HomeMy WebLinkAboutAgreement APPLICANT 10/24/2012 (2) Private Stormwater Management and Treatment System
Operations and Maintenance Plan
Required per Development Agreement
In order to meet requirements of the City of Springfield MS4 Stormwater Discharge
Permit the City has implemented several policies requiring private property owners to install and
maintain facilities that manage and treat stormwater runoff before discharge to the public
stormwater system.
fi'oS(Gic 49.0-C L-LCD (Property Owner/Developer) acknowledge and agree to
maintain stormwater treatment facilities listed in this document. The maintenance of the
stormwater facilities listed in this document is required as part of the development agreement
required by the City of Springfield. This facility will be operated and maintained in accordance
with the requirements stated in this document and in the latest edition of the City of Springfield
Engineering Design Standards and Procedures. As part of the required maintenance of the
facility the city reserves the right to inspect any stormwater facilities to ensure the facilities are
operating at a satisfactory level. Failure to inspect and maintain the facilities can result in an
unacceptable impact to the public stormwater system and receiving waters.
The requirement to operate and maintain the stormwater treatment facilities in accordance with
the approved site development agreement is binding on all current and future owners of the
property. This plan may be modified under written consent of both the property owners and the
City of Springfield. For any questions regarding this plan, maintenance agreement and
development agreement refer to the Public Works/Development Services front desk at 225 Fifth
St, Springfield Oregon or call (541)-736-3753.
Description of Property 9'5(.5- ?$ S"T 0,C
Subject to agreement
(Legal Address/Taxlot): 7 —Oa —3/ — o o 2e 7) //c/ 5i- //°n
Development Agreement:
1L
Responsible Party:
Cent d /a pct , (a (2
Date Received: /D 2'7 /.z
Planner: MM
els) let
•
Private Stonnwater Management and Treatment System
Operations and Maintenance Plan
Specific Site facilities Requirements
List of Stormwater Treatment
Facilities covered under this agreement:
Facilities and Maintenance List:
Drop in Catch Basin Filters
•
Required Maintenance:
• Inspect and remove debris/clean catch-basin if necessary every 6 months or per manufacturers
recommended schedule
• Replace filter according to manufacturers schedule
Date Received:_(1/Z/h2
Planner: MM
0