Loading...
HomeMy WebLinkAboutStudies ENG 12/11/2009 1 1 1 TRIP GENERATION STUDY FOR ' PROPOSED RELIEF NURSERY Springfield, Oregon October 1, 2009 Prepared for: RELIEF NURSERY 1720 West 25th Avenue Eugene, Oregon 97405 Phone (541)343-9706 Prepared by: BRANCH ENGINEERING, INC. 310 Fifth Street ' Springfield, Oregon 97477 Phone (541) 746-0637 Fax (541) 746-0389 Project No. 09-138 ' L Date Received: 1 DEC 11299 Original Submittal_- , J • • L 1 Z -; 0 N_ Ur W !— W 40 ` \ Jia7�l US' Pu 0 IL �fj��� w W Qy w D �. \ • / St-co g4 2p04 0 N NN . , \ / a C • Ca O I O • V1 �� I � I: .. w -8 co . + , ___ . . r1 ici N ' . Q M O • - JO ij .1 Gam` 0 00 \ J , a) \ Q) CV \ c-- E E • . . . . S-BUS-40 : o PASHTO 2004 (US) coz 55. C wa / j OO �' 000d- 1 000 • w p a) coco coro co w oo Lti MI {it] 0 I 0Q 01 al IN � a J ; 1 ,\I • n ■ g o En r el CD ea cn .N Y N T, qa 5 a ,may P .- 0 ,i� M ti e U w� V r0 Y 6 ° .pp en .— En h q v • Gi y ° W q a 14 0 o \ \ -co [7 m oe 9 CC$ m 4 ' t m o y o r1 N 7:1:: I i u U cri ososlo e+aaoA1 'uoµeee'WV 6C':[906002IEIIII'6+WN&11.O111V el 80 •96 p b1G§0\9002\'! EThAi Qonio v tit-BO\OMO tram olnv\ouive1\/'ainN la'PN )I _90\8002\:Z :Nwou bm.mAQ • I i I TRIP GENERATION STUDY FOR ' PROPOSED RELIEF NURSERY Springfield, Oregon October 1, 2006 Prepared by: <c%0 PR Ores N � 5 r '3 #62780P. . fl'Prat Tr ORE •N 09 a Y 13. t �� /FN G\ F EXPIRES- JUNE 30, 2011 i BRANCH ENGINEERING, INC. 310 Fifth Street Springfield, Oregon 97477 Phone (541) 746-0637 Fax (541) 746-0389 I 1 Date Received: . DEC 1 1 2CC9 IOriginal Submiitai — i Relief Nursery, Springfield, Oregon Trip Generation Study INTRODUCTION The purpose of this report is to document the trip generation study performed for the Relief Nursery proposed in Springfield Oregon. The representative sample site was the existing Relief Nursery in west Eugene near the intersection of 25th Avenue and Chambers Street. This study has been prepared due to the unique nature of this land use and the lack of accurate published data necessary to project site generated traffic. ' This information will be useful for establishing a trip generation rate to apply to the proposed new facility so accurate transportation systems development charges can be ' assessed, and for determining if a Traffic Impact Study will be required by Springfield Development Code. The typical traffic consists of Relief Nursery families, staff and volunteers. The Relief Nursery is a non-profit program that strengthens high risk ' families and keeps their vulnerable young children safe and healthy. This report strives to establish an accurate local trip generation rate to apply to the proposed ' development in Springfield, Oregon. ' Included in this report are summaries of the observed daily site generated traffic at the existing nursery, and projected average daily trip generation rates for a proposed development. ' SURVEYED SITES ' Vehicle traffic counts were performed by Branch Engineering, Inc. staff during the months of August of 2009, between the hours of 8:45 AM and 4:15 PM. The counts were taken two consecutive days at Relief Nursery in Eugene. The counts were within 12-percent of one-another, which was considered reasonably close to expected day- to-day fluctuations, so no further observations were considered necessary to establish confidence in the data. Relief Nursery officials have indicated they were at or near full attendance at the time of observation. ' The client supplied some information regarding number of students enrolled (60), the ' total number of classrooms (6) and the existing Relief Nursery building size (14,000 square foot). A summary of the observed volumes for each day is included in this report (see Appendices). ' ; Date Received: Branch EngineerirVg 'l'nc. -1;14°11 of 3 Original Submittai____._.__ I IRelief Nursery, Springfield, Oregon Trip Generation Study ' The following table summarizes the observed site generated traffic at the existing surveyed Relief Nursery in Eugene: I IOBSERVED TRIP GENERATION (Daily) Surveyed Site Date NuUnits of Ave rap Daily Average Rate per Unit August 11, ' Relief Nursery 14,000 Sq. Ft. 248 17.71 per Sq. Ft. 1720 West 25th Ave, Eugene 2009 60 Students 248 4.13 per Student I14,000 Sq. Ft. 220 15.71 per Sq. Ft. Relief Nursery August 12, 1720 West 25th Ave, Eugene 2000 t 9 60 Students 220 3.67 per Student I Based on the above data, the existing Relief Nursery generates a daily average rate of I 16.71 and 3.90 total vehicle trips per 1000 square feet of gross floor area and student, respectively. IPROPOSED DEVELOPMENT IThe proposed Relief Nursery will include 15,088 square feet of gross floor area and it would be an additional full-service site located in Springfield. The projected enrollment ' is 50 students. TRIP GENERATION The trip generation rates established herein were applied to the applicable variables for the proposed new facility. IThe following table lists the proposed development variables and the associated projected site generated traffic: IDate Received: I DEC 1 1 2009 4 Blanch Engineering, Inc. -Page 2 of 3 Original Submittal 1 ' Relief Nursery, Springfield, Oregon Trip Generation Study PROJECTED TRIP GENERATION (Daily) Land Use Number of Average Rate Average Daily Trips Units per Unit ' 16.71 Trips per 252.12 15,088 Sq. Ft. 1,000Sq.Ft. ' Proposed Relief Nursery, Springfield 3.90 Trips per 50 Students Student 195.0 ' Average Daily Trips - - 223.56 CONCLUSION Based on the study performed herein, the projected site generated traffic associated ' with the new Relief Nursery in Springfield is 224 average new daily vehicle trips. Therefore, based on Springfield Development Code Section 4.2-105(4), a Traffic Impact Study should not be required by the City of Springfield for this project, as the ' proposed development will not generate more than 500 daily vehicle trips, there is not a request for a variance from the transportation provision in code, and there were no known street capacity or safety concerns at the Development Issues meeting. 1 ' F Date Received: DEC 1 1 2g09 U09 Original 1 Branch Engineering, Inc. - Page 3 of 3 1 i 1 1 1 • 1 1 I 1 1 Date Received: 1 DEC I 1 2909 1 Original Submittal 1 1 APPENDICES 1 1 I I RELIEF NURSERY 8/11/2009 TRAFFIC COUNTS 9:00AM TO 4:00PM HOUR STAFF STUDENTS Visitors /Other BUS TOTAL IN OUT IN OUT IN OUT IN OUT ' Before 9:00 AM 26 1 27 I 9:00 to 7 19 17 1 1 2 47 I10:00 AM 10:00 I to 2 1 8 11 2 2 1 2 29 11:00 AM I 11:00 to 4 6 7 2 3 3 1 26 I12:00 PM 12:00 IIto 5 9 11 14 2 2 2 4 49 1:00 PM ' 1:00 to 10 17 2 29 I2:00 PM 2:00 I to 4 5 1 2 3 1 16 I 3:00 PM 3:00 to 2 6 1 9 4:00 PM IAfter 16 16 4:00 PM ITOTAL 60 60 47 44 11 11 9 6 248 IGarbage Truck In/Out at around 9:30 AM Date Received:In/Out before 9:00 AM and 3:00 PM f DEC 1 1 2039 IOriginal bu,rriittal I I RELIEF NURSERY 8/12/2009 ' TRAFFIC COUNTS 9:00AM TO 4:00PM HOUR STAFF STUDENTS Visitor /Other BUS TOTAL IN OUT IN . OUT IN OUT IN OUT Before I 9:00 AM 35 35 9:00 to 4 7 12 13 2 1 1 40 10:00 AM 10:00 to 5 10 2 1 1 2 2 1 24 11:00 AM 11:00 to 5 3 5 4 2 2 21 ' 12:00 PM 12:00 I to 2 6 18 17 3 46 1:00 PM ' 1:00 to 4 7 1 2 14 2:00 PM I 2:00 ' to 1 9 3 1 1 15 3:00 PM ' 3:00 to 2 5 1 2 2 12 4:00 PM I After 4:00 PM 13 13 ' TOTAL 58 60 _ 40 38 7 7 6 4 220 Vehicles parked on-street(3) "walking in/out" Relief nursery between 11AM and 1PM. I One vehicle parked in parking lot carrying a bicycle and then went ouside with his bike (leaving car in the parking lot). r r Date Received: I One mail truck went in/out at 11:00 AM r 1 1 2009 IOriginal Subrnii:ai 1 1 I 1 1 1 1 1 I 1 1 1 I 1 1 1 1 1 1