that minimize
traffic conflicts and will allow safe vehicular ingress and egress. Refer to the TIS
provided in Exhibit A [TIS to be included for tentative application submittal] for
additional information.
4.2-125 Intersections
Findings: The development will not add or remove any public intersections.
However, in accordance with the 09/04/13 Traffic Impact Study Scope of Work
letter by City staff, the TIS includes an evaluation and recommendations for
specific intersections identified by City staff. The completed TIS is attached as
Exhibit A [TIS to be included for tentative application submittal].
4.2-130 Vision Clearance
Findings: The proposed development will not be constructing new streets or new
access points to existing streets; therefore the requirements of this section are not
applicable.
4.2-135 Sidewalks
Findings: The development will not include new sidewalks within the public
right-of-way; therefore this section is not applicable.
4.2-140 Street Trees
Findings: The proposed development will not construct new public roadways or
impact existing street trees within the right of way; therefore this section is not
applicable.
4.2-145 Street Lighting
Findings: The proposed development will not construct new public roadways or
impact existing public street lighting; therefore this section is not applicable.
I M.'uuwvIr In KivlLJ
�%��J NOV 2 5 2013 PAGE 10
BALZHISER & HUBBARD ENGINEERS
• •
Gateway Mall Redevelopment
Site Plan Review - Major Modification Pre-Application 11/15/13
4.2-150 Bikeways
Findings: Refer to the findings for SDC 4.2-160 below.
4.2-155 Pedestrian Trails
Findings: Refer to the findings for SDC 4.2-160 below.
4.2-160 Accessways
Findings: City staff has requested improvements to the existing development site
to improve pedestrian and bicycle connectivity between the existing ODOT
bike/pedestrian bridge (located near the northwest corner of the site) and Oakdale
Street (located immediately east of the LTD Bus Station). Since this
improvement would constitute a retrofit improvement to an existing fully
developed site, City staff is allowing flexibility in the prescriptive standards of
SDC 4.2-160. The followings a summary of the proposed design criteria.
Connection Route and Alignment: [Subject to change - to be completed
for Tentative Application].
Width of Bike and Pedestrian Routes: [Subject to change - to be
completed for Tentative Application].
Lighting: The proposed bike/pedestrian connection will utilize existing
lighting currently in place.
Access Easements: The proposed bike/pedestrian path will not be
required to dedicate right-of-way to the public. Based on coordination
with City staff, public access will be guaranteed through the final
development agreement and/or an access easement.
E. Section 4.3-100 - Infrastructure Standards - Utilities
4.3-105 Sanitary Sewers
Findings: Sanitary sewer service for the development will be provided by two
existing private 8" laterals which drain to the existing 18" public sanitary sewer in
Gateway Street. Since the proposed development consists of redevelopment, the
proposed improvements are not expected to have an adverse impact on existing
private or public sanitary sewer systems. However, capacity of the existing
private laterals will be verified prior during the building permit application.
4.3-110 Stormwater Management
Findings: Stormwater runoff from the majority of existing development site is
collected through an existing closed-pipe system, draining to an existing public
open channel located along the west perimeter of the site. In addition to the
closed-pipe drainage system, a large area of existing parking lot along the western
edge of the property drains into the open channel through a series of curb
fErti(�11nq,ITTAf nrr1�
ki. Wn ing'I, 11 •• i.e
5 2013 PAGE 11
I� BALZHISER Sc HUBBARD ENGINEERS
NOV .2
:I1/
Gateway Mall Redevelopment
Site Plan Review - Major Modification Pre-Application 11/15/13
openings. The public open channel drains in a north to south direction and
receives storm drainage from both public and private outfalls. Refer to findings
for SDC 4.3-115 below for further discussion on Wetlands and Water Quality
Limited Watercourse designation.
Stonnwater Quantity: The proposed development will be reducing the
overall impervious surface within the project limits, and will therefore
reduce the overall stormwater runoff generated from the development site.
City stormwater staff has indicated the existing receiving public
stonnwater collection system is not deficient and does not need to be
analyzed as part of the development. The private stonnwater collection
system is generally oversized, with 48" and 36" mains extending around
the perimeter of the site. City stormwater staff has advised that an
analysis of the private storm drainage system will not be required as part
of the SPRMM application.
Stonnwater Treatment: The proposed development will include vegetated
stonnwater and mechanical stormwater treatment improvements. The
proposed vegetated treatment improvements will include vegetated
planters located at low-points within the proposed parking lot areas.
These planters will receive drainage from approximately 38% (172,410
square feet) of the total non-building roof area within the project limits.
This area represents approximately 50% of the total vehicular non-
building roof area. In areas where parking lot drainage is not directed to
vegetated treatment facilities, runoff from new pavement surfaces will be
directed to double-chamber catch basins. The proposed stonnwater
treatment facilities have been coordinated with City stonnwater staff and
have been determined to meet the intent of the City's stonnwater quality
standards presented in Chapter 3 of the Engineering Design Standards and
Procedures Manual (EDSP).
Stonnwater Point Source Pollution Control: The proposed development
will comply with the standards of EDSP 3.02.4.A for point source
pollution control. The proposed development will include new Material
Transfer Areas (Loading Docks) and Solid Waste Storage Areas (Trash
Enclosures) that will be regulated under this standard. Newly proposed
loading docks and trash enclosures will be covered, hydraulically isolated,
and equipped with a drain to the sanitary sewer system.
Stormwater Management Documentation: City Stonnwater staff has
advised that stonnwater management calculations and supporting
documentation will not be required as part of the SPRMM application
package. Additional documentation may be required during the building
permit application phase.
PRE-SUBMIT!AI. REC'D
r
NOV 2 2812
,1 n
, BALZHISER & HUBBARD ENGINEERS - - ____- PAGE 12
•
•
Gateway Mall Redevelopment
Site Plan Review -Major Modification Pre-Application 11/15/13
4.3-115, 4.3-117 Water Quality Protection, Natural Resource Protection Areas
Findings: The open channel located along the west perimeter of the property is
classified as a Water Quality Limited Watercourse (WQLW) and is also an Army
Corps of Engineers wetland mitigation site. The current project does not propose
any site or building development within the vicinity of the existing WQLW.
However, City of Springfield Stornwater and Environmental staff have requested
limited enhancements to the existing wetlands area to improve water quality,
wetlands function, risk to nearby electrical transmission lines, and improve
appearance. The proposed improvements are summarized as follows:
Removal of Blackberries: Remove invasive blackberries within wetlands
area.
Removal of Large Trees: Remove large trees to comply with Pacific
Power easement requirements to limit tree height under and adjacent to
transmission lines. City staff has also advised that many of the larger trees
are Cottonwoods, which present a falling hazard.
Replace Trees with Improved Vegetation: Plant low-height Willow trees
to in place of the large trees removed.
Improve Surface Flow Entrances: Enhance the rock-lined flow entrances
along the east edge of the open channel, where parking lot drainage enters
the channel through curb openings at nine different locations.
City Staff has requested that the developer consider additional "in-channel"
wetlands enhancements that would trigger an Army Corps of Engineers and
Department of State Lands joint permit application. Due to the potential
complexity of such a permitting process, City staff has advised that any additional
wetlands enhancement triggering a joint permit application be addressed under a
separate process from the SPRMM process.
It is understood that the proposed improvements requested by City staff will
constitute "permitted uses" per SDC 4.3-100(B) and SDC 4.3-117(E). It is
anticipated that any enhancements to the wetlands area will generally comply
with the standards of SDC 4.3-100(C) and SDC 4.3-117(H).
4.3-120 Utility Provider Coordination
Findings: Per SDC 4.3-120, utility installations will be coordinated with the
serving utility provider and the developer will be responsible for the design,
installation, and cost of utility improvements.
4.3-125 Underground Placement of Utilities
Findings: Overhead utilities are not proposed for this development.
4.3-130 Water Service and Fire Protection
Findings: The existing public (Springfield Utility Board-owned) water
distribution system throughout the site has adequate capacity to meet the fire
k-J�1 (VIII
Ai Ka. Li
NOV 2 ?.
BALZHISER & HUBBARD ENGINEERS 2013 PAGE 13
Gateway Mall Redevelopment
Site Plan Review -Major Modification Pre-Application 11/15/13
protection and domestic water demands for the site. The proposed site fire
protection system has been reviewed with the Fire Marshal's office. Further
review of building fire protection systems will be deferred to the building permit
phase.
4.3-135 Major Electrical Power Transmission Lines
Findings: No modifications to major electrical power transmission lines are
anticipated; therefore this section does not apply.
4.3-140 Public Easements
Findings: Utility easements will be provided for public water and electrical
systems, as required by SUB. Easement dimensions and descriptions will be
coordinated with SUB and will be dedicated/conveyed prior to final acceptance.
4.3-145 Wireless Telecommunications System (WTS) Facilities
Findings: The proposed development does not include construction of a new
WTS facility. Therefore, this section does not apply.
F. Section 4.4 - Landscaping, Screening and Fence Standards
4.4-105 Landscaping
Findings: [To be included in the tentative submittal].
4.4-110 Screening
Findings: Structural screening walls are proposed for all proposed loading areas,
self-contained trash compactors and trash enclosures throughout the site, with the
exception of one area on the west side of the Mall. This area is recessed inside
the building such that the open side on the west is required to allow access to the
loading docks and trash compactors. All structural screen walls will be
constructed of non-metallic materials and will be colored to match surrounding
vegetation.
4.4-115 Fences
Findings: Proposed fencing for screening and other purposed will not exceed 6' in
height per table 4.4-1. Therefore, a separate construction permit will not be
required. Additionally, review under Discretionary Use procedure is not
warranted.
G. Section 4.5-100 - On-Site Lighting Standards
4.5-110 Illumination and Height
Findings: To the maximum extent practical, the existing lighting fixtures and
poles currently in use throughout the site will be salvaged and reused in areas of
redevelopment to provide continuity with the undisturbed portions of the site.
Where new lighting fixtures are required, the fixtures will be shielded and the
PRE-SUbIViIT KEC 1
BALZHISER & HUBBARD ENGINEERS NOV 2 5 2013 PAGE 14
-a/
• •
Gateway Mall Redevelopment
Site Plan Review - Major Modification Pre-Application 11/15/13
height will be 25' or less than the principal permitted structure, whichever is
shorter. Refer to the Electrical drawings (sheets El and E2) for proposed lighting
locations and configurations. Refer to Exhibit E for information on the existing
lighting fixtures and poles.
H. Section 4.6-100 - Vehicle Parking, Loading and Bicycle Parking Standards
4.6-110 Vehicle Parking - General
Findings: As allowed under SDC 4.6-110(A)(3), the proposed development seeks
to reduce the number of required parking spaces required under SDC 4.6-125
based on the following criteria:
Parking Study: A parking study has been included in the attached TIS
(see Exhibit A) in accordance with SDC SDC 4.6-110(A)(3)(a) [to be
completed for tentative application].
Space Constraints: The proposed development will be allocating space
throughout the site to meet development standards for landscaping,
pedestrian and bicycle access improvements,-accessible parking, and off-
street loading areas. Due to the space occupied by these facilities, it is not
possible to achieve the standard number of parking spaces within the site
the development site.
4.6-115 Vehicle Parking - Parking Lot Design
Findings: All parking spaces, aisle widths, striping, wheel stops, and bumper
overhangs comply with the dimensional requirements of SDC 4.6-115. Refer to
the Site Plan drawings (the C3 series sheets) for typical parking stall dimensions
and aisle widths for the proposed redevelopment. Less than 30% of the parking
spaces will be compact and the accessible parking and accessible routes conform
to section 1104 of the Structural Specialty Code. A parking space tabulation can
be found in a table on the Site Plan - Overall drawing (sheet C3.0).
4.6-120 Vehicle Parking - Parking Lot Improvements
Findings: [To be included in the tentative submittal].
4.6-125 Vehicle Parking- Parking Space Requirements
Findings: Refer to findings under SDC 4.6-100 [To be included in the tentative
submittal].
4.6-135 Loading Areas - Facility Design and Improvements
Findings: All proposed loading areas meet the dimensional requirements of SDC
4.6-125 and are located such that they do not protrude into sidewalks and
accessible routes. Refer to the Site Plan drawings (the C3 series sheets) and
Architectural Elevations [to be included in the tentative submittal] for the
proposed locations and configurations of loading areas.
pRF.S110111u A PFC'D
NOV 2 5 2013
BALZHISER & HUBBARD ENGINEERS PAGE 15
Gateway Mall Redevelopment
Site Plan Review - Major Modification Pre-Application 11/15/13
4.6-145 Bicycle Parking- Facility Design
Findings: All proposed bicycle parking facilities will meet the clearance and
dimensional standards of SDC 4.6-145. All new long-term bicycle parking racks
will be covered and all new or replaced spaces will be accessible.
4.6-150 Bicycle Parking - Facility Improvements
Findings: New or replaced bicycle parking racks will consist of hitching posts or
staple racks that are separated from vehicular parking and pedestrian routes and
installed in locations that are obvious to Mall patrons. No bicycle parking spaces
are proposed within the Mall buildings. Refer to the Site Plan drawings (the C3
series drawings) for proposed bicycle parking facility locations and
configurations.
4.6-155 Bicycle Parking- Number of Spaces Required
Findings: During the DIM on September 26, 2013, city staff confirmed that the
number of bicycle parking spaces at the existing Mall was sufficient. As part of
this redevelopment, all bicycle parking spaces that are impacted will be replaced
with hitching post or staple racks (which is the City's preferred type of rack).
Additionally, the number of bicycle parking spaces throughout the site will be
increased proportionally to the increase in overall retail space added as part of this
redevelopment. This increase will be at a rate of 1 per 3,000 square feet of retail
floor area per SDC 4.6-155 (shopping centers and malls).
I. Section 5.17-100 - Site Plan Review
5.17-115 Phased Development
Findings: [To be provided for tentative application submittal].
5.17-120 Submittal Requirements
Findings: The Site Plan Major Modification application has been prepared by an
Oregon licensed Civil Engineer. Compliance with the submittal requirements of
this section are explained below:
A. The information required by SDC 5.17-120(A) is contained within the Site
Plan drawings (the C3 series sheets) with the exception of Requirements 8
and 9, which is contained in the findings for SDC 3.2-300 in this
document and in the Architectural Elevations [to be included for the
. tentative submittal] respectively. All submitted drawings have an
appropriate scale (per requirement 1). The proposed number of employees
is [to be included for tentative application submittal] and included in
• the Site Plan - Overall drawing (sheet C3.0) to satisfy Requirement 6.
B. The information required by SDC 5.17-120(B) is contained within the
Assessment of Existing Conditions drawings (the C2 series sheets).
C. The information required by SDC 5.17-120(C) is contained within the Site
Plan drawings (the C3 series sheets) with the exception of Requirement 4
PPF-SIIRRAI1TA! ppm)
Nov 2 5 2013
-41P2' BALZHISER & HUBBARD ENGINEERS PAGE 16
• •
• Gateway Mall Redevelopment •
Site Plan Review - Major Modification Pre-Application 11/15/13
which is contained in the Electrical drawings (sheets El and E2).
Requirement 9 does not apply as no Right-of-way Approach Permit is
required. A Traffic Impact Analysis will be included with the tentative
submittal that will satisfy Requirement 10.
D. The information required by SDC 5.17-120(D) is contained within the
• Landscape and Planting drawings [to be included in the tentative
submittal].
E. The information required by SDC 5.17-120(E) is contained within the Site
Plan drawings (the C3 series sheets) with the exception of Requirement 4.
Information satisfying Requirement 4 is contained within the Storm Drain
Plan drawings (the C5 series sheets) and the Sanitary Sewer, Water, and
Gas drawings (the C6 series sheets).
F. The information required by SDC 5.17-120(F) is contained within the
Storm Drain Plan drawings (the C5 series sheets) with the exception of
Requirement 4, which is satisfied by the Grading Plan drawings (the C4
series sheets). Refer to the findings for SDC 4.3-110 in this document for
additional information on stonmwater system capacity calculations.
G. The information required by SDC 5.17-120(G) [will be included with the
tentative submittal].
H. The information required by SDC 5.17-120(H) is contained within the
Electrical drawings (sheets El and E2) and in Exhibits E and F of this
document.
I. The information required by SDC 5.17-1200) is contained within the
application as follows:
o Requirement 1. The required narrative description can be found in
Part I of this document.
o Requirement 2. The owner has signed the application.
o Requirement 3. The vicinity map can be found on the Cover Sheet
drawing (sheet C1.0). Additional information can be found on the
Site Plan - Overall drawing (sheet C3.0)
o Requirement 4. Refer to the findings for SDC 3.3-200 in this
document.
o Requirement 5. No discretionary uses are planned for this site.
o Requirement 6. A Tree Felling Permit will be included in the
tentative submittal.
o Requirement 7. No Annexation application is required for this
redevelopment.
o Requirement 8. Refer to the findings for SDC 4.3-117 in this
document.
o Requirement 9. Refer to the findings for SDC 4.3-117 in this
document.
o Requirement 10. As coordinated with City Planning staff, a
Geotechnical Report will not be required for the Site Plan Review
Major Modification Application.
P:32 1 00-024 1 3\Site Review Major Modification\rep dwlgtl 131115 Major Modification Written Statewent.dOCx
pflE.eilRp_AlflAI i�xr'n iii
�� NOV 2 5 2013
I/a BALZHISER & HUBBARD ENGINEERS PAGE 17
Gateway Mall Redevelopment
Site Plan Review - Major Modification Pre-Application 11/15/13
VI. EXHIBITS
A. Exhibit A: TIS and Parking Study
[To be included in tentative submittal.]
PRE-SUBWI TAL REC'D
NOV 252013
rBALZHISER & HUBBARD ENGINEERS PAGE IS
I1/
• •
Gateway Mall Redevelopment
Site Plan Review - Major Modification Pre-Application 11/15/13
B. Exhibit B: Deed and Title Report
PRE-SUBMITTAL REC'D
NOV 2 5 7013
��
BALZHISER & HUBBARD ENGINEERS PAGE 19
I1/
• • •
FirstAmerican Title Company of Oregon
•• ��* 600 Country Club Road
First American Eugene,OR 97401
Phn-(541)484-2900
Fax-(877)783-9167
LANE COUNTY TITLE UNIT
FAX (877)783-9167
Title Officer: Jan Anderson
(541)484-2900
jananderson@firstam.com
• LOT BOOK REPORT
Balzhiser & Hubbard Engineers Order No.: 7199-2177595
100 W 13th Avenue November 15, 2013
Eugene, OR 97401-3433
Attn: Geoff Larsen
Phone No.: (541)686-8478 - Fax No.: (541)345-5303
Email: jlarsen @bhengineers.com
Re:
Fee: $500.00
We have searched our Tract Indices as to the following described property:
The land referred to in this report is described in Exhibit A attached hereto.
and as of November 06, 2013 at 8:00 a.m.
We find that the last deed of record runs to
GGP-Gateway Mall, L.L.C., a Delaware limited liability company, formerly known as Gateway Mall
Partners, a South Dakota general partnership (formerly known as Gateway Mall Limited Partnership, a
South Dakota limited partnership) as to Parcel I and
Dayton Hudson Corporation, a Minnesota Corporation, as to Parcel II
We find the following apparent encumbrances within ten (10) years prior to the effective date hereof:
1. Easement, including terms and provisions contained therein:
Recording Information: June 23, 1926 in Book 148, Page 569, Deed Records of Lane
County, Oregon
In Favor of: Mountain States Power Company
For: Electric transmission lines and/or electric distribution system
PRE-SUBMITTAL RECD
NOV 252013
• First American Title
• • •
Lot Book Service • Guarantee No.:7199-2177595
Page 2 of 18
2. Easement, including terms and provisions contained therein:
Recording Information: June 23, 1926 in Book 148, Page 571, Deed Records of Lane
County, Oregon
In Favor of: Mountain States Power Company
For: Electric transmission lines and/or electric distribution system
3. Easement, including terms and provisions contained therein:
Recording Information: November 4, 1936 in Book 189, Page 24, Deed Records of Lane
County, Oregon
In Favor of: Eugene-Springfield Land,&Water Company
For: Irrigation ditches and canals
4. Easement, including terms and provisions contained therein:
Recording Information: October 16, 1946 in Book 333, Page 637, Deed Records of Lane
County, Oregon
In Favor of: Mountain States Power Company •
For: Electric power lines
5. Limited access provisions contained in Deed to the State of Oregon, by and through its State
Highway Commission recorded June 28, 1957, Reception No. 16055, Deed Records of Lane
County, Oregon, which provides that no right of easement or right of access to, from or across
the State Highway other than expressly therein provided for shall attach to the abutting property.
6. Limited access provisions contained in Deed to the State of Oregon, by and through its State
Highway Commission recorded May 15, 1958, Reception No. 38851, Deed Records of Lane
County, Oregon, which provides that no right of easement or right of access to, from or across
the State Highway other than expressly therein provided for shall attach to the abutting property.
7. Easement, including terms and provisions contained therein:
Recording Information: October 30, 1959, Reception No. 82151, Deed Records of Lane
County, Oregon
In Favor of: Eugene Water & Electric Board
For: Electric power, telephone and telegraph equipment, lines and
poles
8. Easement, including terms and provisions contained therein:
Recording Information: November 3, 1959, Reception No. 82428, Deed Records of Lane
County, Oregon
In Favor of: Eugene Water & Electric Board
For: Electric power, telephone and telegraph equipment, lines and
poles
9. Easement, including terms and provisions contained therein:
Recording Information: February 21, 1962, Reception No. 60269
In Favor of: Pacific Power & Ught Company
For: Electric transmission and distribution fines
PRE-SUBMITTAL REC'D
NOV 252.013
First American Title
• •
Lot Book Service Guarantee No.:7199-2177595
Page 3 of 18
10. Easement, including terms and provisions contained therein:
Recording Information: February 21, 1962, Reception No. 60270, Deed Records of Lane
County, Oregon
In Favor of: Pacific Power & Light Company
For: Electric transmission and distribution lines
11. Easement, including terms and provisions contained therein:
Recording Information: May 21, 1962, Reception No. 70248
In Favor of: Pacific Power& Light Company
For: Electric transmission and distribution lines
12. Easement, including terms and provisions contained therein:
Recording Information: May 21, 1962, Reception No. 70248
In Favor of: McKenzie Water Control District
For: Floodway and ditches
13. Easement, including terms and provisions contained therein:
Recording Information: September 24, 1976, Reception No. 76-50098
In Favor of: City of Springfield
For: Drainage purposes
14. Easement, including terms and provisions contained therein:
Recording Information: September 24, 1976, Reception No. 76-50099
In Favor of: City of Springfield
For: Drainage purposes
15. Easement, including terms and provisions contained therein:
Recording Information: February 08, 1980, Reception No. 80-07062
In Favor of: City of Springfield
For: Public utilities
16. Disposition and Development Agreement and the terms and conditions thereof:
Between: The City of Springfield
And: Gateway Mall Limited Partnership
Recording Information: October 21, 1988, Reception No. 88-44251, Official Records of
Lane County, Oregon
Modification and/or amendment by instrument:
Recording Information: March 13, 1990, Reception No. 90-11886 and February 11,
1998, Reception No. 98-09140, Official Records of Lane County,
Oregon
17. Waiver, Consent to Pay Assessment, Agreement to Pay Certain Improvement Costs, and
Agreement for Provision of Surety including the terms and provisions thereof:
Recorded: October 21, 1988, Reception No. 88-44252, Official Records of
Lane County, Oregon R
Executed by: Gateway Mall Limited Partnership PRE-SUBMIHAL RECD
FirstAmerican Title NOV 2 5 Z013
• •
Lot Book Service Guarantee No.: 7199-2177595
Page 4 of 18
18. Easement, including terms and provisions contained therein:
Recording Information: September 28, 1989, Reception No. 89-43900
In Favor of: Eugene Water & Electric Board
For: Underground electric distribution line
•
19. Easement, including terms and provisions contained therein:
Recording Information: February 23, 1990, Reception No. 90-08986, Official Records of
Lane County, Oregon
In Favor of: Rainbow Water Fire District
For: Underground water line
20. Easement, including terms and provisions contained therein:
Recording Information: March 8, 1990, Reception No. 90-11195, Official Records of
Lane County, Oregon
In Favor of: City of Springfield
For: Storm sewer line and traffic signal devices
21. Construction, Operation and Reciprocal Easement Agreement, including terms and provisions
thereof.
Recorded: March 13, 1990, Reception No. 90-11883, Official Records of
Lane County, Oregon
Modification and/or amendment by instrument: •
Recording Information: June 13, 2003, Instrument No. 2003-053669, Official Records of
Lane County, Oregon
Modification and/or amendment by instrument:
Recording Information: October 29, 2013 as Instrument No. 2013-056807
22. Unrecorded Separate Agreement and the terms and conditions thereof:
Between: Gateway Mall Limited Partnership
And: Dayton-Hudson Corporation (Target), as disclosed by
memorandum thereof
Recording Information: March 13, 1990, Reception No. 90-11884, Official Records of
Lane County, Oregon
23. Lease and the terms and conditions thereof:
Lessor: Gateway Mall Limited Partnership
Lessee: Sears Roebuck and Co.
As disclosed by: Memorandum of Lease
Recorded: April 9, 1990
Recording No.: Reception No. 90-16157, Official Records of Lane County,
Oregon
(Affects a portion)
The present ownership of the leasehold created by said lease and other matters affecting the
interest of the lessee are not shown herein.
PRE-SUBMITTAL REC'D
First American Title NOV 2 5 2013
• •
Lot Book Service Guarantee No.:7199-2177595
Page 5 of 18
24. Lease and the terms and conditions thereof:
Lessor: Gateway Mall Limited Partnership
Lessee: Cinemark USA, Inc.
As disclosed by: Memorandum of Lease
Recorded: April 30, 1990
Recording No.: Reception No. 90-19811, Official Records of Lane County,
Oregon
(Affects a portion)
The present ownership of the leasehold created by said lease and other matters affecting the
interest of the lessee are not shown herein.
25. Lease and the terms and conditions thereof:
Lessor: Gateway Mall Partners
Lessee: United Merchandising Corp.
As disclosed by: Memorandum of Lease
Recorded: April 11, 1995
Recording No.: Reception No. 95-19998, Official Records of Lane County,
Oregon
(Affects a portion)
The present ownership of the leasehold created by said lease and other matters affecting the
interest of the lessee are not shown herein.
26. Easement, including terms and provisions contained therein:
Recording Information: June 18, 1996, Reception No. 96-40795, Official Records of Lane
County, Oregon
In Favor of: Springfield Utility Board
For: Utility purposes
27. City of Springfield Improvement Agreement and Application for Sewer Hookup, including terms
and provisions thereof.
Recorded: June 20, 1996, Reception No. 96-41612
28. Lease and the terms and conditions thereof:
Lessor: Gateway Mall Partners
Lessee: Circuit City Stores West Coast, Inc.
As disclosed by: Memorandum of Lease
Recorded: July 18, 1996
Recording No.: Reception No. 96-48486, Official Records of Lane County,
Oregon
(Affects a portion)
The present ownership of the leasehold created by said lease and other matters affecting the
interest of the lessee are not shown herein.
PRE-SUBMITTAL REC'D
NOV 2 5. 2013
First American Title
• •
Lot Book Service Guarantee No.:7199-2177595
Page 6 of 18
29. Easement, including terms and provisions contained therein:
Recording Information: October 30, 1996, Reception No. 96-73241, Official Records of
Lane County, Oregon
In Favor of: Springfield Utility Board
For: Utilities
30. Lease and the terms and conditions thereof:
Lessor: Gateway Mall Partners
Lessee: Cottonwood Hospitality, Inc.
As disclosed by: Deed of Trust
Recorded: November 19, 1996
Recording No.: Reception No. 96-77666, Official Records of Lane County,
Oregon
As disclosed by: Deed in Lieu of Foreclosure
Recorded: July 1, 1998
Recording No.: Reception No. 98-51716, Official Records of Lane County,
Oregon
(Affects a portion)
The present ownership of the leasehold created by said lease and other matters affecting the
interest of the lessee are not shown herein.
31. Easement, including terms and provisions contained therein:
Recording Information: September 26, 1997, Reception No. 97-65399, Official Records
of Lane County, Oregon
In Favor of: City of Springfield
For: Public utilities
32.• Right of First Refusal, including the terms and provisions thereof, in favor of Valley River Center,
LLC, an Oregon limited liability company, as disclosed by a Memorandum thereof, recorded
September 17, 1998, Reception No. 98-74492, Official Records of Lane County, Oregon.
Certificate of Expiration of Right of First Refusal, including the terms and provisions thereof:
Recording Information: October 5, 2010, Instrument No. 2010-050091
33. Unrecorded Management Agreement, including the terms and provisions thereof, by and between
General Growth Management, Inc., a Delaware corporation and their affiliate Gateway Mall
Partners, a South Dakota partnership, and Valley River Center, LLC, an Oregon limited liability
company, as disclosed by a Memorandum of Right of First Refusal, recorded September 17,
1998, Reception No. 98-74492, Official Records of Lane County, Oregon.
34. Interest of JCI( Restaurants, Inc., and parties claiming thereunder, as disclosed by Financing
Statement recorded May 11, 1999, Reception No. 99-042565, Official Records of Lane County,
Oregon.
35. Lease and the terms and conditions thereof as disclosed by Memorandum of Lease.
Lessor: Gateway Mall Partners
Lessee: Cinemark USA, Inc., a Texas corporation
Dated: November 25, 1997 PRE-SUBMI IAI REC 0
Recorded: September 07, 1999 NOV 2 5 2013
First American Title
• •
Lot Book Service Guarantee No.: 7199-2177595
Page 7 of 18
Recording Information: 99-077472, Official Records of Lane County, Oregon
(Affects a portion)
The present ownership of the leasehold created by said lease and other matters affecting the
interest of the lessee are not shown herein.
36. Lease and the terms and conditions thereof as disclosed by Memorandum of Lease.
Lessor: GGP - Gateway Mall, L.L.C., a Delaware limited liability
company
Lessee: Ross Stores, Inc., a Delaware corporation
Dated: August 13, 2001.
Recorded: October 15, 2001'
Recording Information: 2001-068117, Official Records of Lane County, Oregon
(Affects a portion)
• The present ownership of the leasehold created by said lease and other matters affecting the
interest of the lessee are not shown herein:
37. Easement, including terms and provisions contained therein:.
Recording Information: November 16, 2001, Reception No. 2001-076670, Official
Records of Lane County, Oregon
In Favor of: City of Springfield, acting by and through its Springfield Utility
Board
For: utility
38. Lease and the terms and conditions thereof as disclosed by Memorandum of Lease.
Lessor: GGP - Gateway Mall, L.L.C., a Delaware limited liability
company
Lessee: RCI Realty, LLC, a Georgia limited liability company
Dated: December 31, 2001
Recorded: March 01, 2002
Recording Information: 2002-016301;Official Records of Lane County, Oregon
(Affects a portion)
An assignment of the Lessee's interest in said lease was
Executed By: Amrest, LLC, a Delaware limited liability company
To: Apple Oregon, LLC, a Delaware limited liability company
Dated: October 10, 2012
Recorded: October 16, 2012
Recording Information: Instrument No. 2012-053095
The present ownership of the leasehold created by said lease and other matters affecting the
interest of the lessee are not shown herein.
39. Financing Statement, indicating a Security Agreement
Debtor: Restaurant Concepts II, LLC
Secured Party: Fleet Business Credit, LLC PRE-SUBMITTAL RECD
Recorded: April 30, 2002 I
Recording Information: 2002-033811, Official Records of Lane County, OregoRoy 2 5 ?Q13
•
first American Title
• •
lot Book Service Guarantee No.:7199-2177595
Page 8 of 18
•
(Affects a portion)
A Notice of Continuation of said Financing Statement was recorded November 17, 2006,
Instrument No. 2006-083070, Official Records of Lane County, Oregon.
Modification and/or amendment by instrument:
Recording Information: November 17, 2006, Instrument No. 2006-083071, Official
Records of Lane County, Oregon
Modification and/or amendment by instrument:
Recording Information: April 25, 2007, Instrument No. 2007-027554, Official Records of
Lane County, Oregon
40. The right, title and interest, if any, of Restaurant Concepts II, LLC, as disclosed by Financing
Statement recorded April 30, 2002, as Reception No. 2002-033811, Official Records of Lane
County, Oregon.
41. Easement, including terms and provisions contained therein:
Recording Information: June 04, 2002 as Instrument No. 2002-042936
In Favor of: City of Springfield, a municipal corporation, acting by and
through its Springfield Utility Board
For: utilities
42. Lease and the terms and conditions thereof as disclosed by Memorandum of Lease.
Lessor: GGP-Gateway Mall L.L.C., formerly known as Gateway Mall
Partners, a South Dakota general partnership
Lessee: OCB Restaurant Co., a Minnesota corporation, as successor by
merger to OCB Realty Co.
Term: 5 years
Dated: June 06, 2003
Recorded: June 13, 2003
Recording Information: 2003-053841
(Affects a portion)
The present ownership of the leasehold created by said lease and other matters affecting the
interest of the lessee are not shown herein.
The assignment of Lessee's interest under the lease.
Assigned By: OCB Restaurant Co., a Minnesota corporation, as successor by
merger to OCB Realty Co.
Assigned To: ORGS LLC, a Delaware limited liability company
Dated: June 06, 2003
Recorded: June 13, 2003
•
Recording No.: 2003-053842
(Affects a portion)
The present ownership of the leasehold created by said lease and other matters affecting the
interest of the lessee are not shown herein.
IRE-SUBMIITTAI, RECD
NOV
First American Title 't'' 5 2013
• •
Lot Book Service Guarantee No.: 7199-2177595
Page 9 of 18
43. The effect of a Grant Deed from OCB Restaurant Co., grantor to ORG5 LLC, grantee, conveying
improvements on a portion of said land, recorded June 13, 2003, Reception No. 2003-053843,
Official Records of Lane County, Oregon.
44. Subordination, Non-Disturbance and Attornment Agreement, including terms and provisions
thereof.
Recorded: June 13, 2003 as Instrument No. 2003-053844
45. Leasehold Deed of Trust and Assignment of Rents:
Grantor: ORGS LLC, a Delaware limited liability company
Trustee: Lawyers Title Insurance Company
Beneficiary: Wells Fargo Bank, National Association
Amount: $12,290,996.00
Dated: June 06, 2003
Recorded: June 13, 2003
Recording No.: 2003-053845
(Affects the Leasehold interest)
Modification and/or amendment by instrument:
Recording Information: July 24, 2012 as Instrument No. 2012-037097
Modification and/or amendment by instrument:
Recording Information: May 07, 2013 as Instrument No. 2013-024624
46. Assignment of leases and/or rents and the terms and conditions thereof:
Assignor: ORGS LLC, a Delaware limited liability company
Assignee: Wells Fargo Bank, National Association
Recorded: June 13, 2003
Recording Information: 2003-053846
Modification and/or amendment by instrument:
Recording Information: July 24, 2012 as Instrument No. 2012-037098 and 2012-037100
Modification and/or amendment by instrument:
Recording Information: May 07, 2013 as Instrument No. 2013-024625 and 2013-024627
47. Lease and the terms and conditions thereof:
Lessor: ORGS LLC, a Delaware limited liability company
Lessee: ORG Properties LLC, a Delaware limited liability company
As disclosed by: Memorandum of Lease
Recorded: June 13, 2003
Recording No.: 2003-053847
48. Leasehold Deed of Trust and Assignment of Rents:
Grantor: ORG Properties LLC, a Delaware limited liability company
Trustee: Lawyer's Title Insurance Company
Beneficiary: Wells Fargo Bank, National Association PRE-SUBMITTAL REC'D
Amount: $12,960,996.00
NOV 2 5 2013
first American Title
•
• •
Lot Book Service Guarantee No.: 7199-2177595
Page 10 of 18
Dated: June 06, 2013
Recorded: June 13, 2003
Recording No.: 2003-053848
Modification and/or amendment by instrument:
Recording Information: July 24, 2012 as Instrument No. 2012-037099
Modification and/or amendment by instrument:
Recording Information: May 07, 2013 as Instrument No. 2013-024626
49. Assignment of leases and/or rents and the terms and conditions thereof:
Assignor: ORG Properties LLC, a Delaware limited liability company
Assignee: Wells Fargo Bank, National Association
Recorded: June 13, 2003
Recording Information: 2003-053849, Official Records of Lane County, Oregon
Modification and/or amendment by instrument:
Recording Information: July 24, 2012 as Instrument No. 2012-37100
50. Lease and the terms and conditions thereof as disclosed by Memorandum of Lease.
Lessor: ORG Properties LLC, a Delaware limited liability company
Lessee: O.R.G. Restaurants, LLC, a California limited liability company.
Term: 15 years
Dated: June 06, 2003
Recorded: June 13, 2003
Recording Information: 2003-053850, Official Records of Lane County, Oregon
(Affects a portion)
Modification and/or amendment by instrument:
Recording Information: May 07, 2013 as Instrument No. 2013-024627
The present ownership of the leasehold created by said lease and other matters affecting the
interest of the lessee are not shown herein.
51. Non-Disturbance and Attornment Agreement, including terms and provisions thereof.
Recorded: June 13, 2003, Reception No. 2003-053851, Official Records of
Lane County, Oregon •
52. Subordination, Non-Disturbance and Attornment Agreement, including terms and provisions
thereof.
Recorded: June 13, 2003, Reception No. 2003-053852, Official Records of
Lane County, Oregon
PRE-SUBMITTAL REC'D
NOV 2 5 2013
First American Title
Lot Book Service Guarantee No.:7199-2177595
Page 11 of 18
•
53. Line of Credit Trust Deed, including the terms and provisions thereof, given to secure an
indebtedness of up to $300,000,000.00
Grantor: Cinemark USA, Inc., a Texas corporation
Beneficiary: Lehman Commercial Paper Inc.
Trustee: AmeriTitle
Dated: June 13, 2003
Recorded: • July 21, 2003
Recording Information: Instrument No. 2003-066671, Official Records of Lane County,
Oregon
(Affects the Leasehold interest)
Modification and/or amendment by instrument:
Recording Information: July 12, 2004, Instrument No. 2004-053173, Official Records of
Lane County, Oregon
Modification and/or amendment by instrument:
Recording Information: July 12, 2004, Instrument No. 2004-053174, Official Records of
Lane County, Oregon
54. Line of Credit Trust Deed, including the terms and provisions thereof, given to secure an
indebtedness of up to $300,000,000.00
Grantor: Cinemark USA, Inc., a Texas corporation •
Beneficiary: Lehman Commercial Paper Inc.
Trustee: AmeriTitle
Dated: June 13, 2003
Recorded: July 21, 2003
Recording Information: Instrument No. 2003-066672, Official Records of Lane County,
Oregon
(Affects the Leasehold interest)
Modification and/or amendment by instrument:
Recording Information: July 12, 2004, Instrument No. 2004-053173, Official Records of
Lane County, Oregon
•
Modification and/or amendment by instrument:
Recording Information: July 12, 2004, Instrument No. 2004-053174, Official Records of
Lane County, Oregon
55. Financing Statement, indicating a Security Agreement
Debtor: JCK Restaurants, Inc.
Secured Party: Irwin Franchise Capital Corporation
Recorded: September 27, 2005 C p �7p! C
Recording Information: 2005-076734 PRE-SUBMITTAL RECD
56. Lease and the terms and conditions thereof as disclosed by Memorandum of Lease. NOV 2 3 2013
Lessor: GGP-Gateway Mall, L.L.C.
Lessee: Kohl's Department Stores, Inc.
Term: Term expiring January 31, 2027, subject to 8 separate options
to extend the term for successive periods of 5 years each
First American Title
• •
Lot Book Service Guarantee No.: 7199-2177595
Page 12 of 18
•
Dated: August 15, 2005
Recorded: November 15, 2005
Recording Information: Instrument No. 2005-090944, Official Records of Lane County,
Oregon
(Affects a portion)
The present ownership of the leasehold created by said lease and other matters affecting the
interest of the lessee are not shown herein.
57. Line of Credit Trust Deed, including the terms and provisions thereof, given to secure an
indebtedness of up to $1,270,000,000.00
Grantor: Cinemark USA, Inc., a Texas corporation
Beneficiary: Lehman Commercial Paper Inc.
•
Trustee: AmeriTitle
Dated: October 05, 2006
Recorded: October 09, 2006
Recording Information: Instrument No. 2006-073295, Official Records of Lane County,
Oregon
(Affects the Leasehold interest)
Modification and/or amendment by instrument:
Recording Information: August 14, 2013 as Instrument No. 2013-044631
The beneficial interest under said Deed of Trust has been assigned to Barclays Bank, PLC, by
Notice of Resignation of Agent, Notice of Appointment of Successor Agent, and Assignment of
Deed of Trust recorded June 25, 2010 as Instrument No. 2010-029797 .
58. Line of Credit Trust Deed, including the terms and provisions thereof, given to secure an
indebtedness of up to $1,270,000,000.00
Grantor: Cinemark USA, Inc., a Texas corporation
Beneficiary: Lehman Commercial Paper Inc.
Trustee: AmeriTitle
Dated: October 05, 2006
Recorded: October 09, 2006
Recording Information: Instrument No. 2006-073296, Official Records of Lane County,
Oregon
(Affects the Leasehold interest)
•
Modification and/or amendment by instrument:
Recording Information: August 14, 2013 as Instrument No. 2013-044632
The beneficial interest under said Deed of Trust has been assigned to Barclays Bank, PLC,
by Notice of Resignation of Agent, Notice of Appointment of Successor Agent, and Assignment of
Deed of Trust recorded June 25, 2010 as Instrument No. 2010-029796 .
59. Easements, including the terms and provisions thereof, contained in that General Judgment
entered in Lane County Circuit Court Case No. 160600821, and recorded April 06, 2007,
Reception No. 2007-022874, Official Records of Lane County, Oregon.
PRE-SUBM11TAL REC'D
NOV `O1J
First American Title
• •
Lot Book Service Guarantee No.: 7199-2177595
•
Page 13 of 18
60. Easement, including terms and provisions contained therein:
Recording Information: October 9, 2008, Reception No. 2008-056324
In Favor of: City of Springfield
For: Permanent easement for bicycle/pedestrian facility maintenance
and temporary easement for work area
61. Line of Credit Deed of Trust and Assignment of Rents:
Grantor: GGP-Gateway Mall, L.L.C., a Delaware Limited Liability Company
Trustee: First American Title Insurance Company
Beneficiary: Wells Fargo Bank, National Association
Amount: $483,500,000.00
Dated: January 12, 2012
Recorded: January 23, 2012
Recording No.: Instrument No. 2012-002285
(Affects a portion)
62. Landlord Agreement and the terms and conditions thereof:
Between: Apple Oregon, LLC, a Delaware limited liability company
And: GGP-Gateway Mall, LLC, a Delaware limited liability company
Recording Information: December 26, 2012, Instrument No. 2012-066081
63. Lease and the terms and conditions thereof:
Lessor: GGP-Gateway Mall, LLC, a Delaware limited liability company
Lessee: Wal-Mart Stores, Inc., a Delaware corporation
As disclosed by: Memorandum of Lease
Recorded: December 27, 2012
Recording No.: 2012-066273
(Affects a portion)
The present ownership of the leasehold created by said lease and other matters affecting the
interest of the lessee are not shown herein.
64. Subordination, Non-Disturbance and Attornment Agreement and the terms and conditions
thereof:
Between: Wal-Mart Stores, Ins., a Delaware Corporation
And: Wells Fargo Bank, N.A.
Recording Information: December 27, 2012 as Instrument No. 2012-066274
65. Line of Credit Trust Deed, including the terms and provisions thereof, given to secure an
indebtedness of up to $575,000,000.00
Grantor: Apple Oregon, LLC, a Delaware limited liability company
Beneficiary: Bank of America, N.A.
Trustee: Chicago Title Insurance Company
Dated: December 07, 2012
Recorded: December 26, 2012 p��}
Recording Information: Instrument No. 2012-066080 PRE SUBMll 'AL RECD
NOV 252013
66. Payment and Performance Bond, including terms and provisions thereof.
First American Title
Lot Book Service Guarantee No.:7199-2177595
•
Page 14 of 18
Recorded: March 28, 2013, Instrument No. 2013-016861
67. Lease and the terms and conditions thereof:
Lessor: GGP - Gateway Mall L.L.C., a Delaware limited liability company
Lessee: Wingmen V, LLC, a Washington limited liability company
As disclosed by: Memorandum of Lease
Recorded: May 17, 2013
Recording No.: 2013-026684
(Affects a portion)
The present ownership of the leasehold created by said lease and other matters affecting the
interest of the lessee are not shown herein.
68. Subordination, Non-Disturbance and Attornment Agreement, including terms and provisions
thereof.
Recorded: August 08, 2013 as Instrument No. 2013-043547
69. Deed of Trust and Assignment of Rents:
Grantor: Wingmen V, LLC, a Washington limited liability company
Trustee: First American Title Insurance Company
Beneficiary: Wells Fargo Bank, National Association, a national banking
• association
Amount: $45,000,000.00
Dated: September 26, 2013
Recorded: October 15, 2013
Recording No.: . 2013-054660
(Affects a portion)
70. Financing Statement, indicating a Security Agreement
Debtor: Wingmen V, LLC
Secured Party: Wells Fargo Bank, National Association, as Administrative Agent
Recorded: October 15, 2013
Recording Information: 2013-054661
71. Easement rights implied by that certain Memorandum of Lease from GGP - Gateway Mall L.L.C., a
Delaware limited liability company, Lessor, to Wingmen V, LLC, a Washington limited liability
company, Lessee, recorded May 17, 2013, Instrument No. 2013-026684.
72. Any failure to comply with the terms, provisions and conditions of the unrecorded leases as set
forth above.
73. Unrecorded leases or periodic tenancies, if any.
We have also searched our General Index for Judgments and State and Federal Liens against the
Grantee(s) named above and find: n 1 f
NONE PRE-SUBMII1AJ RECD
We find the following unpaid taxes and city liens: NOV 2 6 2013
First American Title
•
Lot Book Service Guarantee No.:7199-2177595
Page 15 of 18
1. Taxes for the year 2013-2014
Tax Amount $ 15,801.13
Unpaid Balance: $ 15,801.13, plus interest and penalties, if any
Code No.: 19-00
Map &Tax Lot No.: 17-03-22-00-02109
Property ID No.: 1054251
Taxes for the year 2012-2013
Unpaid Balance: $ 63.73, plus interest
2. Taxes for the year 2013-2014
Tax Amount $ 831,205.22
Unpaid Balance: $ 831,205.22, plus interest and penalties, if any.
Code No.: 19-00
Map &Tax Lot No.: 17-03-22-00-02200
Property ID No.: 0188373
3. Taxes for the year 2013-2014
Tax Amount $ 73,499.04
Unpaid Balance: $ 73,499.04, plus interest and penalties, if any.
Code No.: 19-00
Map &Tax Lot No.: 17-03-22-00-02219
Property ID No.: 1489812
Taxes for the year 2012-2013
Unpaid Balance: $ 66.07, plus interest
4. Taxes for the year 2013-2014
Tax Amount $ 149,794.27
Unpaid Balance: $ 149,794.27, plus interest and penalties, if any
Code No.: 19-00
Map &Tax Lot No.: 17-03-22-00-02218
Property ID No.: 1459146
Taxes for the year
Unpaid Balance: $ , plus interest
5. Taxes for the year 2013-2014
Tax Amount $ 124,424.87
Unpaid Balance: $ 124,424.87, plus interest and penalties, if any.
Code No.: 19-00
Map &Tax Lot No.: 17-03-22-00-02300
Property ID No.: 0188449
PRE-SUBMIR RECD
6. Taxes for the year 2013-2014 NOV 2 J 2013
Tax Amount $ 27,913.12
Unpaid Balance: $ 27,913.12, plus interest and penalties, if any.
First American Title . .
• •
Lot Book Service Guarantee No.:7199-2177595
Page 16 of 18
Code No.: 19-00
Map &Tax Lot No.: 17-03-22-00-02305
Property ID No.: 1004538
Taxes for the year 2012-2013
Unpaid Balance: $ 112.59, plus interest
7. Taxes for the year 2013-2014
Tax Amount $ 14,906.38
Unpaid Balance: $ 14,906.38, plus interest and penalties, if any
Code No.: 19-00
Map &Tax Lot No.: 17-03-22-00-02305-901
Property ID No.: 1772597
•
Taxes for the year 2012-2013
Unpaid Balance: $ 60.13, plus interest
8. Taxes for the year 2013-2014
Tax Amount $ 34,781.58
Unpaid Balance: $ 34,781.58, plus interest and penalties, if any
Code No.: 19-00
Map &Tax Lot No.: 17-03-22-00-02305-902
Property ID No.: 1772605
Taxes for the year 2012-2013
•
Unpaid Balance: $ 140.29, plus interest
9. Taxes for the year 2013-2014
Tax Amount $ 143,804.62
Unpaid Balance: $ 143,804.62, plus interest and penalties, if any
Code No.: 19-00
Map &Tax Lot No.: 17-03-22-00-02307
•
Property ID No.: 1445939
10. City liens, if any, of the City of Springfield.
THIS IS NOT a title report since no examination has been made of the title to the above described
property. Our search for apparent encumbrances was limited to our Tract Indices, and therefore above
listings do not include additional matters which might have been disclosed by an examination of the
record title. We assume no liability in connection with this Lot Book Service and will not be responsible
for errors or omissions therein. The charge for this service will not include supplemental reports,
rechecks or other services.
PRE-SUBMITTAL REC'D
NOV 252013
First American Title
Lot Book Service Guarantee No.: 7199-2177595
Page 17 of 18
Exhibit "A" •
Real property in the County of Lane, State of Oregon, described as follows:
PARCEL I:
BEGINNING AT A POINT NORTH 00° 04' 00" WEST, A DISTANCE OF 125.69 FEET FROM THE
SOUTHWEST CORNER OF THE W.M. STEVENS DONATION LAND CLAIM NO. 46, IN SECTION 22,
TOWNSHIP 17 SOUTH, RANGE 3 WEST, WILLAMETTE MERIDIAN; THENCE SOUTH 68° 40' 00" WEST, A
DISTANCE OF 369.62 FEET TO THE WESTERLY RIGHT-OF-WAY OF BEVERLY STREET; THENCE SOUTH
21° 20' 00" EAST ALONG SAID WESTERLY RIGHT-OF-WAY, A DISTANCE OF 291.02 FEET TO THE
NORTHERLY RIGHT-OF-WAY OF HARLOW ROAD; THENCE ALONG THE NORTHERLY RIGHT-OF-WAY OF
HARLOW ROAD ALONG THE ARC OF A 2819.79 FOOT RADIUS CURVE RIGHT (THE CHORD OF WHICH
BEARS SOUTH 73° 19' 13" WEST, A DISTANCE OF 296.53 FEET) A DISTANCE OF 296.67 FEET; THENCE
CONTINUING ALONG SAID NORTHERLY RIGHT-OF-WAY, SOUTH 76° 25' 57" WEST, A DISTANCE OF
73.46 FEET; THENCE CONTINUING ALONG SAID NORTHERLY RIGHT-OF-WAY SOUTH 89° 22' 51" WEST,
A DISTANCE OF 576.60 FEET TO THE EASTERLY RIGHT-OF-WAY OF INTERSTATE 5; THENCE NORTH
04° 41' 34" EAST ALONG SAID EASTERLY RIGHT-OF-WAY, A DISTANCE OF 2647.83 FEET TO THE
SOUTHWEST CORNER OF THAT PARCEL DESCRIBED ON REEL 1139, RECEPTION NO. 81-24247,
OFFICIAL RECORDS OF LANE COUNTY, OREGON; THENCE LEAVING SAID EASTERLY RIGHT-OF-WAY
NORTH 89° 46' 54" EAST ALONG THE SOUTH LINE AND EXTENSION THEREOF OF SAID PARCEL, A
DISTANCE OF 1249.20 FEET TO THE WESTERLY RIGHT-OF-WAY OF GATEWAY STREET; THENCE ALONG
SAID WESTERLY RIGHT-OF-WAY THE FOLLOWING COURSES AND DISTANCES: ALONG THE ARC OF A
53.0 FOOT RADIUS CURVE RIGHT(THE CHORD OF WHICH BEARS SOUTh 15° 55' 15" WEST, A
DISTANCE OF 20.14 FEET) A DISTANCE OF 20.27 FEET; THENCE ALONG THE ARC OF A 127.0 FOOT
RADIUS CURVE LEFT(THE CHORD OF WHICH BEARS SOUTH 15° 55' 15" WEST, A DISTANCE OF 48.27
FEET) A DISTANCE OF 48.56 FEET; THENCE SOUTH 04° 57' 57" WEST, A DISTANCE OF 148.74 FEET;
THENCE SOUTH 26° 54' 23" WEST, A DISTANCE OF 32.12 FEET; THENCE SOUTH 04° 57' 57" WEST, A
DISTANCE OF 85.15 FEET; THENCE SOUTH 27° 39' 44" EAST, A DISTANCE OF 46.37 FEET; THENCE
SOUTH 04° 57' 57" WEST, A DISTANCE OF 800.07 FEET TO THE POINT OF CURVATURE OF A 2904.93
FOOT RADIUS CURVE LEFT; THENCE ALONG THE ARC OF SAID CURVE (THE CHORD OF WHICH BEARS
SOUTH 02° 46' 21" WEST, A DISTANCE OF 222.48 FEET) A DISTANCE OF 222.53 FEET; THENCE ALONG
THE ARC OF A 53.0 FOOT RADIUS CURVE RIGHT (THE CHORD OF WHICH BEARS SOUTH 11° 12' 04"
WEST, A DISTANCE OF 19.54 FEET) A DISTANCE OF 19.66 FEET; THENCE ALONG THE ARC OF A 127.0
FOOT RADIUS CURVE LEFT (THE CHORD OF WHICH BEARS SOUTH 10° 31' 53" WEST, A DISTANCE OF
49.75 FEET) A DISTANCE OF 50.07 FEET; THENCE ALONG THE ARC OF A 2917.93 FOOT RADIUS CURVE
LEFT (THE CHORD OF WHICH BEARS SOUTH 02° 31' 23" EAST, A DISTANCE OF 179.44 FEET) A
DISTANCE OF 179.46 FEET; THENCE SOUTH 17'30' 11" WEST, A DISTANCE OF 31.92 FEET; THENCE
SOUTH 05° 43' 11" EAST, A DISTANCE OF 87.27 FEET; THENCE SOUTH 39° 45' 43" EAST, A DISTANCE
OF 46.13 FEET; THENCE ALONG THE ARC OF A 2904.93 FOOT RADIUS CURVE LEFT(THE CHORD OF
WHICH BEARS SOUTH 09° 46' 48" EAST, A DISTANCE OF 248.05 FEET) A DISTANCE OF 248.12 FEET;
THENCE LEAVING THE WESTERLY RIGHT-OF-WAY OF GATEWAY STREET, SOUTH 68° 40' 00" WEST, A
DISTANCE OF 267.40 FEET TO THE POINT OF BEGINNING, ALL IN LANE COUNTY, OREGON.
EXCEPT THEREFROM THAT PORTION CONVEYED TO DAYTON HUDSON CORPORATION, A MINNESOTA
CORPORATION, BY DEED RECORDED MARCH 13, 1990, RECORDER'S RECEPTION NO. 90-11882, LANE
COUNTY OREGON OFFICIAL RECORDS, DESCRIBED AS FOLLOWS:
PRE-SIIBMF A+. REC'D
NOV 252013
First American Title
Lot Book Service Guarantee No.: 7199-2177595
Page 18 of 18
BEGINNING AT A POINT BEING NORTH 559.08 FEET AND WEST 883.78 FEET FROM THE SOUTHWEST
CORNER OF ThE W. M. STEVENS DONATION LAND CLAIM NO. 46, IN SECTION 22, TOWNSHIP 17
SOUTh, RANGE 3 WEST OF THE WILLAMETTE MERIDIAN; THENCE SOUTH 55° 20' 00" EAST 192.50
FEET; THENCE SOUTH 4° 40' 00" WEST 146.92 FEET; THENCE SOUTH 85° 20' 00" EAST, 178.76 FEET;
THENCE NORTH 4° 40' 00" EAST 4.85 FEET; THENCE SOUTH 85° 20' 00" EAST 35.78 FEET; THENCE
NORTH 34° 39' 03" EAST 84.36 FEET; THENCE SOUTH 85° 20' 00" EAST 429.71 FEET; THENCE SOUTH
4° 21' 29" EAST 65.26 FEET; THENCE ALONG THE ARC OF A 228.00 FOOT RADIUS CURVE TO THE
RIGHT (THE CHORD OF WHICH CURVE BEARS SOUTH 32° 09' 15" WEST 271.32 FEET) A DISTANCE OF
290.59 FEET; THENCE SOUTH 68° 40' 00" WEST 166.75 FEET; THENCE SOUTH 21° 20' 00" EAST 54.00
FEET; THENCE SOUTH 68° 40' 00" WEST 60.00 FEET; THENCE NORTH 21° 20' 00" WEST 54.00 FEET;
THENCE SOUTH 68° 40' 00" WEST 217.49 FEET; THENCE NORTH 90° 0' 00" WEST 365.85 FEET;
THENCE NORTH 4° 40' 00" EAST 598.65 FEET TO THE POINT OF BEGINNING IN LANE COUNTY,
OREGON.
ALSO EXCEPTING THEREFROM THAT PORTION DESCRIBED IN BARGAIN AND SALE DEED RECORDED
MARCH 8, 1990, RECEPTION NO. 90-11194, OFFICIAL RECORDS OF LANE COUNTY, OREGON.
ALSO EXCEPTING THEREFROM THAT PORTION DESCRIBED IN GENERAL JUDGMENT RECORDED APRIL
6, 2007, RECEPTION NO. 2007-022874, OFFICIAL RECORDS OF LANE COUNTY, OREGON.
ALSO EXCEPTING THEREFROM THAT PORTION CONVEYED TO THE CITY OF SPRINGFIELD, A
MUNICIPAL CORPORATION OF THE STATE OF OREGON, BY DEED RECORDED OCTOBER 9, 2008, AS
RECEPTION NO. 2008-056324, OFFICIAL RECORDS OF LANE COUNTY, OREGON.
PARCEL II
BEGINNING AT A POINT BEING NORTH 559.08 FEET AND WEST 883.78 FEET FROM THE SOUTHWEST
CORNER OF THE W.M. STEVENS DONATION LAND CLAIM NO.46, IN SECTION 22, TOWNSHIP 17
SOUTH, RANGE 3 WEST OF THE WILLAMETTE MERIDIAN; THENCE SOUTH 85° 20' 00" EAST 192.50
FEET;THENCE SOUTH 4° 40' 00" WEST 146.92 FEET; THENCE SOUTH 85° 20' 00" EAST 178.76 FEET;
THENCE NORTH 4° 40' 00" EAST 4.85 FEET; THENCE SOUTH 85° 20' 00" EAST 35.78 FEET; THENCE
NORTH 34° 39' 03" EAST 84 .36 FEET; THENCE SOUTH 85° 20' 00" EAST 429.71 FEET; THENCE SOUTH
4° 21' 29" EAST 65.26 FEET; THENCE ALONG THE ARC OF A 228.00 FOOT RADIUS CURVE TO THE
RIGHT (THE CHORD OF WHICH CURVE BEARS SOUTH 32° 09' 15" WEST 271.32 FEET) A DISTANCE OF
290.59 FEET; THENCE SOUTH 68° 40' 00" WEST 166.75 FEET; THENCE SOUTH 21° 20' 00" EAST 54.00
FEET; THENCE SOUTH 68° 40' 00" WEST 60.00 FEET; THENCE NORTH 21° 20' 00" WEST 54.00 FEET;
THENCE SOUTH 68° 40' 00" WEST 217.49 FEET; THENCE WEST 365.85 FEET; THENCE NORTH 4° 40'
00" EAST 598.65 FEET TO THE POINT OF BEGINNING, IN LANE COUNTY, OREGON.
NOTE: This Legal Description was created prior to January 01, 2008.
PRE-SUBMITTAL REC'D
NOV 252013
First American Title
Gateway Mall Redevelopment
Site Plan Review - Major Modification Pit-Application 11/15/13
C. Exhibit C: Architectural Renderings
PRE-SUBMITTAL. REC'D
NOV 2 5 2013
�� BALZHISER & HUBBARD ENGINEERS PAGE
20
II/
I
. r
.: , r 0. •- , i
...
• '•. •p.__. . -
'-_, ' ■ all ,
4
• .
--7
1 .. it 1,•Ir • / • -..,
::. ,.....!-- '• . '1, ..
•••4" i . ca
- • - ,• .., -, i --,,• 1 •
,
11 ,•i ri • --- ! !1 C.)
L-2-1 re 5
4 - '. i •''- -11- 1 1,•', ' ----; ir•-•\.
• i 4
10:4:e 7=—D. •
•-. .'). 1.57 1':-. ' 7 • i'l — 1. .. Ifni ) 1
ht,........, Leb
._._ ..,. , , , , .. 3 , .:1 r,. •, ir . . ., Li Eft-- c...)
›,..— 1`,—L•___ t\
.... _• 1 , -Iv - : I,. , \ r.;=1
- CD
1 •r• 'Z'r.
f , )
::"Ilt' i./ , , --- i :--..
I i i . ; 1 I -,li,
. a
1 i. . .--.7.—. , i:
• -
,j+ 1 i A
t , --.... , , I; if 'Tr'
II t '.H. t' .•1' ' 4. 0• A
. ..,.- . -....F 41, ••---"'"--... - ' L 1.1 1 I..\
1,i '''' • 1:i i - ., .
,.-, '.. , • i 4x, , . IT* . ., rA- •1
IL '' '1, r
..,4 r• ,. ,• '-- ■ ,
. 11 .:-. i
i
-1-. 15171".` . )P.4.1 .If.,4i, ' 4-:-.7.--2----- ' • ' 9 ' . 1
.--=. '• '''ill
.: tit ' ' f,--'• -- '• 4., -, kiiiii7:-- --
.. .
\ -._...._:-A7 :• - w
,ii 3;k 7. --... p
) i :.',i.
' Ifti 'M i''.. i , '' •.,,I..- I / I'
,
iil • ' i 1 '
. ,.
. .,,:l •1 , '' '' .'
,
•
• I..I ,
=•i•- , • , : ,
.', '•• • •• • , •
, ,,, i• /
__ . • ,
111%, - ' '..
■ . i
. ..es- -•-,i'• ..., ,4,,„. ,,,, .,-
' ,.
- .
c •4 til 1
s 1- •s, i
‘ I
. ) • ...... ... #
i
/ '
2..,,..
/ .
':t'.. '• • 1• i ••••••••.
. , r.
,
It'":. r
' iJ i /
.
I /ii.,r, • 1 i
,--isisimr. ,..1.; .-
i 41,
, 7--f* - ; • •_.
••,.• ! i •
•
4 • .
j / ..4,4kNY.. -r C•
:. i rts;110t
34-
. ......-- • 1o,
. . 4 1 . . \
0 ,
r-
/ .A.- "--- '
,, „. . ; / t '-,
\I 1.
/: /•
• \ `..K..\•\il
•
, .
.
,• / •,.... I ,,, , \\.‘
; / .-• \,.. \
. .
4
.• ... .„
. . . „. , „ , ., t,
_
.„. „. 7 ,. , ,. ' N
II
' I
'$...:-. il,..115ii 111(,1,../:.\'' • \
I 1 1
. .
\ • s
If
...
• i. ■ • \ *
..., ..
1
- t 1 I'. . -— or--' -L.,' "..4 ' • .*
1 f * •
1 ,,-..-.:_. u-',-... .■' . .- \ ' \
\ t
, .
\ ,.if,tep :". ). '' ,
1 \
,, •al.'''. v.-S / 4 I ',
- t• I' /*. 1 • ' i 1
5 1- -
II' 1 1 \V.
i'',... .
r. • *X i ,
II .
4 t I*..4-1-::'' ' ".'
_1.e-..-
40
,
. r'"
.,
- � j I it
A.
, if=
� f
Y
' 4
....,:,...,.i. : f,;... I; .
_______ _ .. . . .."- pv:ii ilis::::.3_, ,
,ft,�, 4
,, c i.. rte#' ,1
‘'l ktikti.At''% . t '
=fit 0 1 I �" ._
- - k'' t-'t! '& �-
i' I
_ '4 4 1••�i t.
- ' .. 11 lk 414( .'
•
It: r L I T.-., ,.
11 4 R3-t#• I .. 441.: Olk
IL. 6r
i - A
-_..,..,..,,.. .,
11W I ' ii 1-- t 1 I• r ;� � ; 4.
... . . 0 n 4 -f' '.t.1 ( .
„ i1
F .,
,,T.- I-� r
.
win
1
40411111118 I .!1
/,•EN1
,.' IOW
•
•
• I -..._ 1r 1 1• r -- .
_ _
I �� � ' , ..,., .
I "1• •-+(J s!
. 1 . 1 •t r' r 1
J ;• 1� 0 L., , , It ...,.
y. .. „ (.....)
,'''' --'.4,,,,1 7,,,t,P,..4./7, , . / rr hi CG -
z '' Iz \
'',
1-I t ,�� CL..
'
r,
C
> J1I .i ' 1'.:•
Lq '
^.-" ii Y P I,1 i
` •�
':tip
! I
1
_rte
— , , i•
, .. .:. .„,igiiiii
r
-,, . '‘, .4it'il 1 \ 1 g' ''
._ ,i,. . 1 • \,,, . ii
-..-, -f,•:-.
1
M 9
♦
- rr2l ,r f• I r!
e. 1.
u
MU ,
L Ar.-
. . . . _
6 _ .
$ .1"1, #4 4.i.„, ..• .1..1,
I_ ,',.:1.•
II 5 ..
, I 11.
\c.
. .,
I * '''' •
.•,'.• . le
. fl, .1 4•.. I i 1
Tirj , 4 fall
. . .
I i ; 1 .
.
,
. 1 . • it 1 __
' ' 1 f:•,,,- '
,.... , , ., , ---, e•-.3
i It 4, SI4.-tj;.._ i
4. 1. 1 i', , '' .›-
• --- ', "'Immi,1, COI
• 41:1 ' '' - ..
.-- \ V/I
Cr)
. ' 4,0 ', ....` •,..."-.0 L.L.JI
. ,• 1 • -1 1-1 . . .
C:e
. . . 0-.
. .
- . A..." . . • ,
-.4;
, wttli,1 • --
- • • • . -
'n . .. ,,,v . .....41 . ■ _
. ..• 1
,- ) 1 ' t .,11. , ,•
I - , • t,r I.. •
.0.: - • • • 411
_ 0.,
n
•
' '
_ Ail I. -• . fr. ' f
F ;
- . ...•. •
. •
i
I
. .
. 1
„.. /
.
, . .;,•.„, 1
. ;
. . ,
. ' I
. 4 I
. i
. .
. .
. I 1
. .
1 i
. I
. I
. i
' . ..
—,
,
” . ...
. .
• .2 14 ,
- 11.
• ;
.... , . .
. .
- i I
., .
..,
... - _ ...., ■ ,,
I , -' ■
111i- C .
. •
. I•
[' .
, . ■
...-
_...._..,... .
il
I
' ' . ...
. . ,
1 .
. i 1
.......4
. . . ,
. .
— - .• —
. .-
1
f
1
it
I {I o
■
., I + n
. . I'' Vii+
LLJ
14 *� 11 1 a
^ • II
■
li
ilF cr ..'k i .'' 81,r j
I
I •
•
i .
r
r
•
a
1.
c
. _'�i{'
1 RPLi;lit. 11
•.J . �; ■C
0►-- 'I
•
F .
�1
E 4 %.
1
1
N.'1'';
I
1111
I • •
Gateway Mall Redevelopment
Site Plan Review- Major Modification Pre-Application 11/15/13
D. Exhibit D: Reduced Scale Site Map
PRE-SUBMITTAL REC'D
NOV 252013
PAGE 21
BALZHISER & HUBBARD ENGINEERS
/1f
• �_ •
7
W o W fe,F d � t
1
..s'€ r: u1ii�
Z '' 0.- V
Ls 17V19A0 - Mild 3115
I. Jr9P410 J TM AYM
3t41 ES3LUI3dOlid 3snov awt iaws o 4 F g 2 Cy\
TWA/WOW a i +y o V
kt i
I i W: 1, r II 1I
a 1 ^� '6 fir: ,
• • '°ice :- •• '!'''.- ill{y
i I I:1 e ! f � o.�:!'tJ.r?I, fir'..= ,�` n.- - 1,
ii E pr N ' rJ `-n CA 3--a-i .U\.`-, , .'-',1 :c- Amy �..
�' -, 1,'-'''77::"-_1V!,','.,,l t c,
$ 1 _1;4 • ii. p r∎, 11ry-`VI . -" I I i
iiiiiii / JJ ,
f_ I I 1 [�"�itZ �it`
J ' Q-'23 I. 1 I k:
, i€
11 1 l
■
6 it ' V` •'a L- 4'- ` M�i 3 pin? A/»7
- `• 0 a,
11 ; il ° Fig4C5VEZ ' , * ?mli litil.1111 , i !
Iltli - '4 g :.i--i'Ar''': lie' Mt g ii li t•- i if.,..,.,-. ,IL",,1 '-4 -1 '
i 1 " - '�rrilf;-,4 0. —rl , i.
go e R R R I, %' e\Q :\'•^,L ! 1-7,-,A,-,, P 1. -il�t
l•' : `="'_ _59/1"k711111, .--,T. 1 ey, -ea ..r 7-1r,r F." ' __JR
-•J • 1\
I .. C . - } L- 'NM,—,-i,�riI y
i iII1IImo_ i !` `;... `y. l•
�, _qq• I J1.U!II Klj r 17f IT" — . i
0 II k 1p wm„,...mill I,.
it
i -- - - - rF-, -
., y yr f 1
}�y, ro JI i....----
- , '�• „&`•.,1.∎ N I to »�i 4=,,=., _ I i $
' 41000` 1' lr.r • --U.N10 1t\��,1•..\1\.h,\'.: �.:`��.1,, i , NQ'Y■� 1
. ,, x ,.,+ Uif r:7.9rl.7 rr:., , ■
nog :W i'it it '� 7 ',■.:..s`{j:4 i j 'S( , )\�n/`p . A0.II 1141 13Y.01 I ,,2 .. .
g --- -,a 13111 0 ' . Ili ',\, V
CI
,; -''.
11 h ii.. . , ' >l�
W T y0 4.R iY ^ : ' it
j z.
LJd
Ce
I la-
•
Gateway Mall Redevelopment
Site Plan Review - Major Modification Pre-Application 11/15/13
E. Exhibit E: Existing Lighting Cut-Sheets
PRE-SUBMITTAL REC'D
Nov 252013
PAGE 22
I3ALZHISER & HUBBARD ENGINEERS
',AV/
V %TURK le BALLAST SPECIFICATION
7
LIGHTING 775W M181
e Pulse Start Metal Halide
V90Y961OT
60 Hz CWA
Input Volts 480 4X6 CORE-HX,CWA CWI UNITS
Line Current(Amps)
HOLES CLEARED
Operating 1.85 FOR#10 BOLTS
1_ 6.00"(152 mm)
Open Circuit 1.55
Starting 1.20 1 • O O • 1
Recommended Fuse(Amps) 5
3.87" 4.25"
Regulation (98 mm) (108 mm)
Line Volts ±10%
Lamp Watts ±10%
Temperature Ratings Q • •
Insulation Class 180(H)
.4— 4.375"(111 mm) —
Coil Temperature Code 0 5.375"(136 mm)
Benchtop Coil Rise 88.9 I I
Power Factor(Min) 90% +
Input Watts 855 W A B
Efficiency
NOM.Open Circuit Voltage 415
Input Voltage At Lamp Dropout 230 . I I I
Min Ambient Starting Temp -20"Fl-30"C' Capacitor ACB327OV Ignitor: BVS-020
60 HZ TEST PROCEDURES Microfarads: 22.0 uf Case Temp(Max): 105°C
High Potential Test(Volts) Volts(Max): 525 V BTL Distance(Max): 10 ft
1 Minute 1,850 V Case Temp(Max): 100°C
1 Second 2200 V Height(Max): 3.94 in
Open Circuit Voltage Test(V) 375-455 Dia/Oval Dia(Max): 1.97 in
Short Circuit Current Test(A) Oval Width(Max): 2.97 in Tit-IMI k 1
Min 4.30 u0.58"(15 mm)
Secondary Current • = w
Max 5.30
Min 1.00 206'
Input Current f
Max 1.50
CORE and COIL Specifications HEIGHT
y
Dimension(A) 2.80 in
Dimension(B) 4.95 in 0 isa,mml
Weight 21.0 ib's _—+- x , 3
Lead Lengths 12" CO Ill OVAL DIA.
Capacitor Requirement //� ° '
Microfarads 22.0 uf 14-WIDTH
Volts(Min) 490 V OIL-FILLED CAPACITOR OVAL IGNITOR
Ordering Information Add Suffix for options
C-With Capacitor
K-Prewired,with Capacitor and Bracket Kit
imi-
B-With Welded Bracket,no cap
CB-With Capacitor and Welded Bracket C US BLACK RED
�r 11 �o
'-40°F/-40°C Min Ambient Starting Temp with Venture Lamp BLUE a
Coil material:primary Cu and secondary Al a x3
RoHS com liant on all manufactured roducts after Au ust 1,2007 c 'S 120V ORANGE t
p products g EMERGENCY BUCWHT ' 4 all F(
Data is based upon tests performed by Venture Lighting in a controlled environment and is RoHS LAMP
CAP +a�o�
representitive of relative performance. Actual performance can vary depending on operating WHITE 1
conditions. Specifications are subject to change without notice. COMMON ••■ - t ', 'D
7/1/2008 Production , �,' " )) i�•
32000 Aurora Road •Solon,Ohio 44139•800-451-2606 • 440-248-3510 • Fax 800-451-2605 • Fax 440-349-7771 •4:1,1 h.v�ntn e�gtitn tr gcom
0
ZIM2. 11 .n t
v ," MP 775W/BU/BT37/PS/950
GENERAL Characteristics ELECTRICAL
Lamp Type MN Pulse Start Single Ended Lamp Watts 715
ANSI Code M181/0 Lamp Oper.Voltage(Nom.) 220
VENTURE' Bulb Shape 8137
■ [H:I i is[ell Base Type Mogul(EX39) SUSTAI NABI LITY
Bulb Finish [fear Recycling Program Smartpacv 800451-2606
Natural White' Rated Life 26000 hours Picograms Hg per Mean lumen Hour 46
Operating Position Base Up±15° MR-Credit 4 Reduced Mercury in lamps 1 LEER paint
Dimming 70%Rated Power
PHOTOMETRIC NOTES
Initial Lumens 66000 Lamp performance ratings published in this date sheet are based on
operation with approved magnetic ballasts.Performance of position-rated
Scotopic lumens(5/P 2.1) 138500 lamps outside of their tolerances will result in poor performance.Minimum
lumens Per Watt 85 Starting Temperature:•40°U°F.To calculate nighttime Scotopic lumens,
Lump Lumen Depreciation(LID) .90(90%) 8000 hours multiply the lumen rating by the S/P ratio.—MD V3,MR CREDIT 4:
Sustainable Purchasing•Reduced Mercury in lamps is awarded 1 point for
Correlated Color Temperature 5000K projects which of least 90%of all mercury-containing lamps purchased
Chromaticity Coordinates(QE•x,y) 346 .359 during the performance period(amply and meet the target for mercury
content of 90 picograms per lumen-hour or less.
Color Rendering Index(CRI) 90+
PHYSICAL
Bulb Diameter 4.6'(120mm)
Max.Overall length(MOL) 11.5"(292mm)
Light Center Length(LW 7.r(178rmn)
Effective Arc Length 64.5 mm
Max.Base Temperature(°C) 250
Max.Bulb Temperature(°C) 450
Socket Pulse Rating(KY) 4
BU ±15° luminaire Type Open/Endosed Rated
Base Up
Spectral Distribution Lumen Maintenance
„" loo too
M I 90 5000K .m ' O or o■■■ww i- E
MI
t NMI
3
0
a 60
Dia. = 4.6"(120mm) a ■■ F' ,
MOL= 11.5"(292mm) oe z0
LCL= 7.0"(178mm) 10■�
Base= Mogul(EX39) 0.ill I I
300 350 400 450 500 550 600 650 700 750 :rs
Wavelength(nm) 6500 13000 14500 26030
Life Hours
(800) 451-2606 M _ to 1 r, + p
or (440) 248-3510
Fax: (800) 451-2605 THIS LAMP(WORMS TO FEDERAL STANDARD 21 CFA 1010.30 NOV 2 5 Z013
10295 Philipp Parkway Worming:This lamp roe rouse skin burn and eye inflammation from shortwave
Co
Streetsboro, Ohio 44241 USA ultraviolet radiation it outer envelope of the lamp is broken or punctured Do not use r:
E-mail: venture @acllt.com c:,
where people will remain for more than a lew minutes unless adequate shielding or y
other safety precautions are used.Lamps that will automatically extinguish when outer This Product is Recyclable Through SmartpAct) zi
VentureLighting.mom envelope is broken or punctured ore commercially ovaitable.
O
e?2010 Venture Lighting International Revision: 7/13/2010#2530-11
0 0
WLSLIGHTING SYSTEMS VERTICAL LAMP! FLAT GLASS LENS
, . ._ . ..- - .- - SPECIFICATIONS,..
- HOUSING-The FV Series formed aluminum housing is finished to produce a clean, sharp
appearance and ensures weather-tight construction.Available in 2 sizes:Medium(reduced
likenvelope 400 Watt Lamp)and Reduced(reduced envelope 1000 Watt Lamp).
LENS/GASKET-A flat tempered glass lens Is sealed to the housing with an EPDM gasket,
-r`� preventing entry of moisture,dust and insects.Combined with the vertical burn feature,the
flat glass lens provides high performance lighting.
TOP ACCESS-Is secured by four captive stainless steel fasteners and provides ease of
1 installation and servicing.
Flat-lensed fixtures meet IESNA
full cutoff classification FINISHES-Each fixture is finished with a baked-on polyester powder finishing process to
give the fixture an exceptionally attractive appearance.Standard finish colors include
DIMENSIONS bronze,buff,black,platinum,white green.The polyester finish withstands extreme weather
ARM MOUNT POLE TOP MOUNT changes without cracking or peeling.Consult factory for available custom colors and
A A pinstripe decal options.
1 I
J B -18 REFLECTORS/DISTRIBUTION PATTERNS-The FV Series fixture is available in five
JJ C reflector systems and distribution patterns,all with vertical burn lamps:Type II(2),Type III
L,,.J (3),Type V(5),Perimeter Forward Throw(FP)and Super Reflector(5R)for a minimum
1303mml
mounting height of 30 feet.Reflectors are field-rotatable,enabling generous flexibility in
A B c distribution patterns without fixture movement.
FYM An Want 71-5/51549mm) 12-3/4*(324mm) —
ROM Pole Top 21-5/r(549mm) 12-3/4'(324mm) , 21.15/16'(557mm1
FVR Arm Mount 21-5/e1549mm) 16.1/8*(410mm) — LIGHT SOURCES-Designed to operate with Pulse-Start Metal Halide,Natural White"",
FVWr Pole Top 21-5/81549mm) 16-1/8'(410mm) 2S'(63Smm) Super Metal Halide,Metal Halide,Metal Halide Reduce Envelope or High Pressure Sodium.
LUMINAIRE EPA CHART
FV SERIES FVM SERIES FVR SERIES I SOCKETS-Porcelain mogul-base sockets with spring-reinforced contacts.
Flat Lens 12-Bracket 12'Bracket
i Single 32 3.8 BALLAST- Pulse Start Metal Halide,Metal Halide,Super Metal Halide,and High Presure
or 4i D180' 63 7.6 Sodium feature a high-power factor CWA ballast,and are designed for-20°F operation.
16 090' 5.7 7.6
.1+ T90' _ 8.8 11.4 BRACKETS-Arm Mount:5 1/2"x 2 1/2"x 12"length shipped standard.(An 8"bracket
4:t TN120' 9.0 11.4 is avaiable for single or D180 configurations,but must be ordered separately from Options
a90' 113 15.2 column of the ordering chart.)A Round Pole Plate(RPP)is required for mounting to 3"-5"
■ Pole Top 3.2 4.0 round poles. (See Options in Luminaire Ordering Information.)
Note: House Side Shield adds to fixture EPA.Consult factory. Pole Top:Cast aluminum mounting hub conceals the wiring compartment and mounting
MOUNTING BRACKETS hardware(consisting of four 11/16"0.D.aluminum rods for medium fixtures and 7/8"O.D.
Pull Torr-4,,.NT BOLTONARM aluminum rods for large fixtures,and high-strength grade-five steel bolt with nylon insert
and split lock washer for double locking.)
Ifil k_l DECAL STRIPING-WLS offers optional color-coordinated decals in 9 standard colors to
Iaccent the fixture.Decal is guaranteed for five years against peeling,cracking,or fading.
C�5
li
LISTED PRE-SUBMITTAL REC'D
1 C 1 Li
�/ wet Vocation
NOV 2 5 2013
Approved By: Project Name: •
•
Location Date: WLS LIGHTING SYSTEMS
P.O.Box 100519 , Fort Worth,TX 76185 800.633.8711 Fax:817.735.4824 ' www.wlslighting.com • Consider the Impact!
Sner■hrminnt tuhierl rn rhanne wnho,n nnure 01 Rev.2/09
• a 0 III
■o11■s11111111111■■11■11x1111■11Nwr■■111111■■ e11ws■■■111r1111■■■r.
ltPP.00+ 10lI!■■■t■■■■■■11.■ 1111■11■1111.■■■■■■ 1111■►
11111111111■■111111.■ .■■■■111111.1111.■.■ ■ .►.
VERTICAL LAMP/ FLAT GLASS LENS11.11■�■■■.11■■■ ■ ■■�
.a■■■I■■111111■■■■■_■■_ 6111■
ERIE � . _...■...11..........■.. ;■.
01111111111111111111111111111
ORDERING INFORMATION SELECT APPROPRIATE CHOICE FROM EACH COLUMN TO FORMULATE ORDER CODE.Refer to example below.
LAMP LIGHT LINE LUMINAIRE
LUMINAIRE DISTRIBUTION WATTAGE SOURCE LENS VOLTAGE FINISH OPTIONS
FVM 2-Type it 250W PSMH Pulse-Start FG- Flat Glass 480V BRZ - Bronze LL Less
3 -Type III 320W Metal Halide MT Multi Tap' BLK - Black Lamp
FP- Perimeter 350W HPS High Pressure TT • Tri Tap 2 PLT - Platinum GS - Glare
Forward (PSMH onl ) Sodium
Y BUF - Buff Shield
Throw 400W
WHT -White BBK - El"Bracket
5 -Type V
GRN - Green RPP -Round
CC - Custom Pole Plate
250W NW - Natural White'"
320W Color BKT-WM-Wall
350W Mount Plate
400W
PT - Pole Top
FVR 2-Type II 400W MHR- Metal Halide SF - Single
3 -Type III 575W Reduced
FP•Perimeter (PSMH only) Envelope Fusing
Forward 750W 1000 Watt" C F Double
Throw (PSMH only) PSMH-Pulse-Start Fusing
5 -Type V 875W Metal Halide
(PSMH only) AS - Accent
AF- Automotive 1000W HPS- High Pressure
Forward Sodium t Striping
Throw (not available
in HPS) PC - Photo Cell
AI-Automotive NO - No Options
Interior 775W NW- Natural White'"
SR-Super Reflector
FV 5 1000 MH FG MT BRZ NO
(EXAMPLE ORDER)
ORDER:
WLS
FOOTNOTES: •In accordance with the 2007 Energy Independance and Security Act(EISA).fixtures will
1-When ordering pole top fixtures for tenon mounting,a pole top adaptor must be ordered. no longer be avaiable in Probe Start Metal Halide with wattages from 150 watts through
500 watts for new installations.Replacement parts for exisitng fixtures are still available.
2-Tri-Tap not available in 1000 Watt PSMH Voltage must be specified-120V,277V or 347V
3-For international voltages.consult factory.
4-MT-Multi Tap Is shipped standard unless otherwise specified.Multi Tap consists of 120V,209V,240V,and 277' Color Decals
Multi Tap is pre-wired for highest voltage.Alternate voltages will require field re-wiring. 45-Light Gold Metallic 55-Black
5-Tri-Tap is shipped standard for Canadian applications. Tn-Tap consists oft 20V,277V,and 347V. 20-Charcoal Metallic 50-White
Tri-Tap is pre-wired for highest voltage.Alternate voltages will require field re-wiring. 94-Blue Metallic 51 -Dark Red
6-An 8"bracket can only be ordered with single and D180"configurations. 59-Dark Green 700-Aztec Silver Metallic
7-On FVR/FVRPT photoelectric control can only be used with 400 Watt PSMH 21 -Tomato Red
ACCESSORY ORDERING INFORMATION (Accessories are field installed)
Description HOUSE SIDE SHIELDS BOTTOM VIEW
FVR/FVM 2 HSS-House Side Shield -
FVRPT/FVMPT 2 HSS-House Side Shield
FVR/FVM 3 HSS-House Side Shield
FVRPT/FVMPT 3 HSS-House Side Shield 4-5/15" — 5-318• —
FVRlFVMFPHSS House Side Shield (ltomm) (137mm)—I 4 ��1.'iIr�� �r1/If� 53/8"
If-2-5116" I 8
FVRPT/FVMPT FP HSS-House Side Shield (59mm)
FVR/FVRPT FA/AFT HSS-House Side Shield (137mm)
Pen!! TYPE III AND FORWARD THROW NIT 2 g 2 f1 WITH INTERNAL
1f �+ LI 0(1SE SIDE SHIELD
Approved By: Project Name: •
•
Location: Date: WLS L I G H T I N G SYSTEMS
P.O.Box 100519 Fort Worth,TX 76185 800.633.8711 Fax:817.735.4824 • www.wlslightinq.com W Consider the Impact!
Gateway Mall Redevelopment
Site Plan Review - Major Modification Pre-Application 11/15/13
F. Exhibit F: Photometric Test Reports for LiEht Sources
PRE-SUSM1UAi REC'D
NOV 2 5 2013
PAGE 23
BALZHISER HUBBARD ENGINEERS
• i
COOPER Lighting
Photometric Toolbox
IES ROAD REPORT
PHOTOMETRIC FILENAME : WLS-FVR-SR-775-NW-PSMH-FG.IES
DESCRIPTIVE INFORMATION (From Photometric File)
IESNA:
[ISSUEDATE]
[MANUFAC]WLS LIGHTING SYSTEMS
[LUMCAT] WLS-FVR-SR-775-NW-PSMH-FG
[LUMINAIRE] FV SERIES
[LAMPCAT] 775W/BU/BT37/PS/950
[LAMP] 1- 775W CLEAR NWPSMV BU
CHARACTERISTICS
IES Classification Type VS
Longitudinal Classification Short
Lumens Per Lamp 66000 (1 lamp) •
Total Lamp Lumens 66000
Luminaire Lumens 51699
Downward Total Efficiency 78 %
Total Luminaire Efficiency 78 % F
Luminaire Efficacy Rating (LER) 61 z`:'75.
Total Luminaire Watts 845 nal4enuofm..n mr.,rtswA
Ballast Factor 1.00 cueoKd4111ta■n
Upward Waste Light Ratio 0.00
Maximum Candela 31350.221
Maximum Candela Angle 45H 66V
Maximum Candela (<90 Degrees Vertical) 31350.221
Maximum Candela Angle (<90 Degrees Vertical) 45H 66V
Maximum Candela At 90 Degrees Vertical 0 (0.0% Lamp Lumens)
Maximum Candela from 80 to <90 Degrees Vertical 6593.196 (10.0% Lamp Lumens)
Cutoff Classification (deprecated) Full Cutoff
PRE-SUBM I RECD
NOV 2 5 2013
•
Photometric Toolbox Professional Edition-Copyright 2002-2011 by Lighting Analysts, Inc. Page 1
Calculations based on published IES Methods and recommendations,values rounded for display purposes.
Results derived from content of manufacturers photometric file.
• •
IES ROAD REPORT
PHOTOMETRIC FILENAME : WLS-FVR-SR-775-NW-PSMH-FG.IES
LUMINAIRE CLASSIFICATION SYSTEM (LCS)
Lumens % Lamp % Luminaire
FL- Front-Low (0-30) 1617.9 2.5 3.1
FM - Front-Medium (30-60) 8385.6 12.7 16.2
FH - Front-High (60-80) 15131.4 22.9 29.3
FVH - Front-Very High (80-90) 714.9 1.1 1.4
BL- Back-Low (0-30) 1617.9 2.5 3.1
BM - Back-Medium (30-60) 8385.6 12.7 16.2
BH - Back-High (60-80) 15131.4 22.9 29.3
BVH - Back-Very High (80-90) 714.9 1.1 1.4
UL- Uplight-Low (90-100) 0.0 0.0 0.0
UH - Uplight-High (100-180) 0.0 0.0 0.0
Total 51699.6 78.4 100.0
BUG Rating B5-U0-G5
PRE-SUBMITTAL RECD
Nov 2 5 2013
Photometric Toolbox Professional Edition-Copyright 2002-2011 by Lighting Analysts. Inc. Page 2
Calculations based on published IES Methods and recommendations.values rounded for display purposes.
Results derived from content of manufacturers photometric file.
•
. .
IES ROAD REPORT
PHOTOMETRIC FILENAME : WLS-FVR-SR-775-NW-PSMH-FG.IES
CANDELA TABULATION
Vert. Horizontal Angles
Angles
0 5 10 15 20 25 30 35 40 45
0 3912.975 3912.975 3912.975 3912.975 3912.975 3912.975 3912.975 3912.975 3912.975 3912.975
1 3925.410 3943.648 3952.767 3937.016 3932.042 3952.767 3959.400 3950.280 3959.400 3966.032
2 3947.793 3946.135 3952.767 3943.648 3941.161 3959.400 3963.545 3955.255 3959.400 3959.400
3 3920.436 3909.658 3916.291 3920.436 3920.436 3929.555 3929.555 3937.016 3941.161 3947.793
4 3857.430 3818.466 3825.098 3830.073 3845.824 3849.969 3870.694 3868.207 3875.669 3891.420
5 3729.761 3711.523 3702.403 3718.984 3743.854 3743.854 3752.974 3748.000 3754.632 3766.238
6 3593.802 3563.957 3568.931 3582.196 3593.802 3622.818 3655.149 3657.636 3655.149 3661.781
7 3389.034 3379.915 3386.547 3439.604 3450.381 3471.107 3509.242 3525.822 3523.335 3507.584
8 3225.717 3220.743 3246.442 3272.971 3314.422 3357.531 3404.785 3423.024 3412.246 3416.392
9 3143.644 3141.986 3141.986 3195.872 3271.313 3314.422 3370.795 3409.759 3404.785 3413.904
10 3057.426 3082.296 3118.773 3185.095 3241.468 3326.028 3369.137 3407.272 3412.246 3439.604
11 3039.187 3050.794 3141.986 3214.111 3264.681 3352.557 3427.998 3505.097 3505.097 3498.464
12 3071.519 3075.664 3107.167 3209.966 3293.697 3459.501 3554.838 3659.294 3646.030 3568.931
13 3125.405 3116.286 3098.048 3134.525 3280.432 3554.838 3766.238 3909.658 3849.969 3714.010
14 3121.260 3130.380 3109.654 3071.519 3220.743 3534.941 3966.032 4238.779 4077.120 3820.953
15 3130.380 3132.867 3093.903 3044.162 3152.763 3541.574 4100.333 4515.672 4254.531 3873.182
16 3166.856 3143.644 3103.022 3039.187 3107.167 3525.822 4140.955 4475.050 4052.250 3714.010
17 3238.981 3216.598 3157.737 3082.296 3130.380 3588.828 4198.157 4484.169 3947.793 3664.269
18 3298.671 3275.458 3241.468 3203.333 3246.442 3689.139 4257.018 4395.464 3995.877 3736.393
19 3348.412 3339.293 3330.173 3307.790 3339.293 3839.192 4313.391 4339.091 4086.240 3784.476
20 3493.490 3439.604 3413.904 3370.795 3455.355 4023.234 4324.997 4268.624 4122.717 3809.347
21 3498.464 3527.480 3471.107 3457.013 3588.828 4227.173 4227.173 4204.790 4018.260 3814.321
22 3502.610 3518.361 3511.729 3573.076 3772.870 4374.739 4086.240 4189.038 4061.369 3868.207
23 3507.584 3527.480 3557.325 3677.533 3922.923 4570.387 3913.804 4243.753 4198.157 4063.856
24 3566.444 3568.931 3612.040 3754.632 4086.240 4729.559 3757.119 4216.396 4407.070 4411.216
25 3639.398 3634.424 3673.388 3836.705 4275.256 4681.476 3702.403 4232.147 4690.595 4358.987
26 3720.642 3704.890 3732.248 3893.907 4429.454 4529.765 3766.238 4270.282 5058.680 4331.630
27 3875.669 3780.331 3806.860 3934.529 4404.583 4254.531 3898.052 4243.753 4843.135 4259.505
28 4052.250 3888.933 3916.291 4007.483 4236.292 4236.292 4032.353 4164.168 4597.745 4306.759
29 4111.939 3986.757 3966.032 3995.877 4208.935 4208.935 4113.597 4054.737 4441.060 4377.226
30 4152.561 4109.452 4041.473 4063.856 4238.779 4313.391 4291.008 4113.597 4413.703 4252.044
31 4315.878 4227.173 4159.193 4179.919 4348.210 4527.278 4545.517 4254.531 4313.391 4216.396
32 4579.507 4320.852 4270.282 4302.614 4499.921 4377.226 4382.200 4377.226 4318.365 4245.412
33 4543.030 4400.438 4388.832 4402.096 4488.314 4514.014 4456.812 4470.905 4409.558 4334.117
34 4584.481 4511.527 4490.801 4524.791 4509.040 4520.646 4557.123 4561.268 4543.030 4420.335
35 4674.844 4627.590 4649.973 4715.466 4643.341 4659.093 4670.699 4665.725 4661.580 4549.662
36 4788.420 4784.275 4815.777 4908.628 4804.171 4819.922 4831.529 4800.026 4804.171 4683.963
37 4906.970 4935.985 4981.581 5104.276 4993.188 4974.949 4979.094 4960.856 4990.701 4827.384
38 5029.664 5126.660 5158.992 5292.464 5174.743 5143.240 5154.017 5131.634 5192.981 5002.307
39 5211.220 5299.925 5319.821 5472.361 5367.905 5322.309 5327.283 5310.702 5415.159 5177.230
40 5411.014 5499.719 5481.480 5687.906 5549.460 5506.351 5508.838 5474.848 5638.165 5411.014
41 5565.211 5665.523 5669.668 5881.068 5754.228 5740.135 5711.119 5644.797 5939.928 5629.046
42 5801.482 5860.343 5892.674 6058.478 5960.654 5976.405 5929.151 5887.700 6135.577 5831.327
43 6010.395 6070.085 6113.194 6246.666 6185.318 6199.412 6167.080 6156.303 6380.967 6051.846
44 6260.759 6224.282 6337.858 6433.195 6448.947 6412.470 6387.599 6448.947 6642.108 6322.107
45 6369.361 6362.729 6537.652 6753.197 6734.959 6703.456 6619.725 6691.850 6943.872 6699.311
46 6533.507 6587.393 6725.839 7096.411 6991.955 7012.680 6814.545 6846.876 7239.832 7221.593
47 6841.902 6896.618 6851.021 7378.278 7114.650 7432.994 6987.810 7105.531 7575.585 7820.975
48 7345.946 7357.553 7050.815 7748.021 7139.520 7780.353 7225.739 7503.460 8029.888 8679.840
49 7678.383 7703.254 7151.127 8255.381 7209.987 8168.334 7507.605 7839.213 8354.864 9828.861
50 7891.442 7927.918 7069.054 8545.538 7248.951 8516.523 7752.995 7896.416 8486.678 10447.310
51 7737.244 8023.256 6846.876 8520.668 7425.532 9029.686 8019.111 7839.213 8402.947 10444.823('1D
52 7464,496 7975.173 6746.565 8493.310 7757.140 9874.457 8464.294 7746.363 8100.355 10074.251'1
NOV 2 5 2013
Photometric Toolbox Professional Edition-Copyright 2002-2011 by Lighting Analysts, Inc. Page 3
Calculations based on published IES Methods and recommendations,values rounded for display purposes.
Results derived from content of manufacturers photometric file.
i •
IES ROAD REPORT
PHOTOMETRIC FILENAME : WLS-FVR-SR-775-NW-PSMH-FG.IES
CANDELA TABULATION - (Cont.)
53 7078.173 7791.959 6708.430 8382.221 8280.252 10831.1478929.375 7680.041 7989.266 9570.207
54 6742.420 7771.234 6662.834 8343.258 8532.274 11828.4589754.250 7752.995 7780.353 9136.630
55 6501.175 8032.375 6489.569 8511.549 8986.577 12834.88810662.8567775.379 7771.234 9070.308
56 6378.480 7759.627 6378.480 9265.957 9974.769 14661.21911530.8407952.789 7986.779 9340.569
57 6482.937 7664.290 6323.765 10585.75711900.58216782.68112818.30::238.801 8800.048 9813.110
58 7160.246 8148.438 6810.399 12645.87114163.80718302.27513952.4078729.581 9294.973 10333.735
59 8363.983 9190.516 8159.215 14250.02516657.49919263.10915519.2559740.985 10260.78111064.930
60 10036.11611534.98510297.25816325.89119315.33820548.91917414.39510788.03811952.81112941.003
61 12657.47814618.11011264.72416751.17920928.61020887.15919136.26911864.93513910.95616355.736
62 15192.62116123.61012302.65718298.13022838.67321825.61020649.23114376.86518166.31622323.022
63 15597.18317866.21114313.03120426.22425542.10723209.24521948.30516282.78220221.45625469.153
64 16282.78219969.43415628.68521039.69926282.42223108.93322738.36117396.15621280.11528876.425
65 16936.87920616.89916191.59020560.52625984.80422643.02423061.67918367.76822268.30731175.298
66 17109.31520771.09716257.91219885.70325644.07622429.96623142.92319394.92323006.96431350.221
67 16964.23720430.36916267.03119238.23924821.68921846.33622773.18019778.76022089.23930966.385
68 16455.21819981.04115598.84118327.14623970.28520803.42822372.76319599.69121598.45930560.165
69 15610.44719342.69515015.21117786.62522604.88920021.66321784.98819404.04321062.08329489.900
70 13838.83118286.52414204.42916960.09220727.98818631.39621039.69918990.36220124.46127710.823
71 12166.69817084.44512977.47915526.71618474.71115985,16420337.51918367.76818872.64125530.501
72 10849.38515496.87111675.91813949.92015708.27113513.85519374.19817546.20917032.21622992.870
73 9609.171 13597.58610072.59312713.85113027.22110948.86718192.84416507.44715033.44919956.170
74 8404.605 11482.7568225.537 11219.12810344.5128532.274 17016.46515426.40512968.36016337.498
75 7050.815 9170.619 6492.056 9879.432 7700.767 6419.931 15912.21013915.93010676.12012927.738
76 5856.197 6942.214 5131.634 8993.209 5674.642 4811.632 14667.85112016.6458473,414 9670.519
77 5178.888 5356.298 4070.488 8019.111 4095.359 3334.319 13134.16410233.4236353.609 6503.662
78 4733.704 3763.751 3016.804 6955.478 2864.264 2271.515 11494.3638702.223 4934.327 4420.335
79 3952.767 2773.901 2510.273 5876.923 2262.396 1735.139 10119.8477442.113 3650.175 2921.467
80 3039.187 2305.505 2153.794 4963.343 1751.719 1344.670 6549.258 6262.417 2698.460 2312.137
81 2498.666 1894.311 1715.242 4227.173 1415.137 1081.042 6383.454 5318.163 2144.675 1894.311
82 2058.457 1526.226 1356.277 3500.123 1178.866 901,974 5992.157 4497.434 1762.497 1549.438
83 1690.372 1315.655 1027.156 2719.186 915.238 708.812 4813.290 3609.553 1544.464 1285.810
84 1294.929 1149.022 808.295 2060.115 708.812 574.511 3775.357 2793.797 1301.561 1101.768
85 921.870 1006.430 579.485 1451.614 586.117 451.816 2623.848 1874.414 938.451 887.880
86 663.216 785.911 408.707 935.964 460.935 344.872 1524.568 1090.161 660.729 633.371
87 472.541 490.780 304.250 506.531 324.976 261.141 852.233 597.723 447.671 433.577
88 318.344 286.012 206.426 254.509 202.281 188.188 413.681 336.582 258.654 281.867
89 154,198 143.420 129.327 143.420 138.446 126.840 184.042 188.188 145.079 168.291
90 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
Vert. Horizontal Angles
Angles
50 55 60 65 70 75 80 85 90
0 3912.975 3912.975 3912.975 3912.975 3912.975 3912.975 3912.975 3912.975 3912.975
1 3947.793 3941.161 3947.793 3946.135 3929.555 3922.923 3913.804 3927.897 3929.555
2 3955.255 3955.255 3950.280 3947.793 3932.042 3925.410 3922.923 3920.436 3934.529
3 3934.529 3941.161 3938.674 3932.042 3922.923 3911.316 3916.291 3913.804 3925.410
4 3888.933 3900.539 3909.658 3907.171 3909.658 3902.197 3902.197 3900.539 3893.907
5 3750.487 3780.331 3805.202 3820.953 3848.311 3849.969 3861.575 3857.430 3852.456
6 3652.662 3670.901 3691.626 3702.403 3732.248 3716.497 3725.616 3725.616 3725.616
7 3489.345 3505.097 3536.599 3553.180 3596.289 3597.947 3588.828 3566.444 3561.470 �n
8 3391.521 3394.008 3404.785 3389.034 3400.640 3357.531 3332.660 3321.054 3302.816•..SUBMi l l RECD
9 3394.008 3386.547 3373.282 3326.028 3264.681 3182.608 3123.747 3082.296 3066.545
10 3395.666 3375.770 3350.899 3300.329 3212.453 3143.644 3059.913 2980.327 2962.089 NOV 2 5 2013
11 3407.272 3366.650 3348.412 3268.826 3185.095 3114.628 3032.555 3011.830 3016.804
12 3416.392 3352.557 3369.137 3300.329 3191.727 3137.012 3084.784 3098.048 3093.903
13 3477.739 3434.630 3480.226 3364.163 3234.836 3155.250 3191.727 3209.966 3212.453
Photometric Toolbox Professional Edition-Copyright 2002-2011 by Lighting Analysts, Inc. Page 4
Calculations based on published IES Methods and recommendations,values rounded for display purposes.
Results derived from content of manufacturers photometric file.
• Y . •
IES ROAD REPORT
PHOTOMETRIC FILENAME : WLS-FVR-SR-775-NW-PSMH-FG.IES
CANDELA TABULATION - (Cont.)
14 3591.315 3559.812 3616.185 3413.904 3248.100 3225.717 3280.432 3305.303 3316.909
15 3745.512 3736.393 3728.103 3484.371 3262.194 3323.541 3357.531 3370.795 3379.915
16 3666.756 3777.844 3832.560 3616.185 3360.018 3430.485 3498.464 3539.086 3557.325
17 3609.553 3854.943 3875.669 3728.103 3500.123 3596.289 3728.103 3811.834 3806.860
18 3646,030 3927.897 3986.757 3780.331 3607.066 3711.523 3975.151 4111.939 4352.355
19 3714.010 3947.793 4072.975 3806.860 3704.890 3714.010 4015.773 4339.091 4533.911
20 3784.476 3986.757 4111.939 3920.436 3750.487 3675.046 3820.953 4048.105 4070.488
21 3772.870 3959.400 4077.120 3961.887 3802.715 3666.756 3716.497 3754.632 3720.642
22 3870.694 4029.866 4045.618 4018.260 3918.778 3741.367 3728.103 3793.596 3752.974
23 4104.478 4232.147 3966.032 4145.929 4173.287 3920.436 3793.596 3825.098 3820.953
24 4493.289 4417.848 3909.658 4388.832 4456.812 4063.856 3879.814 3870.694 3888.933
25 4615.983 4592.771 3823.440 4732.046 5236.090 4309.246 3966.032 3866.549 3852.456
26 4472.563 4627.590 3797.741 4588.626 5381.169 4254.531 3956.913 3845.824 3743.854
27 4216.396 4511.527 3929.555 4223.028 4926.866 4045.618 3909.658 3830.073 3815.979
28 4000.022 4284.375 4048.105 4086.240 4077.120 4023.234 3961.887 3946.135 3947.793
29 4032.353 4052.250 4093.701 4106.965 4048.105 4014.115 4045.618 4054.737 4097.846
30 4091.214 4136.810 4247.899 4161.681 4136.810 4097.846 4138.468 4173.287 4174.945
31 4182.406 4245.412 4416.190 4247.899 4216.396 4189.038 4213.909 4270.282 4275.256
32 4266.137 4379.713 4322.510 4313.391 4304.272 4279.401 4313.391 4370.594 4407.070
33 4320.852 4354.842 4373.081 4386,345 4407.070 4373.081 4416.190 4490.801 4529.765
34 4411.216 4438.573 4443.547 4472.563 4481.682 4493.289 4515.672 4588.626 4652.460
35 4518.159 4527.278 4532.252 4554.636 4600.232 4622.616 4643.341 4732.046 4802.513
36 4638.367 4638.367 4634.222 4679.818 4732.046 4751.943 4788.420 4926.866 4960.856
37 4785.933 4775.155 4767.694 4818.264 4872.980 4890.389 4947.591 5120.028 5165.624
38 4947.591 4920.234 4911.115 4942.617 5036.297 5049.561 5081.893 5340.547 5392.775
39 5129.147 5108.421 5097.644 5097.644 5181.375 5204.588 5251.842 5622.414 5656.404
40 5322.309 5292.464 5265.935 5299.925 5328.941 5358.785 5467.387 5926.664 6046.872
41 5510.496 5474.848 5426,765 5454,123 5445.004 5483.967 5656.404 6208.531 6123.971
42 5697.026 5674.642 5592.569 5629.046 5606.662 5660.549 5933.296 6387.599 6323.765
43 5908.426 5886.042 5742.622 5745.109 5769.979 5912.571 6280.656 6594.854 6519.413
44 6190.293 6148.842 5924,177 5929.151 5990.499 6219.308 6630.502 6819.519 6896.618
45 6535.165 6494.543 6194.438 6148.842 6298.894 6676.098 6991.955 7127.914 7259.728
46 6869.260 6758.171 6469.672 6451.434 6669.466 7319.418 7418.900 7571.440 7841.700
47 7264.702 7093.924 6778.068 6841.902 7075.686 7989.266 7730.612 8164.189 8504.916
48 7634.445 7685.016 7166.878 7250.609 7451.232 8538.906 7993.411 8732.068 9186.371
49 7875.690 8054.759 7480.248 7589.678 7532.476 8664.088 8007.504 9111.759 9767.514
50 7900.561 8189.060 7553.201 7805.224 7403.149 8499.942 7801.078 9165.645 9508.860
51 7816.830 8152.583 7746.363 8179.941 7330.195 8345.745 7443.771 8993.209 8972.484
52 7593.823 7930.406 8082.116 8829.892 7480.248 8182.428 7092.266 8711.342 8477.559
53 7495.999 7898.074 8548.025 9517.979 7670.922 7927.918 6792.161 8425.330 7909.680
54 7575.585 7816.830 9211.241 10803.7898198.179 7784.498 6487.911 8179.941 7373.304
55 7861.597 7675.896 10299.74512455.1978747.819 7750.508 6403.351 7961.908 7101.386
56 8307.610 7416.413 12007.52614495.4158931.862 7830.094 6558.377 7836.726 7050.815
57 8482.533 7298.692 13777.48416662.4739367.926 8091.235 6694.337 7648.539 7246.464
58 9018.080 7282.941 15712.41718304.76210982.8579379.533 6608.119 7741.389 8091.235
59 9572.694 8039.007 17434.29119796.99813944.94611709.9087055.789 8152.583 8918.597
60 10063.4749382.020 18777.30421330.68517443.41014190.3368611.860 9449.999 9895,183
61 12102.86310674.46220238.03723497.74422064.36818222.68911230.73412007.52611003.583
62 14744.95012157.57921166.53923970.28524551.428 20392.23514610.64915926.30413238.621
63 64 20950.99416139.36222807.1170217727.78626586.672211144.15616339.98519653.57816396.35 i.� l� �, �f��.
I
65 21739.39217116.77622856.91120435.34427059.21421455.03816969.21119704.14816478.431
66 22068.51318027,04022807.17018918.23726463.97721432.65517157.39819898.96816537.291\1OV 2 5 2013
67 21939.18 618615.64522915.77117475.74225614.23220503.32316698.12119906.42916727.966
68 21400.32319199.27522861.05616301.02124290.28719076.58016291.90119268.08316519.053
69 20810.06119088.18622747.48015217.49222807.17017993.05115331.06718468.07915696.665
Photometric Toolbox Professional Edition-Copyright 2002-2011 by Lighting Analysts, Inc. Page 5
Calculations based on published IES Methods and recommendations,values rounded for display purposes.
Results derived from content of manufacturers photometric file.
i •
IES ROAD REPORT
PHOTOMETRIC FILENAME : WLS-FVR-SR-775-NW-PSMH-FG.IES
CANDELA TABULATION - (Cont.)
70 19942.07718797.20022197.84014017.90020496.69116839.05514109.09217484.86114324.637
71 18729.22017977.29921718.66712695.61317445.89715328.58012639.23916251.28012943.490
72 17280.09316925.27321089.44011137.88414615.62313513.85510996.95114397.59111507.627
73 15508.47815683.40119990.1609429.274 12101.20511755.5049309.066 12277.78710517.777
74 13213.75014497.07318499.5827927.918 9765.856 10060.9877707.399 10144.7189836.323
75 10815.39512893.74816857.2936076.717 7512.579 8468.440 6258.272 7971.028 9036.318
76 8470.927 11123.79115098.9424113.597 5221.997 6943.872 4815.777 5901.794 8087.090
77 6194.438 9865.338 13656.4472991.933 3578.050 6051.846 3302.816 3920.436 6687.705
78 4352.355 8102.842 12436.9582439.806 2986.959 5383.656 2732.450 2750.688 5192.981
79 3105.509 6494.543 11350.9421987.990 2448.925 4588.626 2323.743 2207.680 4211.422
80 2346.956 5399.407 6593.196 1560.216 1871.927 4104.478 1810.580 1771.616 3357.531
81 1921.668 4592.771 6538.481 1185.499 1526.226 3529.967 1374.515 1467.365 2612.242
82 1633.169 3911.316 6485.424 867.984 1187.986 2980.327 1071.923 1271.717 1939.907
83 1455.759 3266.339 5660.549 702.180 999.798 2468.822 904.461 1160.628 1444.982
84 1237.727 2419.080 4208.935 549.640 763.527 1905.917 729.538 1122.493 1095.135
85 969.953 1424.256 2594.004 441.039 583.630 1417.624 588.604 988.192 840.626
86 742.802 808.295 1369.541 344.872 415.339 844.771 417.826 729.538 554.614
87 463.422 451.816 659.071 249.535 258.654 353.992 275.235 411.194 358.966
88 290.986 240.416 297.618 181.555 179.068 206.426 165.804 231.297 249.535
89 150.053 134.301 134.301 122.695 122.695 129.327 113.576 122.695 126.840
90 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0000
PRE-SU8MTJA RECD
Nov 2 5 2013
Photometric Toolbox Professional Edition-Copyright 2002-2011 by Lighting Analysts. Inc. Page 6
Calculations based on published IES Methods and recommendations,values rounded for display purposes.
Results derived from content of manufacturers photometric file.
• •
IES ROAD REPORT
PHOTOMETRIC FILENAME : WLS-FVR-SR-775-NW-PSMH-FG,IES
COEFFICIENTS OF UTILIZATION
1.0
0.9
0.8
0.7
0.6
Coeff_ ---
Of 1
Utiliz. 0.5
SS
0.4 — HS
0.3
0.2
I
0.1
0.0 0 1 2 3 4 5
Street Width/Mounting Height
FLUX DISTRIBUTION
Percent
Lumens Of Lamp
Downward Street Side 25849.7 39.2
Downward House Side 25849.7 39.2
Downward Total 51699.4 78.3
Upward Street Side 0.0 0.0 �s� 1 ��
Upward House Side 0.0 0.0 1 i
Upward Total 0.0 0.0 NOV 2 5 2013
Total Flux 51699.4 78.3
Photometric Toolbox Professional Edition-Copyright 2002-2011 by Lighting Analysts, Inc. Page 7
Calculations based on published IES Methods and recommendations,values rounded for display purposes.
Results derived from content of manufacturers photometric file.
• •
IES ROAD REPORT
PHOTOMETRIC FILENAME : WLS-FVR-SR-775-NW-PSMH-FG.IES
POLAR GRAPH
1
T2351
11156
114■ 14 I I k Aro
8 :
err-4
� I
74411", -,
r
4111*
Maximum Candela = 31350.221 Located At Horizontal Angle =45,Vertical Angle=66
# 1 -Vertical Plane Through Horizontal Angles (45 -225) (Through Max. Cd.)
# 2 - Horizontal Cone Through Vertical Angle (66) (Through Max. Cd.)
PRE-SUBM I1AI REC'D
NOV 252013
Photometric Toolbox Professional Edition-Copyright 2002-2011 by Lighting Analysts, Inc. Page 8
Calculations based on published IES Methods and recommendations,values rounded for display purposes.
Results derived from content of manufacturers photometric file.
• • !
IES ROAD REPORT
PHOTOMETRIC FILENAME : WLS-FVR-SR-775-NW-PSMH-FG.IES
ISOFOOTCANDLE LINES OF HORIZONTAL ILLUMINANCE
3
•
.5
2
I House
Side
0
r I Street
Side
1 :
1 •
1.75 ; •
2 --
2.75
3
•
4
5 0 1 2 2.25 3 3.75 4 5 6 7
Distance In Units Of Mounting Height
Values Based On 45 Foot Mounting Height
1/2 Maximum Candela Trace Shown As Dashed Curve
(+) = Maximum Candela Point
PRE-SUBMITTAL REC'D
NOV 2 5 2013
Photometric Toolbox Professional Edition-Copyright 2002-2011 by Lighting Analysts, Inc. Page 9
Calculations based on published IES Methods and recommendations,values rounded for display purposes.
Results derived from content of manufacturers photometric file.
• •
IES ROAD REPORT
PHOTOMETRIC FILENAME : WLS-FVR-SR-775-NW-PSMH-FG.IES
LUMINAIRE CLASSIFICATION SYSTEM (LCS) GRAPH
Luminaire Lumens Uplight
15
11
756.
100 3 : 100
90 - 90
80 80
. Ad"' 111P
sa 11, 60
30 30
Back 0 Front
Luminaire Lumens:
Front: Low=1617.9, Medium=8385.6, High=15131.4,Very High=714.9 .s� �`j � t{ r
Back: Low=1617.9, Medium=8385.6, High=15131.4, Very High=714.9 iV�
Uplight: Low=0.0, High=0.0
NOV 2 5 2013
BUG Rating : B5-U0-G5
Photometric Toolbox Professional Edition-Copyright 2002-2011 by Lighting Analysts,Inc. Page 10
Calculations based on published IES Methods and recommendations,values rounded for display purposes.
Results derived from content of manufacturers photometric file.