Loading...
HomeMy WebLinkAboutPlan, Final APPLICANT 6/26/2012hpe -111al OULMIllial y AC 1 Acer circinatum Vine Maple &, ht. multi-5tern, 045 FL 4 Fraxinug latlfolia Oregon Ash 1.5" cal. Matching, full, 54B NY5 3 Ny55a!5ylvatica Black Tupelo 2" cal. matching, full, 54B Tic, 21 I Iiia cordata L-itiie Lear, Linden 2" Cai. I matchirtig, iirnbed up to appr-ox. & Ft. I H T4 Thuja plicata 'Hogan' Hogan Red Cedar I -v ht. I matching, full, E34B 5HRUE35 AUC 15 Arbutus unedo 'Compacta' Dwarf Strawberry Bush 5 gal. matching, full COS 13 Cormus 5ericea Red -Osier Dogwood 5 gal. matching, full EUIAC 12 Euonymuq alatu5 'compacta, Dwarf Burning Bush 5,gal. matching, full I C, C-, 21 Ilex crerata'Compacta' Compact Japanese Holly 5 gal. matching, full MA a Mahorlia auquifolium Ore on Grape 5 gal. matching, full NAL7L 21 Nandina domeetica 'Lemon Hill' Lemon Hill Nandiria E3 gal. matching, full PHL 1 Philadelphu5 lewisil mock orange 5 gal. full POM 15 Folptichum munitum Sword Fern 1 gal matching, full R15 2 Ribe5 sanguineum Red flowering Current 5 gal. matching, full 5D 20 5piraea den5iflora Sub- alpine 5piraea 5 gal. matching, full 5VO & 5piraea douglasii Western 5piraea 5 gal. full VID 14 Viburnum davidii David Viburnum 5 gal -matching, matching, full VIT 7 Viburnum tinus 'S rip Bouquet' S ring Bouquet Viburnum 5 gal matching, full I vo 112 Vaccinium ovatum Evergreen Huckleberry 5 gal matching, full 6ROUNPC.,O\./ER5 A%NP FERENNIAL5 AU 24" O.C. Arctostaphylo5 uva-ursi Kinnikinnick 1 ]al. matching, full CAD 24" o.c. Carex denea ven5e Sedge 4" pots LAVA 15 Calluna vulgariq 'Aurea' Aurea Scotch Heather 5'eal. matching, full C105K 15 Cornus eericea'KeIqeyi' Dwarf Redtwig Dogwood 3 gal. matching, Full JP 24" o.c. Junru5 paten5 Spreading Rush 4" pots z RUIC, 24" O.C. Rubu5 calycinoldeE, 'Emerald Carpet' Emerald Carpet Rubus 4" pots matching, full ADJACENT BUILDING - OR EDGE OF PLANT BED NOTE: FINISHED GRADE, UNLESS INDICATED OTHERWISE, IS COMPRISED OF A HORIZONTAL PLANE 5" ABOVE THE sic -�c� HI&HE5T ADJACENT EDGE. SPAGIhIG "D" 5" MULCH (TAPERS TO 1" AT 51VErOLK) FINISHED GRADE PLANTING 501L (SEE SPECIFICATIONS FOR DEPTH) SPACING I./ ROW /1% SPACING I 14k7 D ROW A . , .. 4 V 31, O.G. 2.6" 151, Q.G. 15.611 61, O.G. 5.21 24" O.C. :20.5" II- q,1 O.C. 7.51, 301, O.C. :26.0" 121, O.C. 10.4" 3611 O.C. 30.011 151, O.C. 15.01, 45" O.C. 41.5" ADJACENT PAVING L�&ROUNPCOVER 5FAC.,IN6 PIAOF�AM J2 PLANT BEP EPOE AT 'AV EMENT A. 501L PREPARATION LAWN AREAS 1. FINISHED ELEVATION OF 5UB-BA5E TO BE 5" MINIMUM BELOW FINISHED GRADE. 2. TILL 5U56RADE THOROUGHLY TO A DEPTH OF 6" MINIMUM PRIOR TO PLACEMENT OF TOPSOIL. 5. PLACE 5" SANDY LOAM TOP501L OVER TILLED 5UE36RAPE. ALLOW FOR DEPTH OF SOD. ADD 15-5-10-10 FERTILIZER TO TOP501L AT A RATE OF 20 L55. PER 1000 5F. ROTO-TILL AMENDMENTS AND TOPSOIL TO A DEPTH OF 5-10" MINIMUM. PLANT BEDS 1. FINISHED ELEVATION OF 5UB-BASE TO BE 15" MINIMUM BELOW FINISHED GRADE. 2. TILL5U56RADE THOROUGHLY TO A DEPTH OF 5" MINIMUM PRIOR TO PLACEMENT OF TOPSOIL. 3. PLACE 15" MINIMUM OF TOPSOIL OVER TILLED SUB&RADE. ADD 4" OF ORGANIC MATERIAL AND 15-5-10-10 FERTILIZER TO TOPSOIL AT THE RATE OF 20 L55. PER 1000 5F. ROTO-TILL AMENDMENTS AND TOP501L TO A DEPTH OF 5" MINIMUM. 4. PROVIDE 5" OF SHREDDED FIR BARK MULCH OVER ALL PLANT BEDS. 5TORMkNATER PLANTING AREAS 1. FINISHED ELEVATION OF 5U5-BASE TO APPROXIMATELY 12" MINIMUM BELOW FINISHED GRADE (EXCAVATED TO BAR RUN). 2- PLACE 12" MINIMUM OF TOPSOIL OVER TILLED SU56R.ADE. SEE ENGINEERS DRAWINGS. SUBMIT SAMPLE OF TOP501L FOR APPROVAL BY CIVIL ENGINEER PRIOR TO CONSTRUCTION. 3. PROVIDE 1" OF PEA GRAVEL MULCH OVER BOTTOM OF 5TORMAPS4ATER AREA. PROVIDE 51, OF SHREDDED FIR BARK MULCH ON SIDE SLOPES. B. PLANT MATERIAL 1. PROVIDE ONLY HEALTHY, FULL PLANT MATERIAL AT SIZES INDICATED. 2. PLANT 5U55TITUTION5 TO BE APPROVED BY LANDSCAPE ARCHITECT. 5. PLANT LAYOUT TO BE APPROVED BY LANDSCAPE ARCHITECT PRIOR TO INSTALLATION. C. 5ODMN6 1. SOD AVAILABLE A5'JB-5I0NATURE'A5 MANUFACTURED 5Y.JB INSTANT LAWN (500-527-145cf). 2. INSTALL AOCORVINO TO MANUFACTURER'5 5FECIFICAT11ON5. 3. CONTRACTOR RESPONSIBLE FOR MAINTAINING LAWN THROUGH ACCEPTANCE. 4. RE-50D ANY AREAS AS NECESSARY TO ACHIEVE FULL HEALTHY TURF. IRR16ATION 5Y5TF-M PF-5(:,R1f=T10N 1. AUTOMATIC IRRIGATION SYSTEM WILL BE PROVIDED FOR ALL LAWN AND PLANT BED AREAS. 2. SYSTEM WILL BE AN UNDERGROUND IRRIGATION SYSTEM. 5. SYSTEM WILL PROVIDE HEAD TO HEAD COVERAGE, 4. SYSTEM WILL PROVIDE SEPARATE ZONES FOR LAWN AND SHRUB AREAS, 5. SYSTEM WILL PROVIDE SEPARATE ZONES FOR DIFFERENT SOLAR ORIENTATIONS. 6. HEAD LAYOUT WILL MINIMIZE O\/ER5PRAY ONTO PAVED SURFACES. 7. MAIN LINE WILL HAVE MANUAL DRAIN VALVES. 5. SYSTEM WILL BE OPERATED AUTOMATICALLY. q. SYSTEM TO BE DE51614 BUILD BY LANDSCAPE CONTRACTOR. NT5 LMC-vMNV 0 FROF05F-p PECIIPLIOU15 TREES FROF05F-D CONIFER TRF-F-5 5OD LAM SHRUBS ROUNDCOVER R.-A55F-5 S T&� 2711 David J. Dougherty &-4 OREGON 4pp FF-RN5 �] N%�� I I 0 2 5 10 20 SCALE: 1" = 1 -011 R ifi WIN C: 00 ry C 3: 0 C: co a) 6-0 M P, Co z cy) J) (0 ICU (.C) (1) cy) CL LL LMMJ 4- J� Vj At� Ad -Adwp 900pr ■ Vj moo 00 qql- Date: 4/14/12 Drawn By: EP Checked By: Submission: FF-RN5 �] N%�� I I 0 2 5 10 20 SCALE: 1" = 1 -011 R ifi WIN