Loading...
HomeMy WebLinkAboutStudies APPLICANT 2/15/2011 t'- • • STORMWATER MANAGEMENT PLAN AND DRAINAGE STUDY FOR 51st-52nd & Main-Street-Redevelopment �TI AT (7::Th Springfield, OR February 15, 2011 Prepared For TBG Architects 132 E. Broadway, Suite 200 4Ep PROFF Eugene, OR 97401 4^5� aoINFF sdjo2 Cr. / 53BOOPE r EREGOON�/ Branch Engineering, Inc. $F 09,700� `' 310 5th Street CCRV A. MO Springfield, OR 97477 6xP 12_x/_'2- Phone (541) 746-0637 Fax (541) 746-0389 Branch Engineering, Inc. Branch Project#09-159 . 11/17/2010 12: 09 FAX 54.06 1021 CITY OF SPRINGFIE•PW 002 • SPRINGCrtLD I ..; _,n PUBLIC WORKS DEPARTMENT/Engineering Division Phone: (541) 726-3753 Fax: (541) 736-1021 STORMWATER MANAGEMENT SYSTEM SCOPE OF WORK —(Area below this line filled out by Applicant)— (Please return to Matt Seouder®City of Spring ield Public Works Engineering;Fax it 736-1021,Phone#:736-J035) Project Name: OBO Enterprises,LLC _Applicant: Branch Engineering Assessors Parcel#: 17-02-33-32 TL 6200& 6300 Date: 11/03/10 - Land Use(s): Community Commercial(CC) Phone#: 541-746-0637 Project Size (Acres): 1.5 cres Fax#: 541-746-0389 Approx.impervious Area- 1:407acres: Email: gregabranchengineeringcom Project Description(include a copy of Assessor's map): 1.5 acres site with two commercial buildings near Main Street and a 15 unit apartment building to the south of the commercial buildings with associated landscaping and parking facilities. Drainage Proposal(Public connection(s), discharge location(s), etc. Attach additional sheet(s)if necessary: West side of the site will drain toward 51"Place and connect to the existing storm line in the street. The east side of the site will drain toward 52"6 Street and connect to the existing storm line in the street. Proposed Stormwater Best Management Practices: Infiltration basins and planters will be used on-site with overflows and trapped catch basins. —[Area below this line filled out by the City and Returned to the Applicant)— _ . (At a minimtmt, all boxes checked by the City on the front and back of this'sheet shall he.submitted. an application to be complete for submittal, although otter requirements.may be necessary.),•? Drainage Study Type (EDSPM Section 4.03.2): (Note,UII may be substituted for Rational Method) in Small Site Study—(use Rational Method for calculations) %%i Mid-Level Development Study—(use Unit Hydrograph Method for calculations) ❑ Full Drainage Development Study—(use Unit Hydrograph Method for calculations) Environmental Considerations: itWellhead Zone: It\ Hillside Development: t Wetland/Riparian: Floodway/Floodplain: t.3/, f' Soil Type: 1 'j -aq,y ,‘ 1,41D Other Jurisdictions: ptt pr Downstream Analysis: (ot'r IP. N/A ❑ Flow line for starting water surface elevation: ❑ Design HGL to use for starting water surface elevation: ❑ Manhole/Junction to take analysis to: Return to Matt Stonder�a,City of Springfield,email: mstouder(a.d_springfield.or.us,FAX; (541) 736-1021 ,I r i o t n o o o f i n 11/17/2010 12:09 FAX 5456 1021 CITY OF SPRINGFIE•PW 1 000 COMPLETE STUDY ITEMS For Official Use Only: MILK m Based upon the information provided on the font of this sheet, the following represents a minimum of who(is needed for an • application to be complete for submittal with respect to drainage;however, this list should not be used in lieu of the Springfield Development Code(SDC)or the City's Engineering Design Manual. Compliance with these requirements does not constitute site approval;Additional site specific information may be required. Note: Upon scoping sheet submittal, ensure completed form has been signed in the space provided below: Interim Design Standards/Watcr Quality(EDSPM Chapter 3) Req'd N/A ® ❑ All non-building rooftop(NBR)impervious surfaces shall be pre-treated(e.g.multi-chambered catchbasin w/oil filtration media)for stormwater quality. Additionally,a minimum of 50%of the NBR impervious surface shall be treated by vegetated methods. Po ❑ Where required,vegetative stormwater design shall be consistent with interim design standards(EDSPM Section 3.02), set forth by the Bureau of Environmental Services (BES)or Clean Water Services(CWS). ;:G ❑ For new NI3R impervious area less than 15,000 square feet,a simplified design approach may be followed as specified by the BES for vegetative treatment. ❑ If a stormwater treatment swale is proposed,submit calculations/specifications for sizing,velocity,flow,side slopes, bottom slope,and seed mix consistent with either BES or CWS requirements. ea ❑ Water Quality calculations as required in Section 3.03.1 of the EDSPM ❑ All building rooftop mounted equipment, or other fluid containing equipment located outside of the building, shall be provided with secondary containment or weather resistant enclosure. General Study Requirements(EDSPM Section 4.03) ❑ Drainage study prepared by a Professional Civil Engineer licensed in the state of Oregon. 7 ❑ A complete drainage study,as required in EDSPM Section 4.03.1, including a hydrological study map. ❑ Calculations showing system capacity for a 2-year storm event and overflow effects of a 25-year storm event. • ❑ The time of concentration(Tc)shall be determined using a 10 minute start time for developed basins. Review of Downstream System(EDSPM Section 4.03.4.C) ❑ % A downstream drainage analysis as described in EDSPM Section 4.03 A.C. On-site drainage shall be governed by the Oregon Plumbing Specialty Code(OPSC). ❑ E -Elevations of the FILL and flow lines for both city and private systems where applicable. Design of Storm Systems(EDSPM Section 4.04) ❑ Flow lines,slopes,rim elevations,pipe type and sizes clearly indicated on the plan set. ❑ NJ. Minimum pipe cover shall be 18 inches for reinforced pipe and 36 inches for plain concrete and plastic pipe materials, or proper engineering calculations shall be provided when less. The cover shall be sufficient to support an 80,000 lb load without failure of the pipe structure. a 1-1 r. Morning's "n"values for pipes shall be consistent with Table 4-1 of the EDSP. All storm pipes shall be designed to achieve a minimum velocity of three(3)feet per second at 0.5 pipe full based on Table 4-1 as well. Other/Misc ▪ ❑ Existing and proposed contours,located at one foot interval. Include spot elevations and site grades showing how site drains • ❑ Private stormwater easements shall be clearly depicted on plans when private stormwater flows from one property to another ❑ Drywells shall not receive runoff from any surface w/o being treated by one or more BMPs,with the exception of residential building roofs(EDSP Section 3.03.4.A). Additional provisions apply to this as required by the DEQ. Refer to the website: www.deo.state.or.us/wo/moundwalujchome.hem for more information. WA ❑ Detention ponds shall be designed to limit runoff to pre-development rates for the 2 through 25-year storm events "T is form shall be included as an attachment,inside the front cover,of the stormwater study *IMPORTANT:ENGINEER PLEASE READ BELOW AND SIGN! As the engineer of record,I hereby certify the above required items are complete and included with the submitted storrnwater study and plan set. Signature: Date: Revised 11/19/09 10 of 10 • • Storm Drainage Evaluation 51:`-52nd E Main Street Redevelopment - Option C Introduction This evaluation was prepared to summarize the drainage system proposed for the 51st-52nd & Main Street Redevelopment Option C. This storm drainage evaluation will determine the type and size of water quality/quantity facilities that are acceptable to the City of Springfield. The 51st-52nd & Main Street Redevelopment is located on the south side of Main Street and east of 51' Place and west of 52"d Street in Springfield, Oregon. The proposed project site is comprised of two tax lots, TM 17023332 TL 6200 and TL 6300. Existing Conditions The existing site is bounded by Main Street to the north, 51" place to the west, 52" Street to the east and residential to the south. The site consists of an existing building, a burned down existing building, driveways and landscaping. The impervious surfaces consist of roofs. The pervious surfaces consist of landscaping. According to the Soils Survey of Lane County, Oregon, by the Natural Resource Conservation Service, the soil at the site is Salem Urban Land Complex (Soil Number: 119, Hydrologic Group: B). Refer to Appendix A for soils map information. Proposed Site Conditions The proposed project includes one new commercial buildings, three buildings with townhomes with associated parking, sidewalks and landscaping. The parking and drive aisles will consist of asphalt pavement and the sidewalks will be concrete. Water Quality Treatment and Storm Water Conveyance System The City of Springfield is encouraging as much infiltration on this site as possible. Therefore, the site is proposed to have drainage basins which will flow to infiltration/detention basins located across the site and pervious pavers will be installed in some parking spaces. The infiltration/detention basins will be landscaped with appropriate vegetation and topsoil to allow treatment and infiltration of stormwater with storage above for detaining stormwater. Detention of the stormwater runoff for the 10 year storm is used to determine the reduction in service development charges. Infiltration testing was conducted and the site was determined to have adequate infiltration rates to serve the proposed improvements. See the table below for infiltration results and information. Test Test Location Test Test Soils Measured Depth infiltration Rate 1 Northwest corner 48" 0-12" Topsoil of site 12-36" light brown clayey silt moist 4.5 inches/hour 36"-42" light brown clayey silt 42"-48" Bar Run See Appendix B for the infiltration testing data. There are two proposed infiltration/detention basins proposed on the site. Each is primarily treating/detaining parking areas. See Appendix C for the proposed Drainage Basin Map for location of infiltration/detention basins and the areas they are treating and infiltrating/detaining. Below is a brief description of each. • • Storm Drainage Evaluation 51n-52nd 8 Main Street Redevelopment - Option C Infiltration/Detention Basin A Infiltration/Detention Basin A is located on the west side of the site and west of the proposed restaurant. Infiltration/Detention Basin A will have asphalt parking and landscaping draining to it. The basin draining to Infiltration/Detention Basin A is 0.22 acres. One side has a 3:1 side slope and the other has a short retaining wall. Infiltration/Detention Basin A has approximately 800 cubic feet of storage. Infiltration/Detention Basin A is bisected by a concrete sidewalk and a 6" storm pipe is proposed to go under the concrete sidewalk to allow Infiltration/Detention Basin A to act as one basin. Infiltration/Detention Basin A is two feet deep from the top of the growing medium to the overflow. There is another 6" of freeboard above the overflow. The overflow for Infiltration/Detention Basin A is connected to a proposed 8" storm line that is connected to a proposed 12" storm line in 5151 Place that will be constructed under a Public Improvement Permit. The outlet structure has a 1-1/2" diameter orifice set at elevation 494.50 to control the flow of water out of the infiltration/detention basin and allow for a reduction in service development charges. Infiltration/Detention Basin B Infiltration/Detention Basin B is located on the north side of the site along Main Street and west of the proposed ODOT driveway approach. Infiltration/Detention Basin B will have asphalt parking and landscaping draining to it. The basin draining to Infiltration/Detention Basin B is 0.29 acres. Infiltration/Detention Basin B is I'-6" deep from the top of the growing medium to the overflow and has 3:1 side slopes. Infiltration/Detention Basin B has approximately 887 cubic feet of storage. The overflow for Infiltration/Detention Basin B is connected to a proposed 4" storm line that is connected to the existing public storm system in 52nd Street. The outlet structure has a 1-1/2" diameter orifice set at elevation 495.25 to control the flow of water out of the infiltration/detention basin and allow for a reduction in service development charges. Other drainage basins on the site will be treated by double chambered catch basins with filter inserts and conveyed through storm pipes to the public storm system. Stormwater Runoff Peak discharge rates for the post development conditions were generated using the Santa Barbara Unit Hydrograph method. The King County Department of Public Works, Surface Water Management Division, Hydrographs Programs, Version 4.21B computer program was used to assist in the hydrologic calculations. See Appendix D for the stormwater runoff results. Below is a summary of the results for each drainage basin. Proposed Conditions Peak Discharge Rates (cfs) Storm Basin A Basin B WQ (0.83 inches/24 hours) 0.03 0.04 2 Year (3.3 inches/24 hours) 0.15 0.20 10 Year (4.3 inches/24 hours) 0.20 0.27 25 Year (4.8 inches/24 hours) 0.22 0.30 • • Storm Drainage Evaluation 51 `-52nd Ec Main Street Redevelopment - Option C Infiltration Basin Sizing Each infiltration/Detention basin is characterized in a spreadsheet to be used with the King County Department of Public Works, Surface Water Management Division, Hydrographs Programs, Version 4.21B computer program for routing the developed storm through the infiltration basin. The routing data can be found in Appendix D as well as the infiltration volumes and the required storage for each infiltration/detention basin. Below is a summary of each infiltration/detention basin. Infiltration Basin A Below is a summary of the peak flow rates and the peak elevation the stormwater will get in Infiltration Basin A during these specific storms. Proposed Infiltration Basin A Storm Peak inflow(cfs) Peak outflow (cfs) Water Elevation (feet) WQ 0.03 0.01 494.32 2 Year 0.15 0.07 495.10 10 Year 0.20 0.08 495.36 25 Year 0.22 0.09 495.51 Infiltration Basin A has approximately 800 cubic feet of storage. The overflow is set at an elevation of 496.00. There is a 11/2" diameter orifice in the outlet structure and it is set at elevation 494.50. The 10 year storm event will be detained as much as possible to allow for a reduction in the service development charges. The orifice and outlet are set above the water quality storm event to allow for maximum storm water treatment. The water quality storm will infiltrate within 21 hours. The infiltration basin will be landscaped in accordance with the City of Springfield requirements. Infiltration Basin B Below is a summary of the peak flow rates and the peak elevation the stormwater will get in Infiltration Basin B during these specific storms. Proposed Infiltration Basin B _ _ Storm Peak inflow (cfs) Peak outflow (cfs) Water Elevation (feet) WQ 0.04 0.02 494.99 _ _ 2 Year 0.20 0.09 495.56 10 Year 0.27 0.10 495.82 25 Year 0.30 0.11 495.96 Infiltration Basin B has approximately 887 cubic feet of storage. The overflow is set at an elevation of 496.25. There is a 1-1/2" diameter orifice in the outlet structure and it is set at elevation 495.25. The 10 year storm event will be detained as much as possible to allow for a reduction in the service development charges. The orifice and outlet are set above the water quality storm event to allow for maximum storm water treatment. The water quality storm will infiltrate within 21 hours. The infiltration basin will be landscaped in accordance with the City of Springfield requirements. The rest of the site will drain to double chambered catch basins with filter inserts located in the parking areas and roof drains from the east commercial building and the townhouses will be directed to on-site private storm line that eventually flows to the public storm system in 52nd Street. • • Storm Drainage Evaluation 5r-52nd & Main Street Redevelopment - Option C See Appendix D for stormwater runoff, routing and infiltration basin stage-storage-outflow calculations. See Appendix E for Infiltration Swale section and double chamber catch basin with filter insert. • • Storm Drainage Evaluation 51Q-52nd ft Main Street Redevelopment - Option C Appendix A Soil Maps and Soil Data • • . ._ . ,.YZ.9S.ZZl 0- Ot69L8V 0069L8V OZ69L9V 0t69L8V 0069196 0699L8V 0889L2V 9(99[96 o.0 N a 'PI 25 ZI _ ,S?1P¼G ' � ' ct g %;.., t-a ' S', �3 t� c?'s� t £i 1!J:� d� '� - a o fr ��,-: "Yit o hP. 14 _ k"r X rvti ilii'(R b G �.._ kk u z ' .. x 1 I ^ F 5 �' s r-' >F‘ X c" t 2:ti Fr 'A. s#;,1 x LiSel iffs'' r T .Mjtyc h t „a lW' r ' e< l' a z ' E (> je . � 1 a %re > T };*y: rt 3 Fy i lia+= . a <.om xe y w'Si r # s' B Z � t a � 'ro..s gi' * ^ t M*I}d F taai OJ r � i .i. ti +Pick r ,+�jT f Nk. elR 'Y w !i f ' �*t ,. 'et,4' '. U• U O .. L 'st tl t A; a `fin`i i - ,j I*F -0=, i •04.. .,= , Y t.s'� �..2 ,2'a V �W ; S .4.44.2".& l,Yr (4 4,jt a`v' t .Y ^,F '. ,- .dt tl .' YS ina : r C sg- II ..0 mm'iwte, y "i a . { 2,c22:1-, 7,,,c;.4.: F3' f., � � fr : $ r" •F,~ o ig " ' r 'BtaM v "f � 1 c - Y R vn F/•g F d• * � i< � � v `# #i.•� � " i - - . 1 � 6-u ¢ _ 4r t a f 1 )r Z-.:44-.', 14.=.7440.. Ai n 4 3 x j { n t .4:" -, r-,,t t Y ' y,, 2 M M0 7 it., 4 .. ° T` : „ � { _• 114- 27411.9C-"'^190 a a y r 1:5,5'.l r• '� x R “ '„ax Z ',fCi I=:----_ �.X:{J f };F;`Y y,ki� 'A'� 'v 3 ..' ' '< ,a 3 KF . 'a,.1'� ,gyp,. s- t ''fit ' c "6,_.r"--.W.:,--...-:4.*:..P[ x s(� .. *1.4� 11.. >�� Th; 1 C' 3 ♦r;A n .'si' ' ‘''''l• „.- . 5 - a 4 'isi° y Ie a• r "'k � T t �.h'. i'a a`-'1/4,-”, ry''ks"4^' ti<4 '""�&z a y 1 )n 8 w. c e d z Y x ,eS td's- 1 P P ;;::,,�t1 4 t 8 i 0 b `� ,t, .-six F%�, Pr c 5 q 1 '..;"171'-�a5yk �r C3 �v I m ° o t t W �{t., s' Vol, 144 `i g w' f.. cy �" J � t Y4' Y+i�k A y ej, y';,„.,.1 I d%13yw 7.-:;:4:1.---:,3 b'' -O y t: � 4 s v t v I �{,;a 1'"+ " `.4Ca k S 44. ,, y3-4 .t a. _ a I.E .tivi m ep_U ° sR ym ff.v '{.5�, -a n S . "$v4''``1M;; # t —5 e v`oi a T et+ uF(s v,4Fo- 5 '2' '.- ``cci< +,e'--" t.++ >/" i K 3 i S 54�, �.�.F xh f F o o a C �_n ' -ec+a 't i��. °V44-;;;,,.�` xy°, . -n= » { 5„.s. x `, f ' _`'et ,< + �° CC a �ry- r u �-v 7 �: y l `x'xdi r r>.s* �,}� ry 4n X 8 'E3 a• I it, 4Na bite it--:s i r."{•'':G,T :" .ci.Mia,,t:':- F'{�t P dt a1 C �{,� ,F��-F. T tr., tIr- ,. . ,5 Z Z C .AL95.ZZI 1 I 1 1 i I 1 I ..0£.99.ZZt Q� 0669196 0C69Leo OZ69L86 0169LPV 0069(06 069919V 0999186 O(09ZBV �' in . • • O r sz co co ° ° N n o f6 m x C a o E m ` N N C .- N o O N 3 CD D - — a U ° a 5 D is � D N O c_ N 'p U N D ° N c `O' E E = a) o . m+ a o c o E Z m ° E U o n N On 0 w _ d m Z T n 0 0 `° t V 1— °com x a) N � o z v -E., E 0 Q i° 3 n cQ co Z O o _D - o d N C O E CD Q L V :n O t N p O Emo D. N Et 31 1.1 L c o m ° p • . c ca A E n Z n F 0.O dt o L � _a a 0 E a = o D ca, o m 3 v atm Q o N J 0 O 0 J m L 2, C a, 2 -n L 4 Z O E C a O N C N / 10 O T D D O N .L >` CI' N O 0 E >. =0 JO d N N N N J- a O c a) 3 n o Q o L C _B (p U i aO — re?, D . . Q N a D - L co H N U N a En p n n D n -) (n - a) cu n w N a O n o m - — a m a) E m E c - O L U d O O O L O O O a ° oW 1- a E to U H 5 to (o 0 F E `o, O▪ a a O y J U W Q U. >,W a V. Z a W O o N W U) C W -0 CO J 1r 0 F- 8_to C Tc O Z C 0 `7C C li O 2 II O m co W `a c rn p m m 0 _ _ O ED 8 cc Ee LIJ cc m O w CL 3 ¢ to 0 w m V o 0 z « U c O m o ¢ - D g LL ru o❑ ❑ A ❑ E ❑ o v ¢ a w a 3 r t U a: 7 N O c N c a) CC m m 3 o a3 O Z V v_I1 • Hydrologic Soil Group–Lane County Area, Oregon• • 51ST-52ND&MAIN STREET REDEVELOPMENT Hydrologic Soil Group Hydrologic Soil Group—Summary by Map Unit—Lane County Area,Oregon Map unit symbol Map unit name Rating Acres in AOI Percent of AOI 119 j Salem-Urban land complex ,B 1.5 100.0% Totals for Area of Interest 1.5; 100.0% • Description Hydrologic soil groups are based on estimates of runoff potential. Soils are assigned to one of four groups according to the rate of water infiltration when the soils are not protected by vegetation, are thoroughly wet, and receive precipitation from long-duration storms. The soils in the United States are assigned to four groups (A, B, C, and D) and three dual classes (ND, B/D, and C/D). The groups are defined as follows: Group A. Soils having a high infiltration rate (low runoff potential)when thoroughly wet. These consist mainly of deep, well drained to excessively drained sands or gravelly sands. These soils have a high rate of water transmission. • Group B. Soils having a moderate infiltration rate when thoroughly wet. These consist chiefly of moderately deep or deep, moderately well drained or well drained soils that have moderately fine texture to moderately coarse texture. These soils have a moderate rate of water transmission. Group C. Soils having a slow infiltration rate when thoroughly wet..These consist chiefly of soils having a layer that impedes the downward movement of water or soils of moderately fine texture or fine texture.These soils have a slow rate of water transmission. Group D. Soils having a very slow infiltration rate (high runoff potential)when thoroughly wet. These consist chiefly of clays that have a high shrink-swell potential, soils that have a high water table, soils that have a claypan or clay layer at or near the surface, and soils that are shallow over nearly impervious material. These soils have a very slow rate of water transmission. If a soil is assigned to a dual hydrologic group (ND, B/D, or C/D), the first letter is for drained areas and the second is for undrained areas. Only the soils that in their natural condition are in group D are assigned to dual classes. Rating Options Aggregation Method: Dominant Condition Component Percent Cutoff- None Specified Tie-break Rule: Lower LSD.A Natural Resources Web Soil Survey 12/1/2010 Conservation Service National Cooperative Soil Survey Page 3 of 3 • • Storm Drainage Evaluation 51s`-52nd & Main Street Redevelopment - Option C Appendix B Infiltration Testing Report • • Project Name: D 8 J yk,r n 3l-r2c1.- S i f c Project No.: °a ' fcy Project Location: S 152. Pfc cc SP- rcic=: /1 Date of Field Work: /'//3(l° JOI Comments: "r - S t o4'tcr tCtAj Lyc,,ghi— bt:clt Ley zM" T-ore 6k ko t tr. P!(;£ (z 'E QC-Ai 4-up or- f c /! °' LUAU Infiltration Test No. (1` Depth Diameter 3 Vol. of Presat. I COL Soil Description: it: Tor SA d yoor Mode vat bseT mpg s7, 11– f.lcf>r ',¢, d 1frc Time Time Elapsed Depth to Water Vol. of Water Added L= 0 Infiltration Test No. 1 Depth Diameter Vol. of Presat. Soil Description: Time Time Elapsed Depth to Water Vol. of/Water Added :40 Pei'1)'r ii3iv-t;n `s II (SA ") V /3 Project Name: 067 tir'4tir, Project No.: 01A- C(" Project Location: 45 led pre-,c :p Yr,v;:r, c (td Date of Field Work: t(f (t c' Comments: 6-c.c. p j Infiltration Test No. c Depth Diameter Vol. of Presat. Soil Description: Time Time Elapsed Depth to Water Vol. of Water Added Infiltration Test No. 5 Depth Diameter Vol. of Presat. Soil Description: Time Time Elapsed Depth to Water Vol. of Water Added 00 ere, Lb vv:Ork, =o,�S? 0 I r Net broQgkV o Project Name: oR,o fl in c- S `•`` Project No.: o ( ° Project Location: S Icr. Pie-ct sef (of Date of Field Work: H r 5 Ito Comments: c.c e Po t Infiltration Test No. It Depth Diameter Vol. of Presat. Soil Description: Time Time Elapsed Depth to Water Vol of Water Added U f � r-« ALINE St', t � � vy Initrc.t Infiltration Test No. Depth Diameter Vol. of Presat. Soil Description: Time Time Elapsed Depth to Water Vol. of Water Added • • Storm Drainage Evaluation 51s`-52nd 8 Main Street Redevelopment - Option C Appendix C Proposed Drainage Basin Map I Psi 5I (Ci' • C./ • •00 Cl Cn in ki•IIM t_ . t I .4C Cal w^ n t g I , a I Yft1•4 st Q:1 w 0 --- o ° a 'a .r., - ..a r- .P E C-' P- 0 ca 0 LLJ CC cz z 43 (") 4' 2 - C-' , cr, w w C _ . . o 0 „.., , , -,-. (7., To ° at 2, --, (1) -Id -i-..- u Z cn “' .c a cg Cf) CDLI in I I < z cn ,- Cc-.crC.0.1 I r>: iC'.-.-..-)-.11 0)•••••1 C1,:-4--I 1 g 4"4 1=Z <ccc) 6 --aaWrareir taarC -- - . ct a /\-, ; a a < N c4 N 4 a EC ,4 ao a 2 Ct r----1 44 E""4 Etil .` 1'i LD cp ci g 64 = a a . _, . ., <1 \/ In . c.5 c., . ,__ m - cab zc..) ct . „., ,_, c.-, Z In ,-, - Eti ed.,'" cg Ca Ez1 j Lya co ‘. a *cl I ,,'-'9 ‘...) '1 cg4 ' 1 = ' -' .ar ci i t .. , w .a 4.. c-73 : 6.4 Z 44 iraal 1 Ii'CI) • bal PII4 C1.1 Cn 0 IWISIAI '-‘2 rt fit )() IT- Ci) r:4 ‘01•111 ., *• __. tO - 1 , . 1 1 T,. IS PtrOg , ' ..,, ,, _ , iJ i, , . , , 1 1 . , - _ 1 i , . 1 - b. .. . .2 - . ..1 - - ‘' .-7nc E.:! al-- -. , . . .. ' e-41-t" I7 ir , . . ...-. . v. -,0 , --‘, ci-N-.\ ' .‘...,:r1 i•x.N.-..;„..\.\:. , :„\ -,..: „. 1 1 Ili .. :77A/ / /":<,4, zi:' ' / A: .. , \\-, IS 9 0 i' 1 ,, ?',..-.-.2.;7.1.<;?,4‘',04,,g,‹/,e2-,4C</,p<-' --; . \ \N N\ke _ -'■,4,,, . 1\, a . Vt.4-',71 .-„-a..7,""c„,,,,;t, :,, :', ' - - 17 7.'7.'l ) 9f>4> <V?''1.;7'‘Cr tif‘221 )f‘' '7: .\•! )\\ \ \\atritya!---,- 1:-,&7'.1.,/)0!\ g $,.:;IP.,154.*:',4,i;-:, \•-•:':- : 1 ' ttc *4-•-• , -ir IW- - - j -_-:- - ' - - . './.c;--\ \N \ CIO'-'••' le , \ ,r1v:,prztv7:-.L41 ;,. . :-.. , , /->-,;();-'y ----_____--_-_-_--- - -- •-- - \ , \ .- -42,5:,,srv-ai \- kv-,.., ?-74,,,cpo - -‘. - I1 -- ./<,. - - -- .-. --- 1,),1 , . ."( ')- -.)r, i•IPZI l'■ . . 4R43 a•i--)..., •. A •\•• -, ■ I I, /I ,_:./X.),. . -22:..--- 221-1.------- ..--''---- ----- 2-' ---• 7‘., \ \ ' N IIWIT?IA)..1/i) \ \ ;,:ii§...,;,- -,„:!.,c;:i-1„ -, \,-* ; :•:: to 7, „:„.:c /2 „.--- „„„- __-• _....-. , \..., , •.. 1,....,,..,htteiior"t • ct,h4r1kci-,,K,•:th,„•4 . \ ,, \ \ ort,s fr.4.'s",ME.. ., ,-if..,.`.M ','• .' ", ',.. .... : I 1 1.Z.'- 2: >(CA >i .----•-•-• _.■------ .• --••••-•:_f___....-r • _1,...----I. „ , \ \ \ -,:z;!st„,;15 Q-v:rq-i: .,„,,,,,„ ,,_ - ■ : '..17Q! ,. ----- .--- -. . ....-- -! ---- L----• :‘,.•,,,\\r\‘Likk-ii_ ....: .,. \ , - .---, ;4tz.o.:s:::--r,--:,:.•:-o":." -;.:4 >‘:-•>': •• 7;•tiki-1;44,-• - ' \ 41...)...7.•I'')))-")).): ...)") • is-:kt \ --,---:\ .12:4•4.-::::-.-•-::(1;r." r.c, , L. ./..,.. \.,s, l.7);:)/1 •, '. \ .).41d),%,1))-)2. •&: ," ). :V) •;I</: ''---:2 . --\"- . --- I 'I-- I --,, ‘,,\\\\, K',' \IIIII• IjI:4.).A tI)3))(Fk 1'to\ 1\ I ');•..);fiII:731)).-_,,.•,--,..:.;/: -, ..- 1, •. •1: ' i'l v.°- 9k);`,- -'" -----1 --..---- :A5 1.1N \-, ,-„ '4 -• \ \11j' ;::::.'elr''''4T, \ - ' ''.); 4;;CI: I I 4L ;::, --- -- --- 1P ---- .i t \ '\\ \ ' ‘(..141- ..., / 5o ,, _I- i 1ccc " I 1 LI ,-/, • - --- A r-e ' \ , N, ', \ '3 N avII , '', 'LLJ Z d,- .-..-:-. -,.. ., . , , , d • ;3('`)), -------. - z d -- - --=:: 2--: \ N \ \'.6 NEm 7.2:r:::<f.., t.c, a_ "Y. : 3 ; 1 j II:i ;7 li)?>4'>:•< ----Ca cC ---- --'I't•••.' . \ \ ----gs, •••.\ , -• ‘l!ja---wn: \ , :•/;:e‘-.a...7,:: - -=t--,:=-.-. . ..., ,-: I ! . 'lli ? ' 5 --1(D`u.:, LI-,=._ cc' Hi; •----- ---7 .H----- , 21111 \--4\IF\ ..iinNeinigl..,„ AkTiN_ •,\":\:. :: ': N:\ ' - 1 , , .. _ . , ._ ..._ . ., .. .,. . s Cir4)/''.'.\.• a •.\F› ',. .--..r.\ \ , .,• . . 1 . ' L //:1/2 ---- ---- --------. i P ma. r ''( I\ -I '.P- '`-g*•:',51 . fCir7: 1 -- -.. --- -k-",-"! •- - c.<,,\ ..'.. .;•-:,::::::'\:-5•■9 8. ? . N 1 -- --- --- - -- - 1 - -- .}13i, ")i \ \ ' r'ffri-/-/ l'''''' '''c''''''' 'l \'' ----,, ---- -- --t--="i ,..,Acaa. ., -......L'.4140 -. Fr ...- c. \ .:\t‘c-I ,r) //"-§"------ .----1- i----H-- I 4 // '/ .,,4s:•;,-;,:wriy4-,:y. -,-,: - •‘ frep.,,c--::,,,',5,, ,,, : : : , , 1 - ..,\•kr:. ---"r •;,;‘- - ..----t- ------1._-- -- //, ,/ / - ,k,,,,,,,i,a sw, \ N,. .N :::i.,??.,:•:„,.•„5,-,t,,2 , " . \ 44 1 - - •. *-7-.• •1----7<ic3 --t----.J------i ..-- - ',... / ,./ / / / . ;:,,,,Iwc.---,.p. :c.c.s;...... fr,4a,,,:rcu=9.8 . .-.... - / / -.. -c,,h,Jr:, , /S .17 ' - r---. , C4, H- \L\‘-st_--.--------• 7111g1prc-r:lH 1----;,-- , • / .4. / / / 17,-.1 ..- 7111,.7.fA„ro.tei t,: --, \ x ,•.;,• I - ,- 1 41 VD1 ' I\ :------,.---1--- -----T i ..21-1- 1 ---- - -- . k "..:/ ',/ 7/ ; / to///1 -•:. 0•1"kt'R-,•-.1 :'',',4•,' :y47,!,--.5,..-.4•-,-4..J,-pi., ,• -. •,: , :, 1 'i: * • ,,,,,,,,,,,,,,,--- ...- iltorph-- -------- • v/ / /dr._ . : y, \ N.\ ., im.*;.,:;••/(,),_g ti:, • - • ---- _ /' / I ,,,'<;', ..';',..,!.(4.,,4 - \ ‘[. 'il.tnarsIsmo-A,ii:ri.70.1icsrto.7.4.f. ' / • / / / 1 ''-',:,'V'C'•?-t'",'')4),I)• \ ^ \ ^...t);:•.••:=,,,.,:,,,.)K.2. . .,., ii 1.,_ i . .)..:),IIteei., 44 .14.`20):4:- .4•••Ck.)-I'.V./1)1.2. . , / / , / „' filll'"H'.f'4:;,.'Zi; ' \ \ • ..._- i .. ' •J'.,46.40t-"Xtivr-C.,.NtaVattii.:14it4;M:-Ii-,,(: ' / ./, ,/,/ / //4rIr. I-,,,,,,,,,,“\ L. ', \ etev9rii;!:-.- i • • ,,,,n . gr!"-iiviixii,,- • ,....- „,i,o---0.1a,ffito..54;:itn-A-,... :„/ / - - / / . , Millsfo,i„! •:,'L.-Th.-4V!... , '-:- •\, ' ',.?„-;T:::' .t•';--"!,":!•' '• ' * . li 4 ' 1 !I !•..• .-,-f.On•-'14,..s%.7,Z4,14----41liejltilli!t44-1:;`e:A.2.-!•• ' 7' / ,• / / ,' , • ! ./ -Vitolt1-!;i:si,k:V,.;;;Atriv-!/-iX";Ir-,Lli•Vii:1`; -!!..V. '1 ' / , / / /:\/ ,114152M-'). A•'‘2•4,-;: • 'NS\•.• -,•;";." • ' ..-- ' \!?; -- II ..", li .:k;:Y'.`,1":'44-;;;I•nrt' lik, .E,4-;? ./ / / ' N... at ,,, ',worm:SIMI \ ,,• -v.::: : r , ecf\ji @ (r r! r ,.. I I I i .JC. :L.,':e.j.1:1 i'rq: t 4.fLir,?r;4A1'411‘ 1;•;:',1:;:*'r>ir'Z;'r / r ' / 'r // /' / ,$• ;/LIMMITIIMI rr r . .• t• ' I H r:r'r r le / / / / / rr\' ' Pi-, • , ! ';,:II\;)).. :))).„II;::!!)13,?„.-.,,•%:.)101;„"ce'b.,t.4)).1I4IVIIIII,:. .?,',I.))::-\:)4;1' tit/ / /•-• 't'' 1 2 /7/in'-"k I•;:-..HI-' \ \'''\'' ) \\ •1:\:S:II:\C\ '1.: . ' \ \\.) \C::<%N \C N. 6 I/' /// / ''''''''' 'li i\ / N..:'C N '':.\:'''.. .%., .:'\ N. \• \ •N .'''1 ': ! .D.11.■.... IL .% •••):04:1%. I:\r,••••;I4)..0))4)..),.0,0).‘):::),0“Iiiitt,'"..");a:'cl-ric.,, . °) ; J.' _,-• „., ,, ... •oo; ,,-,,:, ,,.\,:. . I• \l•.-k:,•c-a•.;•• •••• ;••Z 0.!'l: e' Z I",-- "'• 4 ,- ,," ,c,-; ,- .,/ /,/ / - - , 4,,,:.---,..m- L., ;"•.f.: ":"R. :: kr' . r , ,- , 7 , / i 1 N,J.", .,:.-.9:t'i.*,,,..,-7(Pc,.- Lz, 1--- "cpre:47.-15,'‘C;-,--.,,,, 4. / - - • a ,_ , L. L,„,,,, ..,,,..„..,,,,,,, , ,,,>-- cN;.§kktii-,J-:• r .,. r , / .- a 1 2 7/ ••-/ -- "ii---. „ • ,ir•,,,,,,e,L, 2 c,4 „r,,,,,...,,,,,,,,,, , / - •--r. c, / •-- , - i • -, L,_, 1-- 1 , •`-‘. ' ',' ':•.'':!i;:c.%:•'‘ (3 II t" 19'cji:A rfr',H-' r / / / 2 -z / / / I -":iR.h..,..,„ a -_-- &,,,,,,-„-,,.:- •••,-. -," ' ./ - .yr ,..1' • . 'i ./ .-- 0 -, Ni -•:. // - ,f,,;,:. 7 -.• /2 : 14-1 z es dri./.---- .zr.... 1 FF - .;:.&...1 . .•'--,<.i.'t..:-.!".2.:?ireri,it. ::,.° ., -..4: A // / '' o 1.7E .</-:%..,";,' 7' . e -, ..1?:!,c-:1'771.;!:c ,:.;-.. iiinmo. . ,- , ,, .- --, , ,' / 0 1 '1 8 ', ' . '-',',..,. ..-.. .':rri4.1 . / / is ..fr4,,- I ' / //I ,' .7 _ , ! , • l< •-.: • ,7-.;-,-.:'-il,. // / , ,,-. / - - ' / -' , . . -: / /#,/,--3;:. J I I I • \'‘. ,.. !-,:::..:-..--,.., :e:it.s..7a.,.•„:, .- , -- Ilia. <;--/- / „ / / ,,• - .N.•‘,. .K•Y\ NK.'\;\i.;.,,,-,,,i it •. .55 ,, - , , / / - r, ,•,H,. ...,, :,•:-. :„fr.::,<: ppa /,/,,,i,77.r; ; ix_. \ • \\ .P .... I rZ'• r<;:41111.11111111111111010011111111 illit,S141111 ; 'Oli b, ECM 0 a 2 • :. I ! . . , i ' •,:- Id 4sT9 . __. 1 ' - - . - - - -- - , , 1 . _ -;-51 • Storm Drainage Evaluation 51Q-52nd a Main Street Redevelopment - Option C Appendix D Stormwater Runoff& Infiltration Basin Sizing Calculations • Storm Drainage Evaluation 51“-52nd & Main Street Redevelopment - Option C Infiltration Basin A-Water Quality Storm ******************** S.C.S. TYPE-1A DISTRIBUTION ******************* ********* 1-YEAR 24-HOUR STORM **** . 83" TOTAL PRECIP. ******* ENTER: A(PERV) , CN(PERV) , A(IMPERV) , CN(IMPERV) , TC FOR BASIN NO. 1 0. 03, 61, 0. 19, 98, 10 DATA PRINT-OUT: AREA(ACRES) PERVIOUS IMPERVIOUS TC(MINUTES) A CN A CN .2 .0 61 . 0 .2 98 .0 10.0 PEAK-Q(CFS) T-PEAK(HRS) VOL(CU-FT) .03 7 .83 432 ENTER [d: ] [path] filename[ .ext] FOR STORAGE OF COMPUTED HYDROGRAPH: 159-wgca.dev RESERVOIR ROUTING INFLOW/OUTFLOW ROUTINE SPECIFY [d: ] [path] filename[ .ext] OF ROUTING DATA 09159ca.rd DISPLAY ROUTING DATA (Y or N) ? Y ROUTING DATA: STAGE(FT) DISCHARGE(CFS) STORAGE(CU-FT) PERM-AREA(SQ-FT) 494 . 00 .00 .0 .0 494 .25 .01 57 .0 .0 494 . 50 .02 125.0 .0 494 .75 .05 205.0 .0 495 . 00 .06 298.0 . 0 495 . 25 .08 404 .0 . 0 495 . 50 .09 524 .0 . 0 495 . 75 . 10 660.0 . 0 496. 00 . 11 812. 0 . 0 496. 25 .82 982.0 . 0 496. 50 2. 11 1171.0 .0 AVERAGE PERM-RATE: . 0 MINUTES/INCH ENTER [d: ] [path] filename [ .ext] OF COMPUTED HYDROGRAPH: 159-wgca.dev INFLOW/OUTFLOW ANALYSIS: PEAK-INFLOW(CFS) PEAK-OUTFLOW(CFS) OUTFLOW-VOL(CU-FT) .03 .01 359 INITIAL-STAGE (FT) TIME-OF-PEAK(HRS) PEAK-STAGE-ELEV(FT) .00 8 .33 494.32 PEAK STORAGE: 70 CU-FT Storm Drainage Evaluation 5V-52nd Ft Main Street Redevelopment - Option C Infiltration Basin A-2 Year Storm ******************** S.C.S. TYPE-1A DISTRIBUTION ******************* ********* 2-YEAR 24-HOUR STORM **** 3. 30" TOTAL PRECIP. ******* ENTER: A(PERV) , CN(PERV) , A(IMPERV) , CN (IMPERV) , TC FOR BASIN NO. 1 0.03, 61, 0. 19, 98, 10 DATA PRINT-OUT: AREA(ACRES) PERVIOUS IMPERVIOUS TC(MINUTES) A CN A CN .2 .0 61 .0 .2 98.0 10.0 PEAK-Q(CFS) T-PEAK(HRS) VOL(CU-FT) .15 7. 83 2167 ENTER [d: ] [path] filename [ .ext] FOR STORAGE OF COMPUTED HYDROGRAPH: 159-2ca.dev RESERVOIR ROUTING INFLOW/OUTFLOW ROUTINE SPECIFY [d: ] [path] filename[ .ext] OF ROUTING DATA 09159ca.rd DISPLAY ROUTING DATA (Y or N) ? Y ROUTING DATA: STAGE(FT) DISCHARGE(CFS) STORAGE(CU-FT) PERM-AREA(SQ-FT) 494 . 00 . 00 . 0 .0 494 . 25 .01 57.0 .0 494 . 50 . 02 125. 0 .0 494 . 75 . 05 205. 0 .0 495 . 00 . 06 298. 0 .0 495. 25 . 08 404 . 0 .0 495. 50 . 09 524 . 0 . 0 495. 75 . 10 660. 0 .0 496. 00 . 11 812. 0 .0 496. 25 .82 982.0 .0 496. 50 2. 11 1171 . 0 .0 AVERAGE PERM-RATE: .0 MINUTES/INCH ENTER [d: ] [path] filename[ .ext] OF COMPUTED HYDROGRAPH: 159-2ca.dev INFLOW/OUTFLOW ANALYSIS: PEAK-INFLOW(CFS) PEAK-OUTFLOW(CFS) OUTFLOW-VOL(CU-FT) .15 .07 2206 INITIAL-STAGE (FT) TIME-OF-PEAK(HRS) PEAK-STAGE-ELEV(FT) .00 8. 17 495.10 PEAK STORAGE: 340 CU-FT • • Storm Drainage Evaluation 5r-52nd Ft Main Street Redevelopment - Option C Infiltration Basin A-10 Year Storm ******************** S.C.S. TYPE-1A DISTRIBUTION ******************* ********* 10-YEAR 24-HOUR STORM **** 4 .30" TOTAL PRECIP. ******* ENTER: A(PERV) , CN(PERV) , A(IMPERV) , CN(IMPERV) , TC FOR BASIN NO. 1 0. 03, 61, 0 . 19, 98, 10 DATA PRINT-OUT: AREA(ACRES) PERVIOUS IMPERVIOUS TC(MINUTES) A CN A CN .2 .0 61 .0 .2 98.0 10.0 PEAK-Q(CFS) T-PEAK(HRS) VOL(CU-FT) .20 7 .83 2907 ENTER [d: ] [path] filename[ .ext] FOR STORAGE OF COMPUTED HYDROGRAPH: 159-10ca.dev RESERVOIR ROUTING INFLOW/OUTFLOW ROUTINE SPECIFY [d: ] [path] filename[ .ext] OF ROUTING DATA 09159ca.rd DISPLAY ROUTING DATA (Y or N) ? Y ROUTING DATA: STAGE(FT) DISCHARGE (CFS) STORAGE(CU-FT) PERM-AREA(SQ-FT) 494 . 00 . 00 .0 .0 494 .25 .01 57 .0 .0 494 . 50 .02 125.0 .0 494 . 75 .05 205.0 .0 495. 00 .06 298 .0 .0 495.25 .08 404 .0 - .0 495. 50 .09 524 .0 .0 495.75 . 10 660.0 .0 496. 00 . 11 812.0 .0 496. 25 . 82 982.0 .0 496. 50 2. 11 1171 .0 .0 AVERAGE PERM-RATE: .0 MINUTES/INCH ENTER [d: ] (path] filename[ .ext] OF COMPUTED HYDROGRAPH: 159-10ca.dev INFLOW/OUTFLOW ANALYSIS: PEAK-INFLOW(CFS) PEAK-OUTFLOW(CFS) OUTFLOW-VOL(CU-FT) .20 .08 2908 INITIAL-STAGE(FT) TIME-OF-PEAK(HRS) PEAK-STAGE-ELEV(FT) .00 8 . 33 495.36 PEAK STORAGE: 450 CU-FT • • Storm Drainage Evaluation 51s`-52nd & Main Street Redevelopment - Option C Infiltration Basin A-25 Year Storm ******************** S.C.S. TYPE-1A DISTRIBUTION ******************* ********* 25-YEAR 24-HOUR STORM **** 4 .80" TOTAL PRECIP. ******* ENTER: A(PERV) , CN(PERV) , A(IMPERV) , CN (IMPERV) , TC FOR BASIN NO. I 0. 03, 61, 0. 19, 98, 10 DATA PRINT-OUT: AREA(ACRES) PERVIOUS IMPERVIOUS TC(MINUTES) A CN A CN .2 .0 61 .0 .2 98.0 10.0 PEAK-Q(CFS) T-PEAK(HRS) VOL(CU-FT) .22 7 .83 3282 ENTER [d: ] [path]filename [ .ext] FOR STORAGE OF COMPUTED HYDROGRAPH: 159-25ca.dev RESERVOIR ROUTING INFLOW/OUTFLOW ROUTINE SPECIFY [d: ] [path] filename[ .ext] OF ROUTING DATA 09159ca.rd DISPLAY ROUTING DATA (Y or N) ? Y ROUTING DATA: STAGE(FT) DISCHARGE(CFS) STORAGE(CU-FT) PERM-AREA(SQ-FT) 494 . 00 .00 . 0 . 0 494 . 25 .01 57 . 0 . 0 494 . 50 .02 125. 0 . 0 494 . 75 .05 205.0 . 0 495. 00 .06 298 .0 . 0 495 .25 .08 404 .0 . 0 495 . 50 .09 524 . 0 . 0 495 . 75 .10 660. 0 . 0 496. 00 .11 812 .0 . 0 496. 25 .82 982 . 0 . 0 496. 50 2. 11 1171 . 0 . 0 AVERAGE PERM-RATE: .0 MINUTES/INCH ENTER [d: ] [path] filename [ .ext] OF COMPUTED HYDROGRAPH: 159-25ca.dev INFLOW/OUTFLOW ANALYSIS: PEAK-INFLOW(CFS) PEAK-OUTFLOW(CFS) OUTFLOW-VOL(CU-FT) .22 .09 3130 INITIAL-STAGE (FT) TIME-OF-PEAK(HRS) PEAK-STAGE-ELEV(FT) . 00 8 .33 495.51 PEAK STORAGE: 1900 CU-FT Storm Drainage Evaluation 51`t-52nd Ft Main Street Redevelopment - Option C Infiltration Basin B-Water Quality Storm ******************** S.C.S. TYPE-1A DISTRIBUTION ******************* ********* 1-YEAR 24-HOUR STORM **** .83" TOTAL PRECIP. ******* ENTER: A(PERV) , CN(PERV) , A(IMPERV) , CN(IMPERV) , TC FOR BASIN NO. 1 0. 03, 61, 0.26, 98, 10 DATA PRINT-OUT: AREA(ACRES) PERVIOUS IMPERVIOUS TC(MINUTES) A CN A CN . 3 .0 61.0 .3 98.0 10.0 PEAK-Q(CFS) T-PEAK(HRS) VOL(CU-FT) .04 7.83 591 ENTER [d: ] [path] filename[ .ext] FOR STORAGE OF COMPUTED HYDROGRAPH: 159-wqcb.dev RESERVOIR ROUTING INFLOW/OUTFLOW ROUTINE SPECIFY [d: ] [path] filename[ .ext] OF ROUTING DATA 09159cb.rd DISPLAY ROUTING DATA (Y or N) ? Y ROUTING DATA: STAGE(FT) DISCHARGE (CFS) STORAGE(CU-FT) PERM-AREA(SQ-FT) 494 . 75 . 00 .0 .0 495 . 00 . 02 92.0 .0 495. 25 .07 208.0 .0 495. 50 . 09 351.0 .0 495. 75 . 10 520.0 .0 496. 00 . 11 704 .0 .0 496. 25 . 11 887.0 .0 496. 50 . 65 1071.0 . 0 AVERAGE PERM-RATE: .0 MINUTES/INCH ENTER [d: ] [path] filename [ .ext] OF COMPUTED HYDROGRAPH: 159-wqcb.dev INFLOW/OUTFLOW ANALYSIS: PEAK-INFLOW(CFS) PEAK-OUTFLOW(CFS) OUTFLOW-VOL(CU-FT) .04 .02 521 INITIAL-STAGE (FT) TIME-OF-PEAK(HRS) PEAK-STAGE-ELEV(FT) .00 8.50 494.99 PEAK STORAGE: 80 CU-FT Storm Drainage Evaluation 51"-52n- & Main Street Redevelopment - Option C Infiltration Basin B-2 Year Storm ******************** S.C.S. TYPE-1A DISTRIBUTION ******************* ********* 2-YEAR 24-HOUR STORM **** 3.30" TOTAL PRECIP. ******* ENTER: A(PERV) , CN(PERV) , A(IMPERV) , CN(IMPERV) , TC FOR BASIN NO. 1 0.03, 61, 0.26, 98, 10 DATA PRINT-OUT: AREA(ACRES) PERVIOUS IMPERVIOUS TC(MINUTES) A CN A CN .3 .0 61.0 .3 98. 0 10.0 PEAK-Q(CFS) - T-PEAK(HRS) VOL(CU-FT) .20 7.83 2946 ENTER [d: ] [path] filename [ .ext] FOR STORAGE OF COMPUTED HYDROGRAPH: 159-2cb.dev RESERVOIR ROUTING INFLOW/OUTFLOW ROUTINE SPECIFY Ed: ] [path] filename[ .ext] OF ROUTING DATA 09159cb.rd DISPLAY ROUTING DATA (Y or N) ? • Y • ROUTING DATA: STAGE(FT) DISCHARGE(CFS) STORAGE(CU-FT) PERM-AREA(SQ-FT) 494 . 75 .00 .0 . 0 495. 00 .02 92 .0 . 0 495. 25 .07 208 .0 . 0 495. 50 .09 351 . 0 . 0 495. 75 . 10 520. 0 .0 496. 00 .11 704 .0 . 0 496. 25 .11 887 . 0 . 0 496. 50 . 65 1071. 0 . 0 AVERAGE PERM-RATE: .0 MINUTES/INCH ENTER [d: ] [path] filename[ .ext] OF COMPUTED HYDROGRAPH: 159-2cb.dev INFLOW/OUTFLOW ANALYSIS: PEAK-INFLOW(CFS) PEAK-OUTFLOW(CFS) OUTFLOW-VOL(CU-FT) .20 .09 2937 INITIAL-STAGE(FT) TIME-OF-PEAK(HRS) PEAK-STAGE-ELEV(FT) .00 8. 17 495.56 PEAK STORAGE: 390 CU-FT Storm Drainage Evaluation 5V-52n° & Main Street Redevelopment - Option C Infiltration Basin B-10 Year Storm ******************** S.C.S. TYPE-1A DISTRIBUTION ******************* ********* 10-YEAR 24-HOUR STORM **** 4 .30" TOTAL PRECIP. ******* ENTER: A(PERV) , CN (PERV) , A(IMPERV) , CN (1MPERV) , TC FOR BASIN NO. 1 0. 03, 61, 0.26, 98, 10 DATA PRINT-OUT: AREA(ACRES) PERVIOUS IMPERVIOUS TC(MINUTES) A CN A CN .3 .0 61. 0 . 3 98 .0 10.0 PEAK-Q(CFS) T-PEAK(HRS) VOL(CU-FT) .27 7 .83 3939 ENTER [d: ] [path] filename[ .ext] FOR STORAGE OF COMPUTED HYDROGRAPH: 159-lOcb.dev RESERVOIR ROUTING INFLOW/OUTFLOW ROUTINE SPECIFY [d: ] [path] filename [ .ext] OF ROUTING DATA 09159cb.rd DISPLAY ROUTING DATA (Y or N) ? Y ROUTING DATA: STAGE(FT) DISCHARGE(CFS) STORAGE (CU-FT) PERM-AREA(SQ-FT) 494 .75 .00 .0 .0 495.00 .02 92 .0 .0 495.25 .07 208 .0 .0 495 .50 .09 351 .0 .0 495 .75 .10 520.0 .0 496.00 . 11 704 .0 .0 496.25 .11 887 .0 .0 496.50 .65 1071 .0 . 0 AVERAGE PERM-RATE: .0 MINUTES/INCH ENTER [d: ] [path] filename[ .ext] OF COMPUTED HYDROGRAPH: 159-lOcb.dev INFLOW/OUTFLOW ANALYSIS: PEAK-INFLOW(CFS) PEAK-OUTFT.OW(CFS) OUTFLOW-VOL(CU-FT) .27 .10 3963 INITIAL-STAGE(FT) TIME-OF-PEAK(HRS) PEAK-STAGE-ELEV(FT) .00 8.50 495.82 PEAK STORAGE: 570 CU-FT Infiltration Basin B-25 Year Storm • • Storm Drainage Evaluation 51s`-52nd £t Main Street Redevelopment - Option C ******************** S.C. S. TYPE-1A DISTRIBUTION ******************* ********* 25-YEAR 24-HOUR STORM **** 4 .80" TOTAL PRECIP. ******* ENTER: A(PERV) , CN(PERV) , A(IMPERV) , CN (IMPERV) , TC FOR BASIN NO. 1 0. 03, 61,0.26, 98, 10 DATA PRINT-OUT: AREA(ACRES) PERVIOUS IMPERVIOUS TC(MINUTES) A CN A CN .3 .0 61. 0 .3 98.0 10.0 PEAK-Q(CFS) T-PEAK(HRS) VOL(CU-FT) .30 7.83 4441 ENTER [d: ] [path] filename[ .ext) FOR STORAGE OF COMPUTED HYDROGRAPH: 159-25cb.dev RESERVOIR ROUTING INFLOW/OUTFLOW ROUTINE SPECIFY [d: ] [path] filename[ .ext] OF ROUTING DATA 09159cb.rd DISPLAY ROUTING DATA (Y or N) ? Y ROUTING DATA: STAGE (FT) DISCHARGE(CFS) STORAGE(CU-FT) PERM-AREA(SQ-FT) 494 . 75 .00 .0 . 0 495. 00 . 02 92. 0 . 0 495. 25 .07 208.0 . 0 495. 50 .09 351. 0 . 0 495. 75 . 10 520.0 . 0 496. 00 . 11 704 .0 . 0 496. 25 . 11 887.0 . 0 496. 50 . 65 1071.0 . 0 AVERAGE PERM-RATE: .0 MINUTES/INCH ENTER [d: ] [path] filename [ .ext] OF COMPUTED HYDROGRAPH: 159-25cb.dev INFLOW/OUTFLOW ANALYSIS: PEAK-INFLOW(CFS) PEAK-OUTFLOW(CFS) OUTFLOW-VOL(CU-FT) .30 .11 4425 INITIAL-STAGE (FT) TIME-OF-PEAK(HRS) PEAK-STAGE-ELEV(FT) . 00 8 .50 495.96 PEAK STORAGE: 670 CU-FT Storm Drainage Evaluation 51s` 52nd ti Main Street Redevelopment - Option C Appendix E Vegetated Infiltration Basin and Double Chambered Catch Basins with Fossil Filter Insert • 0 f1 MINIMUM, FOR PARKING LOTS, PRE STOPS OR 3.1 AAA% - CURBS W/CUTS SIDE SLOPES t FIAT280T1OM > - • 12-x12- CLEAR FLOW (ryp) /-OVERFLOW AREA AT CUTOUTS ri ELEVATION 2. (SEE NOTE 29) ��. AV♦ A .� A Y • �� ViceA:(1-2.) ' :(.\� 2 �1�(� ♦A t ♦: 12" (SEE NOTE 6) l v ^14„ t :01U ROCff` Lie FILTER FABRIC, SEE NOTE 7 • SEE SW-150 FOR PIPING D(ISTWG SUBGRADE CONFIGURATION. 1.Provide protection from all vehicle traffic, equipment staging, 6.Drain rock: and foot traffic in proposed infiltration areas prior to,during, a.Size for infiltration basin: 1''A"-34"washed and after construction. b.Size for flow-through basin:Y.."washed c.Depth for Simplified: 12" 2.Dimensions: d.Depth for Presumptive:0-48",see talcs. a.Width of basin:9'minimum. b.Depth of basin(from top of growing medium to 7.Separation between drain rock and growing medium: overflow elevation);Simplified: 12", Presumptive: Use filter fabric(see SWMM Exhibit 2-5)or 9"-18 a gravel lens(%-'/4 inch washed,crushed rock 2 to 3 inches c.Flat bottom width:2'min. deep). d.Side slopes of basin:3:1 maximum. 8.Growing medium: 3.Setbacks(from midpoint of facility): a.18"minimum a.Infiltration basins must be 10'from foundations and b.See Appendix F.3 for specification or use 5'from property lines. . sand/loam/compost 3-way mix. b.Flow-through swales must be lined with connection to approved discharge point according to SWMM 9.Vegetation:Follow landscape plans otherwise refer to plant Section 1.3. list in SWMM Appendix F. Minimum container size is 1 gallon. p of plantings per 100sf of facility area): 4.Overflow: a.Zone A(wet): 115 herbaceous plants OR 100 a.Overflow required for Simplified Approach. herbaceous plants and 4 shrubs b.Inlet elevation must allow for 2"of freeboard, b.Zone B(moderate to dry): 1 tree AND 3 large minimum. shrubs AND 4 medium to small shrubs. c.Protect from debris and sediment with strainer or The delineation between Zone A and B shall be either at the grate. outlet elevation or the check dam elevation,whichever is lowest. 5.Piping:shall be ABS Sch.40,cast iron,or PVC Sch.40. 3" pipe required for up to 1,500 sq ft of impervious area, 10. Install washed pea gravel or river rock to transition from otherwise 4"min. Piping must have 1%grade and follow the inlets and splash pad to growing medium. Uniform Plumbing Code. 11. Inspections:Call BDS IVR Inspection Line, (503)823-7000. for appropriate inspections. STORMWATER MANAGEMENT MANUAL TYPICAL DETAILS - Simplified / Presumptive Design Approach - NUMBER • Basin SW-140 Bureau of Environmental Services j i • LOGARD rM 53" FILTER INSERT (MODEL FGP-24F) WOVEN MESH 93 FILTER BODY Er] Q =t NOTES: I li '♦° . `� BOX FABRICATED FROM cv ral ♦ ♦�♦♦�♦♦• 10 GA. MATERIAL j �,`♦� NEOPRENE GASKET (TWO SIDES) OUTLET f 48" LONG DUCTILE IRON SOLID LID & DUCTILE IRON GRATE PLAN VIEW BIKE PROOF, HEAVY I SILT & DEBRIS HIGH DUTY TRAFFIC GRATE CONTAINMENT AREA FLOW SUPPORTS AASHTO L22x2x6 BYPASS H25 LOADS FRAME 53" T_ ' -.& tr±t OUTLET ,Y - ' c r \—SEDIMENT TRAP W/ HINGED l\_ xf cv LID SEDIMENT TRAP I 1 i 48" 1 REPLACEABLE j i ABSORBENT SIDE VIEW POUCHES ISOMETRIC SEDIMENT & HYDROCARBONS FILTRATION SYSTEM STATE APPROVED — ASPHALT DIPPED S 24"x42" 6"0 OUTLET j SAND COLLECTOR CATCH BASIN DWG # l PROJ. MAN. DOUG P D . PAUL G SCALE NONE Gibson Steel Basins SINCE 1972 DATE: JAN. 23, 06 MODEL: SCBF10-42HB-6 247 Washington St. Eugene, Or. 97401 ph:(541) 687 — 8672 fax:344-0207