Loading...
HomeMy WebLinkAboutMiscellaneous Correspondence 2013-8-5 ��a�)7o Information 1L[ To Build On Engineering•Consulting•noting August 5, 2013 Mr. Eric Evenson Wal-Mart Stores, Inc. Sam M. Walton Development Complex 2001 SE 10th Street Bentonville, Arkansas 72716-8085 ,s�� 2.9( �Z �� l Z' Re: Store #4178-00 (Springfield, OR) 73o PSI Project No.: 0654137 f vat SAee;qe �Q{daps—t Dear Mr. Evenson: The purpose of this letter is to state to Wal-Mart, the Architect of Record and the Engineer of Record that, to the best of our knowledge, the construction on the above referenced project has been completed in substantial conformance with the approved Contract Documents and with the provisions of the applicable building code. In the capacity of the owner's testing and inspection agency, periodic reports as well as a final report have been issued. Those reports state that the on- site inspection and testing has been performed. Work requiring inspection was, to the best of the inspector's knowledge, in conformance with the approved plans, specifications, and applicable workmanship provision of the code. To our knowledge no outstanding items exist as otherwise may be entered and shown on the Wal- Mart Observation Log. Sincerely, PSI (Professional Service Industries, Inc.) r:pg-O PRQP' . ` 366GfPE Deborah Pr st, PE — Project Engineer r m OREGON cc: BCRA, Inc. `0 0 '9Y g yo 2c� Ry ANNE Q Professional Service Industries,Inc.•6032 North Cutter Circle.Suite 480•Portland,OR 97217•Phone 5032691778•Fax 5032891918