Loading...
HomeMy WebLinkAboutItem 09 Bid Award for Project P20538: Booth Kelly Building B Truss Repair . ' Meeting Date: Meeting Type: Department: Staff Contact: Staff Phone No: Estimated Time: October 1,2007 Regular Session Developmen! ~ic~ Dave Puen~ . 726-3668 I(;J:JlJ Consent Calendar AGENDA ITEM SUMMARY SPRINGFIELD CITY COUNCIL BID AWARD FOR PROJECT P20538: BOOTH KELLY BUILDING B TRUSS REPAIR ITEM TITLE: ACTION REQUESTED: Approval of the following motion: TO AWARD THE SUBJECT CONTRACT TO ESSEX GENERAL CONSTRUCTION, INe. IN THE AMOUNT OF $ 130,600.00. ISSUE STATEMENT: One bid was received on the Booth-Kelly roof truss repair project. Contract award is now necessary to enable the work to proceed. ATTACHMENTS: Attachment 1. Bid Submittal Attachment 2. Booth-Kelly Site Map Attachment 3. Photographs of Building Damage DISCUSSION/ FINANCIAL IMP ACT: In late 2006 several bow-string roof trusses in Building B at the Booth-Kelly Center failed. At the time of failure, no additional dead loading on the roof had occurred nor was there any unique increase in wind pressure at the time of failure. The entire roof system was immediately supported with shoring towers until the reason why the roof trusses had failed could be determined. Because no definitive reason why the roof failed could be determined, it became necessary to conduct a complete engineering analysis of the entire roof system before repair of the failed trusses could begin. Because of the complexity of the bow-string truss design, the substantial span distances with no intermediate supports and the resulting large roof loads, a quick fix of the roof system was not possible. During the course of the investigation, it was also determined that the existing roof system, although not at a level of additional failure, did not meet a suitable safe performance level without the need for additional reinforcement. During the Spring of2007, several potential engineering fixes were presented to the City. In reviewing the different potential fixes (framed walls under all roof trusses or elaborate engineered post-tensioning cables) the recommended repairs did not meet the functionality requirements of the facility or required additional value engineering in order to reduce potential cost. The project received one bid on August 21, 2007 by Essex Construction in the amount of $130,600.00. Sufficient funds are available in the Booth-Kelly budget to accomplish the repair. The ongoing cost to the Booth-Kelly Center for leasing the shoring towers to stabilize the structure until repair of the trusses can be completed is approximately $2,000.00 a month. This project is unique in complexity and overall work hours needed for the repair which is possibly why more bids were not received. It is staffs recommendation to not retract the project to re-bid and that the bid submitted by Essex is a justifiable bid to accomplish the proposed repair. It is also staffs recommendation that although the Booth-Kelly facility is insured and a final reconciliation of overall cost coverage has not been determined from the City's insurance provider, the City should proceed with the repairs at this time. CITY OF SPRINGFIELD ENGINEERING DIVISION SPECIFICATIONS for PROJECT NO. P20538 Booth-Kelly Building B Truss Repair PRE~BID CONFERENCE Date: August 7,2007 Time: 2:00 P.M. Location: Booth-Kelly Bldg B 305 S. Fifth Street Springfield, OR 97477 BID OPENING Date: Augu~t 21, 2007 Time: 2:00 P.M. Location: Public Works Office City Hall . 225 Fifth Street Springfield, OR 97477 . \ : ..~., ":.,' . City of Springfield Keating Engineering Contractors Springfield Postmaster, $130,600.00 One Hundred Thirty Thousand, Six Hundred Dollars The a,?~ is the totai bid as entered herein ~~ mader's Signature Essex General Construction, Inc. Company Name This Project is funded neither in full or in part by State nor Federal Funds Book Number :IForms.PWlEngineeringIBid Book FormslBid Book Cover.doc - 07/06 3 ATTACHMENT 1 Page 1 Iii u~ . ~~ VICIN.ITY M F . ..~ e.~ e,OJ't\ol ~ l NOR1lI 1 5OlJTI.l Cffil \ \ ~ \ rrm.J II 6T1'SET eus P\.I'1P SUIL.PING BLOG B B ~" ~ ~P~ ., liZl. .IiZl P~ lliZl ~ IT C\J I-- z w :2: I o e::( I-- I-- e::( BOOTI4-KELL Y ~ NeAI'lJHI p~ NiEA ~ ~ PART 'Go' GlNDEl<eCN RAIL CAA5EJ; BOOTH KELLY - BUILDING B - TRUSS REPAIR .~ ': .-oIL. ATTACHMENT 3