•� PRE13-00024 - Development Issues Meeting for Proposed Gateway Mall Redevelopment
3000 Gateway Street(Map 17-03-22-00, TL 2109, 2200, 2218, 2219, 2300, 2305 and 2307)
Q.1 Will the City require or recommend modifications to the existing or proposed pedestrian,
bicycle or vehicle access and circulation routes?
A: Planning is of the view that comprehensive site access and circulation changes will be needed for
the Mall site. The modifications are needed for the proposed site redevelopment in addition to
resolving various transportation-related issues that have not been satisfactorily addressed with
previous land use applications.
Transportation to comment.
Q.2 How does the City recommend reconciling the proposed redevelopment project with the
existing Gateway Mall Development Agreement?
A: Staff recommends the developer submit a written request to have certain sections that are obsolete
or no longer applicable removed from the 1988 Disposition & Development Agreement, as
amended. CMO to comment.
Q.3 In the context of the Site Plan Review Modification, please provide feedback on the available
options for phasing construction of the proposed redevelopment and how that phasing needs
to be represented with the Site Plan Review Modification application. Feedback from City staff
on requirements for building elevations (SDC 5.17-120.A.9) for future phases would be
appreciated.
A: Staff recommends showing all currently proposed changes to the Mall property with the initial Site
Plan Modification application. The land use approval — once granted — allows up to 2 years for the
construction to be completed with provision for a one-year extension. If there are aspects of the
redevelopment project that are initially approved but not completed within 2-3 years, the owner
could submit a Minor Site Plan Modification application to renew the timeline on the incomplete
elements. Each successive Minor Modification is a Type I process, which is less costly than the
initial submittal and also doesn't require public notification.
Staff is curious about any possible architectural themes or common elements that will be
incorporated into the redevelopment project. For the Major Site Plan Modification the applicant
shall provide information and details for the affected building elevations, including the principal mall
building and outlying pads. If there are no immediate plans to construct a certain satellite pad
building, an outline of the building footprint and anticipated floor area can be shown on the modified
site plan. At such time as the site is ready to develop the building elevations can be submitted with
a Minor Site Plan Modification application.
Q.4 Please verify that the City has determined that the [existing] off street parking, bicycle parking
and accessible parking for the mall currently complies with current SDC requirements. Please
also verify that the number of existing parking spaces can be reduced proportional to the
decrease in overall building area and provide guidance on what level of parking
analysis/assessment will be required to support the redevelopment project.
A: Staff advises that a parking analysis was completed for the mall property in 2007. At the time, the
total calculated floor area for the Mall was determined to be 817,000 ft2 and there were 3,483
parking spaces on the site. This includes the outlying restaurant and financial services buildings,
Big 5 Sporting Goods store, and former Circuit City building (now Wal-mart Neighborhood Market
store) and their adjoining parking areas. It does not appear there was a differentiation between
standard, compact, handicap accessible and other parking spaces in the overall parking count.
Staff observes that with the recent Cabela's development on the west side of the mall there has
Date Received: 9 2-VdDi3
Planner: AL
been a net increase in the•
number of parking spaces on th•ite, including compact, handicap
accessible, and oversize (RV) spaces.
The provision of handicap accessible parking spaces is based on the nature of the building
occupancy and prevailing ADA requirements, and will need to be examined for each lease space
within the reconfigured mall building.
For the purpose of this project, staff recommends providing an "existing conditions" count of the
parking spaces on the site including a breakdown of the parking space "type" (eg. handicap
accessible, compact, standard, RV, etc.). If the applicant is proposing a change in the number of
parking spaces, a narrative describing the proportional relationship between parking space
provision and reconfigured overall floor area of the Mall will be needed. The applicant should
demonstrate compliance with the City's Development Code parking space requirements for
shopping centers. Staff will also be looking at parking space distribution and availability within the
site, particularly in the anticipated "high demand" areas proposed on the perimeter of the Mall site.
Additionally, if both the leasable floor area and overall parking space count is being reduced, the
applicant should describe where and for what purpose the "lost space" is being reallocated.
Q.5 Please provide suggestions and recommendations for expediting the site plan review
modification and building permit review process.
A: A pre-submittal meeting will be required for the Major Site Plan Modification application. This
meeting is typically scheduled within 5-7 business days of its receipt. Following this meeting, the
applicant can address the completeness items noted for the application and re-submit at their
earliest convenience. Right now, the typical timeline for processing a Type II Major Site Plan
Modification is approximately 40-50 days, depending on how many competing applications are in
the queue.
The applicant could request an expedited review of the Major Modification application, but this
would come at significantly higher cost: application fees are approximately 3X higher for expedited
review. There are certain minimum timelines that the City must meet for public notification and
preparing a decision. With a 14-day public notification window and the need for staff and agency
review, the timeline could be potentially compressed down to 3-4 business weeks with an expedited
review.
•
Either of these approaches provide a land use decision — typically with conditions — within a
compressed or standard timeframe. Ultimately, it will be the responsibility of the applicant and their
project team to satisfactorily address any conditions of the land use approval, submit a Final Site
Plan, execute a Development Agreement, and obtain various City permits such as Building Permits
for the work. Responsiveness on the part of the applicant and their team can reduce turnaround
and plan review time in order to streamline the approval process, with or without a request for
expedited review.
Heads Up Issues:
• Lane Transit District will have an interest in how the area surrounding the transit platform is to be
redeveloped.
• The applicant is under no obligation to provide the names of prospective tenants for the lease spaces
within the reconfigured mall site.
• The I-5 channel provides a stormwater management function for much of the Mall site. This drainage •
feature is a mitigated wetland that has been poorly maintained in the past. The City would like to re-
engage the Mall ownership group on the need to establish an ongoing maintenance schedule for this
channel.