HomeMy WebLinkAboutPermit Mechanical 1985-12-23
.
i'
I
.. RESIOaTIAL..
APPLICA./PERMIT
225 North 5th Street
SpringfieZd~ Oregon 9?4??
BuiZding Division
?26-3?53
Rece-:pt fi A.I".. 5 7~ 9
~
ef~
1 II.
I
.,cR' ~ ~
c~'~a.-J 14/1rL~~)
Job Location:
Ascessors Map #
Subdivision:
T= Lot #
OLmer:
RtuL4- ~' I
1/<103 (l/J~;J
AiUh>ess:
City:
NebJ
Addition
Remodel
:1.1obile Home
1.2~ ;23-YS-
Date of Application
Contractors
General
Plwnbing
Eledrical
Mechar.ical
Phone:
11/1- ::253::2
Zip:
aJdiJ7!4I/ne
Valau f 1 tJO
Address
-
h/;D{' iJeJ //taJ
ConstT'Uction Lender,
~
.
.fJ
/~U~(JIC
Signed:
Date:
pr;.
--- I ~ -0<3 - RC;-
Lise. #
Expires
Phone
It is the responsibility of the permit hoUier to see that all inspections are made at the proper time, that each ~ess is.re~D:e
from the street,' and that the permit card is located at the front of the property.
*Eui!ding Division approved plan shall remain on the Building Site at all times.
PJ?OC!::DURE FOR INSPECTION R!::QUEST:CALL 726-3769 (recorder) state your City designated job number, job adaGss, type of ins pecti en
requested and bJr.en you bJill be ready for inspection, Contractors or OLmel's name and phone number. Requests received before 7:00 ~
:..'ill be made the same dc.y, requests mc.de c.fter 7:00 am will be made the next :Jorking day. 2:L::-//'L~L
Your City Desigr~ted Job Number Is: L-J. ~~~
Reauired Insvections
O SITE INSPECTION: To be made
excavation, but prior to set
forms. '
o
after
up of
UNDERSLAB PLUMBING, ELECTRICAL &
NECHANICAL: To be made before any
work is covered.
o
FOOTING & FOUNDATION: To be made
after tre~ches are excavated and
forms are erected, but prior to
pouring concrete.
UNDERGROUND PLUMBING} SEWER, WATER,
DRAINAGE: To be made prior to fil-
ling trenches.
CJ
[J
UNDERFLOOR PLUlfBING & MECHANICAL:
To be made prior to installation of
floor insulc.tion or decking.
POST AND BEAM: To be made prior to
installation of' floor ins~lation or
deckiY/{i.
ROUCH PLUMBING. ELECTRICAl, & MECH-
ANICAL: No :Jork is to be covered
until these inspections have been
. made and approve::!.
FIREPLACE: Prior' to plc.cir.g facing
mc.terials and before framing inspec-
tion.
I FRAl!ING: Must be requested after
~ approval of rough plumbing, electri-
cal & mechanical. AlZ roofing
bracing 8 chimneys, etc. ~~st be
,completed. No work is to be con-
" cealed until this inspection has
'been made and approved.
~
[]
LJ
D
INSULATION/VA PO.'? BARRIER INSPECTION: ,
To be made after all insulation ar~
required vapor barriers are in place
but before any lath, gypsum board or
wall covering is applied, and before
any insulation.is concealed.
DEMOLITION OR ;~!OVED. BUILDliiGS
=:J Sanitary s":.Jer aapped ~t p~opertii line
~ Septia tank p~~ed and filled with gra~el
I Final - T,'hen above ite;ns are co,-:rpleted
~ and bJhen demolition is complete or stru~-
ture moved and premises aleaned up.
Nobile Homes
~ Blocking and Set-up
~PlUmbing connections sewer ar~ wc.ter
r. Electrical Connection - Blocking, set-u:;
~ and plumbing connections ~~st be approved
, before requesting ,elec~riaal inspection
=:=J Accessor~'Building
I Final - !1ft'<:r porches, skirting, decks,
~ etc. are completed.
o
FINAL PLUMBING
All project conditions, such as the installation of street trees, co~letion of the
required landscc.pir.g, etc., must be satisfied before the BUILDING FINAL can be requested.
=:J
.~
=:J
FINAL I1E::HANICAL
o
FINAL BUILDING: The Final Building Inspection must be requested c.fter the Pinal Plwnbir.q
Electrical, and Mechanical Inspections have been made and approved.
FINAL ELECTRICAL
D DRYWALL INSPECTION: To be mad,e
after all drYbJall is in place,
but prior' td any taping.
O MASONRY: 'Steel location, bond
beams, grouting or verticals in,
accordance with U.B.C. Section
E. 2415.
WOODSTOVE: After installation is
completed.
D CURB & APPROACH APRON: After, fo1'T71s
are erected but prior to pouring
concrete.
D
SIDEWALK & DRIVE~/AY: For all con-
crete paving within street right-
of-bJG.Y, to' be made after all exca-
vating complete & fOmI work & sub-
base material in place.
.*ALL MANHOLES AND CLEANOUTS MUST BE ACCESSIBLE, ADJUST/rENT TO BE I,L~DE AT NO COST TO CITY Pczfe 1 of 2
o
FENCE: ~'hen complete -- Provide
gates or movable sections through
P.U.E.
o
I JOB N~~}R,c)II5([ SOLAR Afr.ESS REQ.-
I Zone:
I Lot Sq. Ftg.
j% af lot Caverag~
I!! of Stor>ies
,Total Height
I
Topography
i ITE!.f
I Main
I Gc:race
I Carport
I
Accessor!/
SQ.FTG
S.D.C.
TOTAL VALUE
(va~uc)
1.5 x
Building Permit
State Surchax>ge
Total Ch.ar-ges
lITEM
I Fi::::tures
I
iResidential (1 bath)
I
I Sanitary Sewer
I fiat er
I
Plumbing Pemit
State Surcr.arge
TotaZ Ch1::raes
I ITEf.:
I Res. Sa. fta.
IN$W/Extend Circuits
I Temporax>y Service
I
Ele~trical Permit
State Sur~harqe
Total Charqes
I
Occupancy Gre.
I NO. I FEE
I I
I
I
I
I
NO. I FEE
I
I
,/
I
lITEM I NO. F!;'!;'
uu
Purn:zce PTU' S I
Exhaust Hood I
I
I Vent Pan I
i I
i Waodsto:Je
I I
Permit Issuance
Mechanical Perrrrit
State Surcharae
Total Charaes
-- ENCROACHMENT--
Se~~r>ity Deposit
I Storaqe
I Maint~nan~e
I Permi t
! Total Charaes
I
i CW'bcu't;
i Sidewalk
,
1 Pen:Je
i
: Electrical Label
i Mobi le Home
TOTAL AMOUNT DUE: *
LOT TYPE
Interior
Corner-
Panhandle
Cul-de-sac
x
Value
I
I I
I I
I I
L -1
I J*
1
I
I
I *
CHARGE
CHARGE
CHARGE
I
I
I
/S' ,00
-~I
IS. hf) I *
I
I,
I
I
I
r
I
I
I
I
I
I
I
I
I
I
I
Is. &0
~,
...,
~ .._'
'" .:'-'
L - CO G~
Type/Const: ~
I '
Access. I
I I
I
I
I
"
I Lot Paces -
I
I P.L.
!North
lEast
ISouth
I~!est
Setbacks
i House I Carage
I i
I I
I I
Bedrooms:
Enerm.{ Sources
Heat
Water Heater
Range
Pireplace
Woodstove
T1me
Paes
Building Value & Permit
This pernr:t is granted on the express condition that the said construction
shall, in all respects, conform to the Ordinance adopted by the City of
Springfield, including the Zoning Ordinance, regulating the construction
and use of buildings, and may be suspended or revoked at any time upon vio-
lation of any provisions of said Ordinances.
Plan Check Fee:
Date Paid:
/Receipt Ii:
I Signed:
Plumbing Permit.
I
I
, .
No person shall construct, install, aZter or change any new, or existing
plumbing or drainage system in whole or in part, unless such person is the
legal possessor of a valid plumber's license, except that a per-son may do
plumbing work to property which is ow~ed, leased or operated by the appli-
cant.
Electrical Permi t
Where State Law requires tr.at the electrical work be done by an Electrical
Contractor, the electrical portion of this permit shall not be valid until
the label has b~en signed by the Electrical Contractor.
Mechanical PermH
Plan Examiner
Vate
*
I
I *
I
I HAVE CAREPULLY EXA]l}INED the completed application for permit, and do
hereby certify that all inforomation hereon is true and correct, and I
further certify that any ar4 all work performed shall be done in accor-
dance with the Ordinances of the City of Springfield, and th~ L~~s of the
* State of Oregon pertaining to the work described herein, and that NO OCCU-
PANCY will be made of any structure without permission of the Building Di-
vision. I further certify that only contractors and g~plQyees who are in
compliance with ORS 701.055 will be used on this project
~.~ /.,;:),:;,)3-':5.
'." -z;.....----z:;'-~ ~ ~ -- ___ l\_
fSigned Date