HomeMy WebLinkAboutPermit Mechanical 1988-10-27
.~ :~". ''-~'" :' .;. ,-' -":J .
-' -, .
-'1',=."1'__;::""
,,: .. \.. .'<:....~c.:..-. . ....
,......~:..-...
~', '.-' ~. :;;;....~r.e.i.~~~~.:..~.(,,~.....J,:'...-..;.. .~....:.' ^.:,
=. ..J_,......,.":"-.,,~;
.. RE 5 I D ~ _ J T I A l · ·
APPLICATION/PERMIT
225 North 5th Street
Springfield, Oregon 97477
Building Division
726-3753
pl'
Job Location:
(I) 1 L(~
ASGesGors Map #
Subdivision:
OlJner:
/ ~;v;th
(f) 1 Lf~
/lJ~
(ld..0uLtt a
Address:
Ci ty :
NmJ
Addition
Remodel
Uobile Home
f6/~ 7 --ff
C f'oV\s;"I.
Date of Application
Contractors \[ \ ~,
I
N\.
General
(~~ ---rf La- (J-:f..
T= Lot #
&- Phone:
1(j/j-- ?CI rJ {j
I
Rece-:.pt 1/
'~&10
OJ -.i7-'
I I ~ J
Zip:
D"'pO;~Ck-t-1
. d- ~rJ
I fit r02
Value
Addres3
b/~\
\
Signed:
Date:
CD
/ (J....-:::2 7 - elf
Lisc;# 39 ~ 'II) Expires
Phone
Plwnbing h
I Electrical '~
f.fechar.ic.:zZ .. ') F'A l\ t--Q }..t) I'> Q A Jr'
::::::.tir:.:,:':",y 'f t" p,"""" hold~ ~ ~.. .hat an i""p.eti~ ~. =d, at tho prap~ tim,_ that 'ce' ""","", i. """"",,
from the street, and that the permit card is ~ated at the front of the property.
~Bui!ding Divicior: approved Flan shall remain on the Building Sit3 at all times.
PROCEDURE FOR INSPECTION RE'QUEST:C4LL 726-3769 (recorder) state your City desig=ted job number, job adiress, type of in3pec;;icn
requested and when you will be ready for inspection, Contractors 01' OlJners name end phone number., ~ Request~"e ~f've before 7:00 ~
r..'ill be made the same dc.y, requests made after 7: 00 am wi II be made the next :Jorking day. 0 () U Lf' 0 ,
Your City Desigr~ted Job Number Is:
Reaui~ed IrsDe~tions
SITTS INSPECTION: To be made after
excavation, but prior to set up of
forms.
UNDERSLAB PLUMBING, ELECTRICAL &
NECHArJICAL: To be made before any
work is covered.
o
~'
o
FOOTING :11 FOUND,1TION: To be made
after trenches are excavated and
forms are erected, but prior to
pouring ~oncret;;.
UND'SRGFlOUND PLUMBING, SE'WER. W.1TER.
DRAINAGE: To be made prior to fil-
lir.g trenches.
D
o
UNDERFLOOR PLm.$ING & MECHANICAL:
To be made prior to installation of
f100r insuLation or de~king.
POST AND BEAM: To be made prior to
installation of floor insulation or
decking .
ROUGH PLUMBING. ELECTRICAl, & MECH-
ANICAL: No work is to be covered
until these inspections have been
made and approved.
FIREPLACE: Prior to placir.g facing
materials and before framing inspec-
tion.
I FRAMING: Must be requested after
~ approval of rough plumbing, electri-
,cal & mechanical. AU roofing
, bracing & chimneys, etc. m"~st be
,. completed. No work is to be con-
~ cealed until this inspection has
"been made and approved.
o
D
D
o
INSULATION/VAPOR BARRIER INSPECTION:
To be made after all insul~tion ~A
required vapor barriers are in pLace
but before any lath, gypsum board 01'
wall covering is applied, and before
any insulation is concealed.
DEl-fOLITIOH OR ;~;OVE!J BUILDIilGS
:=J Sani tary sC'.Jer capped at p~opart7:i lir:e
~ Septic tank p~ed and fiLled with gra~eL
---, Pinal - ~~en above items are ccmpleted
~ and when demolition is complete or struc-,
ture moved and premises cleaned up.
, Nobi le Hemes
~ Blocking and Set-up
~ Plumbing connections s~er and water
---, Electrical Connection - Blocking, set-u~
~ and plumbing connections nr~st be approved
before requesting electrical inspection
~ Accessord Building
~ Final - Aftar porcr.es, skirting, decks,
~ etc. are completed.
All project conditions, such as the installation of street trees, co~letion of the
required Landscepir:g, etc., must be satisfied before the BUILDING FINAL can be requested.
D FINAL PLUMBING
=:J FINAL MECHANICAL
~ FINAL ELECTRICAL
~
o
FINAL BUILDING: The Final BuiLding Inspection must be requested after the FinaL PLumbinJ
Electrical, and Mechanical Inspections have been made and approved.
o
DRYWALL INSPECTION: To be made
after aU drywaU is in place,
but prior to any taping.
location, bond
or verticals in
U.B.C. Section
~ALL MANHOLES AND CLEANOUTS MUST BE ACCESSIBLE, ADJUST/fEIIT TO BE /.MDE AT NO COST TO CITY , Page 1 of 2 I
O MASONRY: Stee l
beams, grouting
accordance with
2415.
JiJ
D
WOODSTOVE:
completed.
After instalLation is
1:Jy
CURB & APPROACH APRON: After forms
are erected but prior to pouring
concrete.
o
SIDEf-lALK & DRII7i:f-lAY: For all con-
crete paving within street right-
of-way, to be made after all exca-
vating oomplete & form work & sub-
base material in pLace.
D PENCE:~n complete -- Provide
gates. m vable sections through D
P.U.E. ..: ~\ v ".,
_~ ~{~ ;:m~~vj
fay ~ev-t
IJOB
Izone:
NO. C{;5DCf ref SOLAR ACF~SS REQ.- C
l-COG-1t
.......".. .' .~
Occupancu Grouv.
Type/Cor.st:
Becbooms: '.
fn2rOl./ Sour>ces
Heat
Access. Water> Heater>
Ranqe
Fireplace
Wooa;:;tOl:e
TUDe
Lot Sq. Ftg.
~ of lot Cover>ag;;
# of Stories
ITotal Height
I
ITopography
I
lITEM SQ.FTG
LOT TYPE
Lot Faces -
Panhandle
Cul-de-sac
Setbacks
P.L. House Carage
Nor>th
E:as t
South
West
I .
Interior
Corner
-- F2es
X Value
Building Value & Permit'
Main
Garace
This permit is gr>anted on the expr>ess condition tl~t the said const1'Uction
shall, in all r>espects, conform to the Or>dinance adopted by the City of
Spr>ingfield, including the Zoning Cr>dinance, r>egulating the construction
and use of buildings, and may be suspended or> r>evoked at Gny time upon vio-
U2tion of any Pr>ovisions of said Or>dinances. '
CarDor>t
Accessor>u
S.D.C.
TOTAL VALUE
Ivci-uc)
1.5 :r:
, *
Building Permi t
Total Charges
Plan Check Fee:
Date Paid:
Rec;;ipt #:
Signed:
I
I
I
I
State Surcharge
I ITEM
FixtUI'es
I NO. I FEE
CHARGE
Plumbing Perrrdt
Resid2ntial (1 bath)
I Sanitary Sewer>
I Water
I
No person shall const1'Uct, install, alter or> change any new or existing
plumbing or> drainage syste~ in whole or in part, unless such per>son is the
legal possessor> of a valid plumber>'s license, except that a person may do
plumbing work to property whioh is owned, leased or operated by the appli-
cant. '
Plumbing Perr::it
State SurcJ:arge
Total Char>oes
I h'E,'!
I
..,0.
FEE
C.~'Aj-;CZ
Electrica I
Per mi t
Res. So. fta.
,N~/E:r:tend Circuits
I
I Temporary Service
\ .
: I
I
Where ,State LaW requires tr.at the electrical work be done by an Electrical
Contractor, the electrical portion of this permit shall not be valid until
the U2bel hasb;;en signed by the Electrical Contractor.
'Electrical Permit
State Surcharqe
Total Charces
IT2M
Furnace ETU' S
E=haust Hood
I No.l F"""
I
C!iARCE
Me c h ani c a I Permit
i Vent Fan
I
i wO[(YM -f~
-- ENCROACHMENT --
I
I JtJ. H>
I
I
I '- '1S
''-60.7-? *
1
..-' W,
i
,I
Permit Issuanca
15 . bVD ---'~~
Mechanica I Permi t
State SurcharQe
Total Charaes
Se(?'.lri ty D2/7osi t
Storage
Plan Examiner
vate
Total Char>aes
I HAVE, CAREFULLY EXAMINE:D the completed application for permit, and do
hereby certify that all information hereon is true and correct, and I
further certify that any ar.d all work per>for>:ned shall be done in accor-
dance with the Ordinances of the city ,of Springfield, and tha Lo:,,;s of the
~ State of Oregon pzrtaining to the worK describcdher>ein, and that NO OCCU-
PI!NCYwi'll be made of any structur2 without permission of the Building Di-
vision. : I further certify that only contT'aC!tor>s a"d e,~pl.:Jyees who are in
co~plia~ce with ORS 701.05t will be used on this pr>oject
,
MaintenaYU)e
Permi t
Curbcut
Sidewalk
Fence
Electrical Label
MobiZe Home
.:Jl'AL Ai-fOUlt1' DUG:'
30.75"
,
i
/~ ~ ~/J-"-!)--
I
t0kp4,B
/ /