HomeMy WebLinkAboutStudies ENG 12/11/2009 1
1
1
TRIP GENERATION STUDY
FOR
' PROPOSED RELIEF NURSERY
Springfield, Oregon
October 1, 2009
Prepared for:
RELIEF NURSERY
1720 West 25th Avenue
Eugene, Oregon 97405
Phone (541)343-9706
Prepared by:
BRANCH ENGINEERING, INC.
310 Fifth Street
' Springfield, Oregon 97477
Phone (541) 746-0637
Fax (541) 746-0389
Project No. 09-138
' L Date Received:
1 DEC 11299
Original Submittal_-
,
J • • L
1
Z -; 0 N_ Ur W !—
W
40 ` \ Jia7�l US' Pu 0 IL �fj��� w W
Qy w D
�. \ • / St-co g4 2p04 0 N
NN . , \ / a C
• Ca O
I O
• V1 �� I �
I: .. w
-8 co . + , ___ . .
r1
ici
N ' .
Q M
O • -
JO ij
.1 Gam` 0 00
\ J , a)
\ Q) CV
\
c-- E E
• . . . . S-BUS-40
:
o PASHTO 2004 (US) coz
55.
C
wa / j
OO
�' 000d-
1 000 •
w p a) coco coro
co
w oo
Lti
MI {it] 0 I 0Q
01 al IN
� a
J ;
1
,\I •
n ■ g o
En r
el CD ea cn
.N Y N T,
qa 5 a
,may P .- 0 ,i�
M ti e U w�
V r0 Y 6 °
.pp en .— En h q v
• Gi y °
W q a
14 0 o
\ \ -co
[7 m
oe
9
CC$ m
4 ' t m
o
y o
r1 N 7:1:: I i u
U
cri ososlo e+aaoA1
'uoµeee'WV 6C':[906002IEIIII'6+WN&11.O111V el 80 •96 p b1G§0\9002\'!
EThAi Qonio v tit-BO\OMO tram olnv\ouive1\/'ainN la'PN )I _90\8002\:Z :Nwou bm.mAQ
•
I
i
I
TRIP GENERATION STUDY
FOR
' PROPOSED RELIEF NURSERY
Springfield, Oregon
October 1, 2006
Prepared by:
<c%0 PR Ores
N
� 5 r
'3
#62780P. . fl'Prat
Tr ORE •N
09 a Y 13. t ��
/FN G\ F
EXPIRES- JUNE 30, 2011
i
BRANCH ENGINEERING, INC.
310 Fifth Street
Springfield, Oregon 97477
Phone (541) 746-0637
Fax (541) 746-0389
I
1 Date Received: .
DEC 1 1 2CC9
IOriginal Submiitai —
i
Relief Nursery, Springfield, Oregon
Trip Generation Study
INTRODUCTION
The purpose of this report is to document the trip generation study performed for the
Relief Nursery proposed in Springfield Oregon. The representative sample site was the
existing Relief Nursery in west Eugene near the intersection of 25th Avenue and
Chambers Street. This study has been prepared due to the unique nature of this land
use and the lack of accurate published data necessary to project site generated traffic.
' This information will be useful for establishing a trip generation rate to apply to the
proposed new facility so accurate transportation systems development charges can be
' assessed, and for determining if a Traffic Impact Study will be required by Springfield
Development Code. The typical traffic consists of Relief Nursery families, staff and
volunteers. The Relief Nursery is a non-profit program that strengthens high risk
' families and keeps their vulnerable young children safe and healthy. This report strives
to establish an accurate local trip generation rate to apply to the proposed
' development in Springfield, Oregon.
' Included in this report are summaries of the observed daily site generated traffic at the
existing nursery, and projected average daily trip generation rates for a proposed
development.
' SURVEYED SITES
' Vehicle traffic counts were performed by Branch Engineering, Inc. staff during the
months of August of 2009, between the hours of 8:45 AM and 4:15 PM. The counts
were taken two consecutive days at Relief Nursery in Eugene. The counts were within
12-percent of one-another, which was considered reasonably close to expected day-
to-day fluctuations, so no further observations were considered necessary to establish
confidence in the data. Relief Nursery officials have indicated they were at or near full
attendance at the time of observation.
' The client supplied some information regarding number of students enrolled (60), the
' total number of classrooms (6) and the existing Relief Nursery building size (14,000
square foot).
A summary of the observed volumes for each day is included in this report (see
Appendices).
' ; Date Received:
Branch EngineerirVg 'l'nc. -1;14°11 of 3
Original Submittai____._.__
I
IRelief Nursery, Springfield, Oregon
Trip Generation Study
' The following table summarizes the observed site generated traffic at the existing
surveyed Relief Nursery in Eugene:
I
IOBSERVED TRIP GENERATION (Daily)
Surveyed Site Date NuUnits of Ave rap Daily Average Rate per Unit
August 11,
' Relief Nursery
14,000 Sq. Ft. 248 17.71 per Sq. Ft.
1720 West 25th Ave, Eugene 2009
60 Students 248 4.13 per Student
I14,000 Sq. Ft. 220 15.71 per Sq. Ft.
Relief Nursery August 12,
1720 West 25th Ave, Eugene 2000 t 9
60 Students 220 3.67 per Student
I
Based on the above data, the existing Relief Nursery generates a daily average rate of
I 16.71 and 3.90 total vehicle trips per 1000 square feet of gross floor area and student,
respectively.
IPROPOSED DEVELOPMENT
IThe proposed Relief Nursery will include 15,088 square feet of gross floor area and it
would be an additional full-service site located in Springfield. The projected enrollment
' is 50 students.
TRIP GENERATION
The trip generation rates established herein were applied to the applicable variables
for the proposed new facility.
IThe following table lists the proposed development variables and the associated
projected site generated traffic:
IDate Received:
I DEC 1 1 2009 4
Blanch Engineering, Inc. -Page 2 of 3
Original Submittal
1
' Relief Nursery, Springfield, Oregon
Trip Generation Study
PROJECTED TRIP GENERATION (Daily)
Land Use Number of Average Rate Average Daily Trips
Units per Unit
' 16.71 Trips per 252.12
15,088 Sq. Ft. 1,000Sq.Ft.
' Proposed Relief Nursery,
Springfield 3.90 Trips per
50 Students Student 195.0
' Average Daily Trips - - 223.56
CONCLUSION
Based on the study performed herein, the projected site generated traffic associated
' with the new Relief Nursery in Springfield is 224 average new daily vehicle trips.
Therefore, based on Springfield Development Code Section 4.2-105(4), a Traffic
Impact Study should not be required by the City of Springfield for this project, as the
' proposed development will not generate more than 500 daily vehicle trips, there is not
a request for a variance from the transportation provision in code, and there were no
known street capacity or safety concerns at the Development Issues meeting.
1
' F Date Received:
DEC 1 1 2g09
U09
Original
1
Branch Engineering, Inc. - Page 3 of 3
1
i
1
1
1
•
1
1
I
1
1
Date Received:
1 DEC I 1 2909
1 Original Submittal
1
1 APPENDICES
1
1
I
I RELIEF NURSERY
8/11/2009
TRAFFIC COUNTS 9:00AM TO 4:00PM
HOUR STAFF STUDENTS Visitors /Other BUS TOTAL
IN OUT IN OUT IN OUT IN OUT
' Before
9:00 AM 26 1 27
I 9:00
to 7 19 17 1 1 2 47
I10:00 AM
10:00
I
to 2 1 8 11 2 2 1 2 29
11:00 AM
I 11:00
to 4 6 7 2 3 3 1 26
I12:00 PM
12:00
IIto 5 9 11 14 2 2 2 4 49
1:00 PM
' 1:00
to 10 17 2 29
I2:00 PM
2:00
I to 4 5 1 2 3 1 16
I 3:00 PM
3:00
to 2 6 1 9
4:00 PM
IAfter 16 16
4:00 PM
ITOTAL 60 60 47 44 11 11 9 6 248
IGarbage Truck In/Out at around 9:30 AM Date Received:In/Out before 9:00 AM and 3:00 PM f
DEC 1 1 2039
IOriginal bu,rriittal
I
I RELIEF NURSERY
8/12/2009
' TRAFFIC COUNTS 9:00AM TO 4:00PM
HOUR STAFF STUDENTS Visitor /Other BUS TOTAL
IN OUT IN . OUT IN OUT IN OUT
Before
I
9:00 AM 35 35
9:00
to 4 7 12 13 2 1 1 40
10:00 AM
10:00
to 5 10 2 1 1 2 2 1 24
11:00 AM
11:00
to 5 3 5 4 2 2 21
'
12:00 PM
12:00
I to 2 6 18 17 3 46
1:00 PM
' 1:00
to 4 7 1 2 14
2:00 PM
I 2:00
' to 1 9 3 1 1 15
3:00 PM
' 3:00
to 2 5 1 2 2 12
4:00 PM
I After
4:00 PM 13 13
' TOTAL 58 60 _ 40 38 7 7 6 4 220
Vehicles parked on-street(3) "walking in/out" Relief nursery between 11AM and 1PM.
I
One vehicle parked in parking lot carrying a bicycle and then went ouside with his bike (leaving car in
the parking lot). r r Date Received:
I One mail truck went in/out at 11:00 AM
r 1 1 2009
IOriginal Subrnii:ai
1
1
I
1
1
1
1
1
I
1
1
1
I
1
1
1
1
1
1