HomeMy WebLinkAboutPermit Building 1995-9-12
....R'NGF'E'" ~ ., ..
~ ." · ..... '1ilr(!.i.'l'if~l:t~'AI.)iI:t~.-J4Y~
Page 1
RESIDENTIAL PERMIT APPLICATION
CITY OF SPRINGFIELD
COMMUNITY SERVICES DIVIsION
BUILDING SAFETY
Job Number: 951348
225 North Fifth Street
Springfield, OR 97477
Office: 726-3759
Inspection Line: 726~3769
Location of Proposed Work: 7007 CAMELLIA ST 7009
Assessors Map #: 17023533
Lot: 11 Block:
Tax Lot #: 05001
Subdivision: CASCADE KNOLL
Owner: RON ROBERTS
Address: 200 CRESTMONT
Phone #: 805-543-6078
City/State/Zip: SAN LUIS O~ISPO! CA 93401
Describe Work: DUPLEX
NEW
Contractor
Const.
Contractor #
Expires
Phone
General: MINIUM 0062682
8745 Thurston Rd Springfield OR 974
Plumbing: DON LEWIS 0033076
500 Greenfield St Eugene OR 9740416
Mechanical: MINIUM 0062682
8745 Thurston Rd Springfield OR 974
Electrical: HAUCK HAMMER 0089423
353 S 68th Place Springfield OR 974
12/11/96
747-8495
06/10/95
688-1931
12/11/96
747~8495
03/05/96
744-1165
QUAD AREA:4RSE
# OF UNITS: 2
CONSTR, TYPE: VN
WATER HEATER: E
SQ FOOTAGE: 2540
OFFICE USE --
LAND USE: 1120
ZO~ING CODE: LDR
# OF BDRMS: 4
RANGE: E
# 'OF BLDGS: 1
OCCY GROUP: R3
HEAT SOURCE: WH
INSUL PATH: SGC
To request an inspection, call the 24 hour recording at 726-3769.
All inspections requested before 7:00 a,m. will be made the same working day,
inspections requested after 7:00 a.m. will be made the following work day,
REQUIRED INSPECTIONS' ~--
SITE - To be made after excavation but prior to setting forms.
FOOTING - After trenches are excavated,
FOUNDATION - After forms are erected but prior to concrete placement:
UNDERGROUND ELECTRICAL - Prior to Cover.
UNDERFLOOR PLUMBING ~, Prior to insulation or decking.
UNDERFLOOR MECHANICAL - Prior to insulation or decking,
POST AND BEAM - Prior to floor insulation or decking,
INSULATION - Floor; prior to decking Wall/Ceiling; Prior to cover
SANITARY SEWER LINE - Prior to filling trench.
STORM SEWER LINE - Prior to filling trench.
WATER LINE - Prior to filling trench.
ROUGH PLUMBING - Prior to cover.
ROUGH MECHANICAL Prior to cover.
ROUGH ELECTRICAL - Prior to cover.
~LECTRICAL SERVICE ~ Must be approved to obtain permanent power.
FRAMING - Prior to cover.
INSULATION - Floor; prior to decking Wall/Ceiling; Prior to cover
DRYWALL - Prior to taping.
FINAL PLUMBING - When all plumbing work is complete.
FINAL MECHANICAL - When all mechanical work is complete.
FINAL ELECTRICAL - When all electrical work is complete.
FINAL BUILDING - When all required inspections have been approved and
the building is complete, "
Job Number: 951348
Page 2
Lot Faces: N
Topography: 17
Solar Approved: Y
Lot Sq, Ft.: 6000
Total Height: 24
,Lot Type: CORNER
Setbacks
S W E
..20 19 5
Lot Coverage: 33 %
Setbk From NPL: 50
N
House
Garage 18
Item
Main
Garage
Total Value
BUILDING PERMIT
Square Feet x
1916
623,5
$/Square Feet
56,2
14,1
Value
107,679.00
8,791.00
116,470.00
Building Permit Fee
Surcharge/Admin
471.25
37.70
TOTAL FEE
{A}
508.95
SYSTEMS DEVELOPMENT CHARGE (SDC) ---
(B) 3,882.86
Systems Development Charge is due on all undeveloped properties within the City
limits and the Citys Urban Growth Boundry which are being improved.
PLUMBING PERMIT
Item
Residential Bath(s)
320
Fee
320,00
Plumbing Permit
Surcharge/Admin
320.00
25.60
TOTAL CHARGE
(C)
345.60
MECHANICAL PERMIT ---
Exhaust Hood
Vent Fan
Dryer Vent
2
9.00
6.00
6.00
Mechanical Permit
Issuance
Surcharge/Admin
21.00
10,00
1.68
TOTAL PERMIT
(D)
32.68
MISCELLANEOUS PERMITS
Surcharge/Admin
Sidewalk
Curb Cut
WILLAMALANE SDC
ELECTRICAL PERMIT
0.00
17.50
15.70
1,848.00
216.00
TOTAL MISCELLANEOUS PERMITS
(E)
2,097.20
{Excluding Electrical}
unless otherwise noted
TOTAL AMOUNT DUE
'{A, B, C, D, and E combined}
6,867.29
BUILDING VALUE, PLAN CHECK AND BUILDING PERMIT ---
This permit is granted on the express ,condition that the said construction
shall, in all respects, conform to the Ordinance adopted by the City of
Springfield, including the Development Code, regulating the construction and
use of buildings, and may be suspended or revoked at any time upon violation
of any provisions of said ordinances.
Job Number: 951348
Page 3
Plan Check Fee:
Received By:
Plans Reviewed By: DON
Building Site Reviewed
306.31
Date Paid: 08/23/95
Receipt Number: 18797
MOORE Date: 99/11/95
By: LISA HOPPER
--- ADDITIONAL COMMENTS ---
PATH 1; SEPARATE ELECTRICAL PERMIT IS REQUIRED.
DRIVEWAY REQUIRED TO BE PAVED
4 STREET TREES REQUIRED
By signature, I state and agree, that I have carefully examined
the completed application and do hereby certify that all information hereon
is true and correct, and I further certify that any and all work performed
shall be done in accordance with the Ordinances of the City of Springfield,
and the Laws of the State of Oregon pertaining to the work described herein,
, and that NO OCCUPANCY will' be made of any structure without permission of the
Community Services Division, Building Safety, I further certify that only
contractors and employees who are in compliance with ORS 701,055 will be
used on this project,
I further agree to ensure that all required inspections are requested at the
proper time, that each address is readable from the street, that the permit
card is located at the front of the property, and the approved set of plans
Win_ ~ all times during construction. ?' r / L.- _ /?S/'
. ~ ------ -./
Slgnature Date
--- VALIDATION
Date Paid:
/?5?Q~
q;;2nF
'(' ,
0~C:>7, Z?
"&~
Receipt Number:
Amount Received:
Received By:
Job. No.
q~\25\~
SYSTEM DEVELOPMENT CHARGE
WORKSHEET
NAME: \R\l\ Jrblx'l:.:s PHONE: ~r:f6. 6t '3.ldJ1?{
ADDRESS:2JYJ 0~OO_t-'.IJ'm. . STATE: tA ZIP: q~\
. \
LOCATION OF PROPOSED BUILDING SITE:
Street Address: ~t)D\...\ \DOq 0fJJ\f\fL~jJL.J'
Plat Name: 0 {\ k)0~ Knoll Tax Lot Number: \1D~ ~~~ ():i1)1
- .-. '- -
1. .DEVELOPMENT TYPE (Check appropriate dwelling(s). SDC calculations and dwelling t
ype definitions are on the back,)
A. Sin9le-Familv Detached.
Single Family home
Manufactured home not in a park
, NO. OF UNITS
X $1,000 per unit = $
B. .Sinale-Familv Attached,
NO. OF UNITS
f-
X $924 per unit = $ \ P1t~
C. Multi-Familv Aoartment
NO. OF UNITS
X $692 per unit = $
D. .ManufactlJred Home Pa~
2. SDC CREDIT (if applicable) SDC-payer must furnish proof of
Willamalane Credit approval. See SDC Credit Worksheet.
$
$
\ <(j\- f)
y
t8~
NO. OF UNITS
X $699 per unit =
WILLAMALANE SDC
$
3. TOTAL WILLAMALANE NET SDC ASSESSED
(if SDC reduced for Credit)
1m )~Q
Develop~e~?s~~~(-O::partment
City of Springfield
$
'fl/
Date
/2 / JT
~ .. r"
SPR'NGFOELD~ .
__~ .. '. 1;Jr(h'"t1;/~~'Jf.)rl::t'l7..)4ft
-....~
Page 1
CITY OF SPRINGFIELD SYSTEMS DEVELOPMENT CHARGE
(COMMERCIAL / RESIDENTIAL)
Name or Company: RON ROBERTS
Location: 7007 CAMELLIA ST 7009
Developement Type: R Building Size:
Job No,: 951348
Lot Size:
Sq Ft
1. STORM DRAINAGE
Impervious Sq Ft 2939 X 0,210 Per Sq Ft $617.19
2. SANITARY SEWER - CITY Q
,Number Of PFUs 36 X 43,43 Per PFU $1,563.48
(see Page 2)
3. TRANSPORTATION
Number Of Units
2 X
X Trip Rate
1. 010 X
X
Cost Per Trip
437,93
$884,62
Transportation Total
$884.62
4. SANITARY SEWER - MWMC
Number Of PFUs
36
X
X
Per PFU +
18,750 +
MWMC Admin Fee
10,00
$685,00
MWMC CREDIT If Applicable (see Page 2)
$52,33
TOTAL - MWMC SDC
$632,67
SUBTOTAL - (Add Items 1, 2, 3 & 4)
$3,697.96
5. ADMINISTRATIVE FEES
Base Charge (Subtotal Above) X
0.50
$184.90
TOTAL SDC
$3,882.86
Reviewed By: TROY MCALLISTER
Date: 08/17/95
'.
SPRINGFIELD
~.
Job Number: 951348
Page 2
FIXTURE UNIT CALCULATION TABLE
Fixture Type
Number of
New Fixture
Unit
Equivalent
Fixture
Units
Bathtub
Drinking Fountain
Floor Drain
Interceptors For Grease/Oil/Solids/Etc
Inteceptors For Sand/Auto Wash/Etc
Laundry Tub/Clotheswasher
Clotheswasher - 3 Or More
Receptor For Refrigerator/Water Station/Etc
Receptor for Commercial Sink/Dishwasher/Etc
Shower; Single Stall
Shower, Gang
Sink, Bar, Commercial
Urinal, Stall/Wall
Wash Basin/Lavatory, Single
Water Closet, Public Installation
Water Closet, Private
Miscellaneous
2
o
o
o
o
2
o
o
o
2
o
2
o
4
o
4
o
2
1
2
3
6
2
6
1
3
2
4
o
o
o
o
4
o
o
o
4
o
4
o
4
o
16
o
2
2
1
6
4
TOTAL FIXTURE UNITS
36
CREDIT CALCULATION TABLE: Based on assessed value, If improvements occured
after annexation date, credits are calculated separately,
(calculations are by $1000)
Year ,Annexed: 1969
Credit For Parcel Or Land Only If Applicable:
15,080
X
3,47
52,33
Improvement (if after annexation date) :
o
X
3,47
0,00
CREDIT TOTAL =
$52.33
(If land value is multiplie9 by 1 then the parcel/land credit is not accurate.)