HomeMy WebLinkAboutPermit Building 2013-10-1 SPRINGFIELD - 225 Fifth St
Ihr
' ( CITY OF SPRINGFIELD Springfield,OR 97477 as
`tOaEGON Phone: 541-726-3753
Building / Residential Permit Inspection Phone: 541-726-3769 •
Fax: 541-726-3676 •
PERMIT NO: 811-SPR2013-02195
www.springfield-or.gov permitcenterespringfield-or.gov
PROJECT STATUS: Issued ISSUED: 10101/2013 EXPIRES: 03/30/2014
STATUS DATE: 10/01/2013 APPLIED: 10/01/2013
SITE ADDRESS: 1858 14TH ST,Springfield,OR 97477 SCOPE: Fire Damage •
ASSESOR'S PARCEL NO: 1703252301708 TYPE OF STRUCTURE: Residential
•
PROJECT DESCRIPTION: Fire repairs
OWNER: LANCASTER THOMAS R 8 A M Phone Number:
ADDRESS: 100E 11TH STE C
EUGENE OR 97401
CONTRACTOR INFORMATION
Contractor Type Contractor Name Lic Type Lic No Lic Exp Phone
General Contractor EHLERS CONSTRUCTION INC CCB 4231 11/19/2014 541-689-6177
L INSPECTIONS REQUIRED
Inspections
1260 Framing Framing Inspection: Prior to cover and after all rough in inspections have been
approved.
1420 Insulation Vapor Barrier
1430 Insulation Wall Wall Insulation: Prior to cover.
1440 Insulation Ceiling Ceiling Insulation: Prior to cover.
1540 Gypsum Board/Lath/Drywall Drywall: Prior to taping. Lath/Plaster: To be made after all lathing and gypsum
board, interior and exterior are in place, but prior to plastering.
1999 Final Building Final Building: After all required inspections have been requested and approved and
the building is complete.
By signature, I state and agree, that I have carefully examined the completed application and do hereby certify that all
information hereon is true and correct, and I further certify that any and all work performed shall be done in accordance with the
Ordinances of the City of Springfield and the Laws of the State or Oregon pertaining to the work described herein, and that NO
OCCUPANCY will be made of any structure without permission of the Community Services Division, Building Safety. I further
certify that only contractors and employees who are in compliance with ORS 701.005 will be used on this project. I further agree
to ensure that all required inspections are requested at the proper time,that each address is readable from the street, that the
permit card is located at the front of the property, and the approved set of plans will remain on the site at all times during
construction.
6:121--d... tiCi - 14° i ( 3
Owner or Contractor Signature Date
ATTENTION: Oregon law requires yoU to
follow rules adopted by the Oregon Utility
Notification Center. Those rules are set forth
NOTICE: in OAR 952-001-0010 through OAR 952-001-
0090. You may obtain copies of the rules by
THIS PERMIT
UNDER HIS PERMIT IS NOT calling the center. (Note: the telephone
RUTH number for the Oregon Utility Notification
Springfield Bnildin�Uivl'iJIENCED OR IS ABANDONED FOR 10/1/2013 9'55:23AM Center is 1-800-332-P29e 4)of 1
ANY 180 DAY PERIOD.
• — ,
SPRINGFIELD CITY OF SPRINGFIELD)
225 Fifth St
TRANSACTION RECEIPT Springfield OR 97477
OREGON 541-726-3753
811-SPR2013-02195
www springfield-or gov 1858 14TH ST perrnitcenter@springfield-or gov
RECEIPT NO: 2013002179 RECORD NO: 811-SPR2013-02195 DATE: 10/01/2013
:DESCRIPTION -: k. -, :' ' + . - -C.1 v ''...,...: ::4L1:,..„,,,.A C C OU N T t 0 DEJTRA NS,,CODE , ..., AMOUNT DUE z
State of Oregon Surcharge(12%of applicable fees) 821-00000-215004 1099 56.74
Structural Building Permit Fee 224-00000-425602 1002 472.82
Technology fee(5%of permit total) 100-00000-425605 2099 23.64
TOTAL DUE: 553.20
PAYMENT TYPE PAYOR CASHIER:CCARPENTER S. :' ' COMMENTS : ' - ,. AMOUNT PAID
Check EHLERS CONSTRUCTION INC 553.20
1902
TOTAL PAID: 553.20
Structural Permit Application DEPARTMENTUSE`ONLY E
•
•
•
CITY OF SPRINGFIELD, OREGON permit no S!`�� /9�
225 Fifth Street•Springfield,OR 97477•PH(541)726-3753•FAX(541)726-3689 OREGON /J G(
Date/077A,3
This permit is issued under OAR 918-460-0030.Permits expire if work is not started within 180 days of iss e or if work is
suspended for 180 days.
s, sr LOCAL;GOVERNMENTr,AP„p,ROVA`L "` i"- v"_ ' '� Fly �f "a' 4`"
:-._ ,v,�..-.... .r , ��_ .._...�. ::1_ .�.....:��tjam.�._-ci"�EEE SCHEDULE t,;`.*..�� tl_,r=`..`s
This project has final land-use approval. .1'iA91uatt9u mf9t799 1 t, _,L, x,
Signature: Date: (a)Job description: �/��r/et 7" /er_c
This project has DEQ approval. ,� ?
Occupancy e J
Signature: Date: V45.-Zoning approval verified: ❑Yes ❑No Construction type:
Property is within flood plain: ❑Yes ❑No Square feet:
'i= a r.�„a�. „CATEGORY OF.aCONSTRUCTIQNt,M.iL�'tg g Cost per square foot:
I •Residential ❑Government ❑Commercial Other information:
=�„a" .`�'„j ;IOB�SITE,INFORM.4TION`ANDi LOCATION"s `,''.: ,w Type of Heat:
c
Job site address: I ic 5 7 I 4- Energy Path: _
City: Ft_A State: 0 ZIP: Cj'7 y-77 ❑new eration ❑addition
Subdivision: Lot no: (b)Foundation only permit? C.:Yes ❑No
Reference�70 3 15725 Taxlot: C-7-1 1 0 a Total valuation: $4,2
_ ,.. r ,,. iF{z io"`s?s",.'P,ROPERTY}OWNER $?fe ,�".:'af .s;w ;2.Building fees aS `".``_5t`n;5,r,,., a . fife tj$”. +r
Name: "'fid DM- S LA hi c1/45-re--- (a)Permit fee(use valuation table): $ L 7
Address: /00 c 117 (b)Investigative fee(equal to[2a]):
City:,2x 4_ C,C ! State ZIP: dj� (c)Reinspection($ per hour):
Phone: 2 ` 0 64 I> Fax: - - (number of hours x fee per hour)
-E-mail: (d)Enter 12%surcharge(.12 x[2a+2b+2c]): $ ‘f&7Y
(e)Subtotal of fees above(2a through 2d): $
Building Owner or Owner's agent authorizing this application: t`3 Pian rev e v fees "¢.;s+rr l " .i_" ,;•` a iv, .;S! s . i
(a)Plan review(65%x permit fee[2a]): $
Sign here: p�s� ` �'°"�� (b)Fire and life safety(40%x permit fee[2a]): $
❑This installation is being made on residential or farm property owned by (c)Subtotal of fees above(3a and 3b): $
me or a member of my immediate family,and is exempt from licensing
requirements under ORS 701.010.
(a)Seismic fee, 1%(.01 x permit fee[2a1): $
„ brit CONTk,4CTORr WSTALLATI,ON-]„ a,INIP„„`EIfI,,,N 64'
(b)Technology fee,5%(.05 x permit fee[2a]): $ Z i
Business name: .c_l-tlfyp-J 1-00-3ST le)G • zf-'5
TOTAL fees and surcharges(2e+3c+4a+4b): $
Address: [ 5 *Atka 6—a—A ST
City: &-J& .zE-. State: 0,e_ ZIP: el yYo2
Phone:6+)- 6459 et-7 7 Fax:5+'/- (4'7 Si 5 5
E-mail: ey&YE4.e2. ENtl;1t 5 teJG tJk:_T •
CCB license no.: 1.t-2_ i .,n
Print name: t_.'e ( ' L036‘._.
& •
Signature: 1/' ! / _�
gtoo.01MaciS.U13. NTERAPTPRINEORmATIP.Cati101ittl
Name CCB License# Phone Number
Electrical
P-VSS R-oaWS-
Plumbing
25 Pwtte,;'J(�
Mechanical
•
MCP ENGINEERING, PC
4222 COMMERCE STREET, SUITE 2J
EUGENE, OREGON 97402
(54 1) 393-0782
FAX (541) 393-0783
kevin @kpengineering.biz
September 30, 2013
Ehlers Construction
1085 Madera Street
Eugene,OR 97402
Attention: Max Hansen
Re: Fire Damage Inspection at 1858 N 14111 Street. Springfield. Oregon - Job #kp13067
As you requested, an inspection was performed on September 25, 2013; at the multi-family
residence located at 1858 N 14th Street in Springfield. The purpose of the inspection was to
examine damage caused by a fire in the east upstairs bedroom of the duplex. The fire occurred
in the north unit of the duplex. The existing two-story wood framed-structure has 2x4 at 16" on
center exterior walls with T-1-11 sheathing/siding. The roof system is 2x6 rafters at 24"on
center with !!"plywood roof sheathing, felt, and asphalt shingles. The ceiling is 2x6 joists at
16" on center. The upper level floor system is 2x8 floor joists at 16" on center with 3/4"plywood
decking. The wall and ceiling finishes are gypsum wallboard. See pictures 1-6 on sheets 3 thru
5 of this report to view the general vicinity and extent of damage done by the fire in the upstairs
bedroom.
At the time of the inspection performed on September 25, 2013 the following observations were
made. Prior to the inspection the gypsum wail and ceiling finishes had been removed along with
the wall and attic insulation at the entire upper level of the north unit. At the upper level, the
units are separated by two parallel walls framed with 2x4 studs at 16" on center. The studs of
—
each wall are offset and there is a layer of W' fides sound board the fills the gap between the two
walls. The wall cavities are also insulated. The roof, ceiling, and upper level floor faming is
perpendicular to the interior separation wall between the two halves of the duplex. The gypsum
wallboard had also been removed from the walls and ceiling of the garage, which is located
below the east bedroom and the upper level bathroom.
The main area of damage from the fire occurred in the east upper level bedroom. The fire
charred and burnt a hole in the upper level floor decking in the east bedroom (Pictures 3 and 6).
The fire also charred at least two of the 2x6 rafters above the closet of the east bedroom(Picture
4). The upper level roof sheathing has been charred in several locations (Picture 4). The T-1-11
sheathing/siding around the window in the east exterior wall has been burnt (Picture 2). A
portion of the damaged T-1-11 sheathing/siding on the east gable end above the window had
been removed prior to the inspection(Pictures 2 and 5). A few of the flat 2x4's of the attic gable
end were burnt by the fire. The roof sheathing and barge rafter at the east gable overhang were
damaged as well (Pictures 2 and 5). The window in the east exterior wall of the east bedroom
had been completely removed, and the glass was broken out of the window frame in the west
exterior wall of the west bedroom.
The following repairs should be made to the structure. Remove and replace all charred framing
members to match existing. Remove and replace the two burnt 2x6 rafters. Attach each new
rafter to the existing exterior wall top plates with a Simpson HI hurricane tie, and to the existing
2x8 ridge board with a LSU26 slopeable hanger. Remove all damaged roof sheathing and
replace it with new 1" APA rated plywood roof sheathing attached to all framing members with
8d nails at 6" on center edge and 12" on center field. Remove and replace the burnt 2x6 barge •
rafters at the east end of the upper roof. Remove and replace the charred flat 2x4 framing of the
east gable end to match existing construction. Remove and replace all burnt T-1-11 exterior
sheathing/siding. Attach the new APA rated T-1-I I exterior sheathing/siding to the existing wall
and gable end framing with 8d nails at 6" on center edge and 12"on center field. Remove and
replace the damaged portions of the floor decking in the east bedroom. Install new 3/a" APA span
rated plywood floor decking with 8d common or deformed nails at 6"on center edge and 12" on
center field. At the separation wall, install new insulation to match existing and 5/8" Type-X
gypsum wallboard with a minimum of 6d coated nails (I 7/8" long, 0.0915" shank, ''A"head) at
7" on center into all framing members. At the ceiling of the upper level and the garage install
5/8" Type-X gypsum wallboard perpendicular to the ceiling framing and attach with 6d coated
nails (1 7/8" long minimum) or the equivalent drywall screws at 6" on center into all framing
members. Replace the two damaged windows with new windows that comply with second floor
egress requirements (ORSC R3I0.1), and have a U-rating of 0.35. Install new R-15 high density
batt insulation in all exposed upper level 2x4 exterior wall cavities, new R-38 blown-in or batt
insulation in the exposed attic space, and 6"of new rigid insulation equivalent to R-30 in the
exposed floor-ceiling framing between the garage and upper level. Replace all other damaged or
removed gypsum wallboard to match existing construction. All repairs to the structure are to he
in compliance with the 2011 Oregon Residential Specialty Code and 2010 Oregon Energy •
Efficiency Specialty Code as adopted by the City of Springfield.
I hope this report is adequate for your purposes at this time. Damage not noted above that is
discovered during the cleaning, exposing,and repair of the structure should be brought to the
attention of KP Engineering, PC. Thank you for this opportunity to be of service. If you have
any further questions please do not hesitate to contact me at (541)393-0782.
Very truly yours, —
0.cn PROF_
��
F.�GINEF S')�
61631
elf
sib
—a
GREG N
\L;` 14, t9g9 °z/
�M. PE-C°P-
EXPIRES: 12-31- G�
Kevin M. Peterson,PE
2
KP ENGINEERING, PC
4222 COMMERCE STREET, SUITE 2J
EUGENE, OREGON 97402
(541) 393-0782
Fax (541) 393-0783
kevin @kpengineering.biz
Job #kp13067
Fire Damage Inspection at 1858 N 14th Street, Springfield, Oregon
Y--1.:„-4.
-� ry < t 1 3 1
> �+ t , a? >.- fir'. .E > Fa
Y Sew+, u' `. tY{k ' 7i ', `ri '�
Y, (+(;�`Wtg4fi � �, ^4-^
'b,r 4 1 --t PAM.
cam ( + 3I � -
r. .+
-u're'a, $# - xs Cal ,14:44,#).:147:11
.
Picture 1: This is a picture of the east elevation of the duplex at 1856/1858 N 14th Street. The
fire occurred in the north unit of the duplex (1858). Some of the T-1-1 1 exterior
sheathing/siding had been removed from the gable end of the attic prior to the inspection.
MCme.it , ,a1 7 ' y'� ""�1ay "' ..
Vitk ,� N.of 14' y 4, ?, e "'Ti5 >, ffi.
i iN 4. a #
s -
Y y
ka- `Y
ufir rt t•7' S 4 y� - t +0;+ 3 � r
i = f. i F mtibY F}" S
tome, ' `vim` ; "` A.,.. ..„ 1-1150%- r s
Picture 2: This is a picture showing the charred T-1-1 1 exterior sheathing/siding at the wall and
gable end framing. The roof sheathing for the overhang has been completely destroyed in
several areas, and the 2x6 barge rafters have been significantly burnt.
•
3
MCP ENGINEERING, PC
4222 COMMERCE STREET, SUITE 2J
EUGENE, OREGON 97402
(541) 393-0782
FAX (541) 393-0783
kevin @kpengineering.biz
Job #kp13067
Fire Damage Inspection at 1858 N 14th Street, Springfield, Oregon
s
yJ 4, ,
', �(j W 5 # P F1dv
�'
l
x
n �
t zq
-
Picture 3: This is a picture looking east down the hallway leading into the east bedroom where
the majority of the damage occurred. The exterior window had been removed, and there was a
hole burnt thru the charred plywood floor decking (See Picture 6).
v '.-; +',s as ri
r - k max ' t�e�
z
_y.
_ •_%r - )
Y�_�_'. .a:H.t vb
r r '
-
-u h ,may IC rite .
t.'��it
Picture 4: This is a picture of two 2x6 rafters above the closet for the east bedroom that were
burnt by the fire. The top of the 2x6 ceiling joist(visible at the bottom of the picture) and the
plywood roof sheathing were also charred by the fire.
4
KP ENGINEERING, PC
4222 COMMERCE STREET, SUITE 2J
EUGENE, OREGON 97402
(541) 393-0782
FAX (541) 393-0783
kevin @kpengineering.hiz
Job#kpI3067
Fire Damage Inspection at 1858 N 14`h Street, Springfield, Oregon
MY$
yY
11e 1 1
Picture 5: This is a picture looking out the east g able end of the attic space. The overhang roof
sheathing and barge ratters were extensively damaged, along with the T-1-l1 exterior
sheathing/siding that can still be seen attached to a few of the 2x4 gable end framing members.
^o 4 .!'a (-140 Vci� g , 4 4 f 8
t c
t , Ie
2 iEt .`_ ,••F4c £ y.f xtd.{e... f
S
T'Ss?r �
Picture 6: This is a picture of the 2x8 at 16"on center floor framing above the garage. A hole
was burnt completely thru the %" plywood floor decking of the east bedroom. The floor joist
and blocking were blackened, but no significantly charring was visible.
5