Loading...
HomeMy WebLinkAboutPermit Building 1995-10-25 SPRINGFIELD Page 1 RESIDENTIAL PERMIT APPLICATION CITY OF SPRINGFIELD COMMUNITY SERVICES DIVISION BUILDING SAFETY Job Number: 951684 225 North Fifth Street Springfield, OR 97477 Office: 726-3759 Inspection Line: 726-3769 Location of Proposed Work: 6739 CAMELLIA CT Assessors Map #: 17023444 Lot: 18 Block: Tax Lot #: 00817 Subdivision: ANTHONY HEIGHT Owner: SKYLINE HOMES Address: 1205 CLEARWATER LANE Phone #: 726-5560 City/State/Zip: SPRINGFIELD, OREGON 97478 Describe Work: S.F. RESIDENCE NEW Contractor Const. Contractor # Expires Phone General: SKYLINE HOMES 0010223 1205 Clearwater Ln Springfield OR 9 05/11/96 726-5560 QUAD AREA: 4RSE # OF UNITS: 1 CONSTR. TYPE: VN WATER HEATER: E SQ FOOTAGE: 1838 OFFICE USE -- LAND USE: 1111 ZONING CODE: LDR # OF BDRMS: 3 RANGE: E # OF BLDGS: 1 OCCY GROUP: R3 HEAT SOURCE: FE INSUL PATH: P1 To request an inspection, call the 24 hour recording at 726-3769. All inspections requested before 7:00 a.m. will be made the same working day, inspections requested after 7:00 a.m. will be made the following work day. REQUIRED INSPECTIONS --- TEMPORARY POWER SITE - To be made after excavation but prior to setting forms. FOOTING - After trenches are excavated. FOUNDATION - After forms are erected but prior to concrete placement. UNDERFLOOR PLUMBING - Prior to insulation or decking. UNDERFLOOR MECHANICAL - Prior to insulation or decking. POST AND BEAM - Prior to floor insulation or decking. INSULATION - Floor; prior to decking wall/Ceiling; Prior to cover WATER LINE - Prior to filling trench. SANITARY SEWER LINE - Prior to filling trench. STORM SEWER LINE - Prior to filling trench. ROUGH PLUMBING - Prior to cover. ROUGH MECHANICAL - Prior to cover. ROUGH ELECTRICAL - Prior to cover. ELECTRICAL SERVICE - Must be approved to obtain permanent power. FRAMING - Prior to cover. INSULATION - Floor; prior to decking Wall/Ceiling; Prior to cover DRYWALL - Prior to taping. CURB CUT - After forms are erected'but prior to placement of concrete. SIDEWALK - After excavation is complete, forms and sub-base material in place. FINAL PLUMBING - When all plumbing work is complete. FINAL MECHANICAL - When all mechanical work is complete. FINAL ELECTRICAL - When all electrical work is complete. ROUGH GAS - after line is installed and capped if not attached to an appliance FINAL GAS - When all gas work is complete. GAS SERVICE - After line is installed and line has been connected to a minimum of one appliance. Pressure test done at this point. Job Number: 951684 Page 3 --- BUILDING VALUE, PLAN CHECK AND BUILDING PERMIT --- This permit is granted on the express condition that the said construction shall, in all respects, conform to the Ordinance adopted by the City of Springfield, including the Development Code, regulating the construction and use of buildings, and may be suspended or revoked at any time upon violation of any provisions of said ordinances.. Plan Check Fee: 256.10 Date Paid: 10/20/95 Received By: LORNE PLEGER Plans Reviewed By: LORNE PLEGER Date: 11/20/95 Building Site Reviewed BY~ LISA HOPPER Receipt Number: 19353 --- ADDITIONAL COMMENTS --- DRIVEWAY REQUIRED TO BE PAVED 2 STREET TREES REQUIRED By signature, I state and agree, that I have carefully examined the completed application and do hereby certify that all information hereon is true and correct, and I further certify that any and all work performed shall be done in accordance with the Ordinances of the City of Springfield, and the Laws of the State of Oregon pertaining to the work described herein, and that NO OCCUPANCY will be made of any structure without permission of the Community Services Division, Building Safety. I further certify that only contractors and employees who are in compliance with ORS 701.055 will be used on this project. I further agree to ensure that all required inspections are requested at the proper time, that each address is readable from the street, that the permit card is located at the front of the property, and the approved set of plans Willi/emain ;nJf:: site at all times during construction. r- ~ WCp--- ;1- 20-7~ Date siinature "-' --- VALIDATION Date Paid: I 7~~7 / {/- :2L)/<JS- .~"'SC;~ 58 ~~. 1 Receipt Number: Amount Received: Received By: CITY OF SPRINGFIELD SYSTEMS DEVELOPMENT CHARGE (RESIDENTIAL) Name or Company: SKYLINE HOMES Location: 6739 CAMELLIA CT Developemer;tt Type: R Building Size: Job No.: 951684 Lot Size: 1. STORM DRAINAGE Impervious Sq Ft 2656 X 0.210 Per Sq Ft 2. SANITARY SEWER - CITY Number Of PFUs 18 X 43.43 Per PFU (see Page 2) 3. TRANSPORTATION Number Of Units 1 X X Cost Per Trip 437.93 X Trip Rate 1. 010 X $442.31 Transportation Total 4. SANITARY SEWER - MWMC Number Of PFUs 18 x X Per PFU + 18.750 + MWMC Admin Fee 10.00 MWMC CREDIT If Applicable (see Page 2) TOTAL - MWMC SDC SUBTOTAL - (Add Items 1, 2, 3 & 4) 5. ADMINISTRATIVE FEES Base Charge (Subtotal Above) X 0.50 TOTAL SDC Reviewed By: TROY MCALLISTER Date: 10/25/95 Page 1 Sq Ft $557.76 $781.74 $442.31 . $347.50 $69.99 $277.51 $2,059.32 $102.97 $2,162.29 Job Number: 951684 Page 2 FIXTURE UNIT CALCULATION TABLE Fixture Type Number of New Fixture Unit Equivalent Fixture Units Bathtub Drinking Fountain Floor Drain ,Interceptors For Grease/Oil/Solids/Etc Inteceptors For Sand/Auto Wash/Etc Laundry Tub/Clotheswasher Clotheswasher - 3 Or More Receptor For Refrigerator/Water Station/Etc Receptor for Commercial,Sink/Dishwasher/Etc Shower, Single Stall 'Shower, Gang Sink, Bar, Commercial, Residential Kitchen Urinal, Stall/Wall Wash Basin/Lavatory, Single Water Closet, Public I:qstallatibn Water Closet, Private Miscellaneous 1 o 0' o o 1 o o o 1 0' 1 o 2 o 2 o 2 1 2 3 6 2 6 1 3 2 2 o o o o 2 o o o 2 o 2 o 2 o 8 o 2 2 1 6 4 TOTAL FIXTURE UNITS 18 CREDIT CALCULATION TABLE: Based ,on assessed value. after annexation date, credits (calculations are by $1000) If improvements occured" are calculated separately. Year Annexed: 1979 Credit For Parcel Or Land Only If Applicable: 20,170 X 3.47 69.99 Improvement (if after annexation date) : o X 3.47 0.00 CREDIT TOTAL = $69.99 (If land value ,is multiplied. by 1 then the parcel/land credit is not accurate.)