HomeMy WebLinkAboutPermit Mechanical 1988-9-13
.. RESIDENTIAl--
APPLl TON/PERMIT
225 North 5th Street
Springfield, Oregon 97477
Building Division
,726-3753 ") ZL'( -7 ,f C(
I L/'/::2.c;;- Cff...-? c=~~ /' /fL 5r
I Asaesaors Map # I )-tC>~-5'<-3 3
.;.~. ....
&'7'pc-c:./ /&># c?P P-c..-::?G ~ '
pc/c/~;/,#"e= 0-'7P/7F.....k-' e>e
~gT~~ 7' ~~~C~-O C?V~~
011
a:D
,~
Job Location:
Subdivision:
CA.mer: ~CH? lf~~
Address: ~r/O S::== 7'"77!Z 5r-
City: ;)~b. ~'?
/'
N"",
Additien
Remodel
.'!obi le Home
Date of Applicatien
~-&-8-8
S..R. d
vJ ~ :z;gr.e :
rq:P l ~@;;
Lisc.#
T= Lot # ~9/o 2.
Phone: 7 2b-~8Y
Zip: 97 '7:/t!!?
Describe f~'orJ.:.:
Value
AcUL~ess
.f?cce::Jt(;J /2 Z '/ 9-
, \ II
~/?'
EroirCJs
Fhon[;
Conr:racr:ol's
General
Pl.wnbing
Electrical
Mechar.ic.::.l
Construction Lender
It is the responaibility of the permit hoLdeI' to see that all inapections are made at the proper time, that e=ch ~es3 is re~~
from the street, and that the perrrrit card is located at the frent of the property.
*BuiZding Divicio'!"'. approved plan shall l'emain on th6 Bu-:.lding Sits at all times.
PROCEDURE FOR INSPECTION RSQUEST:CALL 726-3769 (recorder) state YOUI' City designated job mo:-:ber, job aC.C:rocss, type of ir.:;pec~ic>:
requested ar.d when you ",ill be ready for inspcction, Contracters or CA.mers ncme and phone number. Reques"s received cejcre 7:00 ~
",iZZ be made the same dey, requests mc:de efta 7:00 <271 will b", made the n:;:rt :.>ark";,...; d::.,;.
:;j
)1
Reaui~"d InsD"cticn~
O SITS INSPSCTION: To be made after
excavation, but prier to set up of
forms.
0, UNDERSLAB PLUMBING. ELECTRIC,1L &
/.fECHA:JICAL: To be made before any
worK is ~overed.
[]
:.:'.1
')
:::J
~
'\ ~
,"I ~
o:'l
,
:
i
'[
CJ
FOOTING !i FOUNDATION: To be made
after trenches are excavated and
forms are erected, but prior to
pouring ccncret~.
UND'ERGROUND PLUMBING. SSflER. W.1TER.
DRAINAGE: To be made prior to fil-
l.ir.g trenches.
u
WlDERFWOR PLU/.$ING & MECHANICAL:
To be made prier to installation of
j100r insulation or decking.
POST AND BEAM: To be made prior to
installatien of floor ins~lation or
decking.
ROUGH PLUMBI!JG, ELECTRICAL & MECH-
ANICAL: No ~Jork is to be cOl.:ered
until these inspections have been
made and approve~.
FIREPLACE: Prior to placir.g fecing
materials and before framing inspec-
tion.
FRA!1ING: Must be requeated after
approval of rough plumbing, electri-
cal & mechanical. An roofing
bracing & chimneys, et~. nr~st be
,corrroleted. No work is to be con-
, cee'led until this inspection has
'been made and approved.
~
~
~
~
Your City Deaigr~ted Job Number Ia:
D
INSULATION/VAPOR BARRISR INSPECTION:
To be made after all insul~tion ~4
required vapor ba:rriers are in place
but before any lath, ,gypsum beard or
wall covering is applied, and before
any insulation is co~cealed.
CZ5g6 79~
"DEliOLITIOH OR ;~:OVE:'; BUILDIj,'(JS
~ Sani tary se'.Jer capped =t p~oPC!'t':i Ur.e
~ Septic tank ~~~ed and f-:.lled uith gra~
---, Final - mIen above ite.'7ls are ccmpleted
~ and when demclition is complete or sty~
ture moved and premises cleaned up.
Mobile Hcmes
=:J Blocking and Set-~p
=:J Plumbir.g connections sewer ar4 water
~ Electric~~,Ccnnectio~ - Blockir.g, set-v
--.J and plumD'Lng connectwns nr~st !:e app!'Ol.'
beforc request-:.ng electrical ins;:>ectio::
:==J Ac~essor~ Building
---, Final - After porcr.es, sk-:.rting, decks,
~ etc. are comple=ed.
D
FINAL PLUMBING
All project conditions, ouch as the installation of street trees, completion of the
required landscaping, etc., must be satisfied bcfore the BUILDING FINAL can be rzquesr:cd.
FIliAL MECHANICAL
o
PINAL BUILDING: The Final Building Inspection must be requeated after the Final Pl~bir~
Electri~al, and Mechar.ical Inspectiona have been made and approv2d.
FINAL ELECTRICAL
D
DRYWALL INSPECTION: Te be made
after all d:l'ywall is in place,
but prior to eny taping.
"ALL f.1ANHCLES ,AND CLEANOUTS .'lUST BE ACCESSIBLE, ADJUST!!:::!'!' TO BE g1VE !.T !lO C'::'5T TO CI':'Y Pa.::e 1 of
D MASONRY: S:~el
beams, grOU~'Lng
accordance with
241S.
location, bond
or verticals in
U.B.C. Section
D
WOOD5TOVE: After installation is
ccmpleted.
D
CURB & APPROACH APRON: Afte:o forms
are erected but prior to pouring
concrete.
I I
SIDEWALK & DRIl'Ef-lAY: For all con-
crete paving within street right-
of-way, to be made after all exca-
vating complete & fOr:-:! work & sub-
base material in place.
D ~ENCE: k~en compl6te -- Provide
gates or movable sections through
P.U.E.
o
"', ..,..r"~:;,..~~',' 7"';',"'('
,~". '. .... ".-;:,. ,-' .'
.:~. ....\;.'.: . .",
Rece:.pt !!
J ,~ ':5~b
"~
.. RESIDENTIAL'.
jPERMIT
Describe 'ioUrk: .
- ~
, t1/ {UJ trY'"L-,... - L-
c;2u ht/M-L ~,
~[,~~. .
9--(.3 ~~~., Value ~IV
~-
APPLICA~
225 North 5th Street
SpringfieZd~ Oregon 97477
BuiZding Division
726-3753
,\
Job Location:
fwJitL-
Assessors Map #
Subdivision:
Owner:
...--... II
~{UVlA jL/
Awess:
City:
NA1~
Addition
Remodel
Nobile Home
Date of Application
Contl'actors
T= Lot #
Phone:
11
;;C!/rrtY~
Zip:
General
Plumbing
Electrical
Mechar.icd
/ AdcLness
;/ tJtUm~ ),
/5'1/~~-"b~
Construction Lender
)/vt (
0fP
Signed:
Date:
~'
?.... (3 -yy
Lisc.!!
Expires
Phone
It is the responsibility of the permit hoUier to see that all inspections are made at the proper time, that e~ch ~ess is rea~aD:e,
from the street, and that the permit card is located at the front of the property.
*Bui!ding Divicior. approved plan shell remain on the Building Site at all times,
PROCEDURE FOR INSPECTION REQUEST:CALL 726-3769 (recorder) state your City designated job nur;;ber, job adiroess, type of inspec-;icn
requested and when you will be ready for inspection, Contractors or Owners ncme and phone numbor. Requests received before 7:00 ~
:.'ill be made the same day, requests made after 7:00.am win be! made the next :Jorking day. ~.A /l~ '
Your City Desigr4ted Job Number Is: ~V
Reauiredlnsvectiens
0, SITE INSPECTION: To be made
excavation, but prier to set
forms.
0" UNDERSLAB PLUMBING, ELECTRIC,1L &
: NECHAZlICAL: To be made before any
work is covered.
after
up of
o
FOOTING & FOUNDATION: To be made
after trenches are excavated and
forms are erected, but prior to
pouring concrete.
CJ
UNDSRGROUND PLUMBING, SEWER, WATER,
DRAINAGE: To be made prior to fi 1-
liY'{J trenches.
[]
[]
UNDERFLOOR PLUMBING & MECHANICAL:
To be made prior to ,installation of
j100r insulation or aecking.
POST AND BEAM: To be made prior to
installation of floor insulation or
decking .
ROUGH PLUMBING. ELECTRICAL & MECH-
ANICAL: No :Jork is to be covered
until these inspections have beer:
made and approvec..
FIREPLACE: Prior to placiY'{J facing
materials and before framing inspec-
tion. '
FRAJ1ING: Must be requested after
approval of rough plumbing, electri-
cal & mechanical. AU roofing
bracing & chimneys, etc. ~~st be
, comp leted. No work is to be con-
., cealed until this inspectiqn has
'been made and approved.
C]
[J
~
~
~' FINAL PLUMBING
=:J FINAL t1E:JHANICAL
~ FINAL ELECTRICAL
~ '1~
D
INSULATION/VAPOR BARRIER INSPECTION:
To be made after all insuLation a~~
required vapor barriers are in place
but before any Lath, gypsum board or
wall aovering is applied, and before
any insulation is concealed.
DEI10LITIO.'.' OR ;,,;eVE BUILDIuCS
:==J Sanitary s~~er capped at p~operty line
~ Septic tank pu~ed and filled ~ith gra~el
I Final - ,"hen above iteJns are cernvleted
~ and when demelition is complete or strU~-
ture moved and premises cleaned up.
Mobile HemeE;
=:J Blocking
=:J Plumbing
~ Electrical Connection - Blocki~~, set-u;
~ and plumbing connections ~~st be apprOved
, before requesting electrical inspection
and Set-up
connections
sewer ar.d wa-;er
DRYWALL INSPECTION: Te be made
after all drywall is in place,
but prior to any taping.
O MASONRY: Steel location, bond
beams, grouting or verticals in
accordance with U.B.C. Section
W' 241/5.
WOODSTOVE: After installation is
cempleted. 3"')-.
o
D
CURB & APPROACH APRON: After forms.
are erected but prior to pouring
aoncrete.
==:]'Accessory Building
~ Final - After porches, skirting, decks,
~ etc. are completed.
o
All project conditions, such as the installation of street trees, co,"pletion of the
required landscaping, etc., must be satisfied before the BUILDING FINAL can be requested.
~
FINAL BUILDING: The Final Building Inspection must be requested after the Final Plumbir~
Electrical, and Mechanical Inspections have been made and approvec..
D
SIDE,iALK & DRIVEvIAY: For all con-
crete paving within street right-
of-way, to be made after all exca-
vating complete & fom UJOrk & sub-
base material in place.
,'. . ..~ .. ~l -,- ~_ . ......-: .." ~ . .....
*ALL MANHOLES AND CLEANOUTS !1UST' BE ACCESSIBLE, ADJUST!fENT TO BE lJ.~DE n NO (:}ST TO CITY Paf:e 1 of 2
D
FENCE: ~~en complete -- Provide
gates or movable sections through
P.U.E.
o
I JOB NO. 9")fOr;C?9 SOLAR ACr.E S S R EQ.-
I
1 Zone: Oeaupane1j Gr01.
Lot Sq. Ftg.
% .:;f lot C.:;verag~
# of Stories
Total Height
I Topography
I
I ITEM SQ. FTG
I Main
Garaae
CarDort
IAeee~sorl1
S.D.C.
TOTAL VALUE
Iva!,ue)
1.5 x
Building Permit
State Sureharge
Total Charges
lITEM
I
I Pixtures
lid'
IRes ent~al (1 bath)
I
I Sanitary Sewer
I ,olater
I
!
Plumbing Per>rr:it
State Sureharge
Tota'! Charoes
I ITEM NO.
i
I Res. Sa. fta.
IN~/Extend Cireuits
!Temporary Serviee
Eleatrieal Permit
State Suraharqe
Total Chm>qes
lITEM
I F'uX'n:we ETU'S
I Exhaust Hood
I Vent Pan
I
, Woodstove
I NO.
I
I
I .
II
I
Permi t Issuanee
Mechanieal Permit
State Sureharqe
Total Charaes
i -- ENCROACHMENT
!
ISe~~rit1.f Deposit
i Storage
I
I
i Maintenanae
i Permi t
Total Charqes
, CU1'baut
: Sidewalk
Fenae
Eleetrieal Label
Mobile Home
'TOTAL AMOUNT DUE:"
LOT TYPE I Lot Faees -
Interior I Setbaeks
I P. L. I House I Carage
Corner INorth I I
Panhandle lEast I I
Cul-de-sae ISouth I
IWest I
I '
INO. I
I I
I / l:) _ (1) J/)'tt?
I ( .. 7tJ' I
Ifs,7s-1*
I
I
I
I
I
I
I
x
Value
/0- rffD .1-" \
,751
I /S ..7S *
I
I
I
I
I
I I
I I<-t;, (J1O I ~~
I p 7s1
__I /5, 751 *
I CHARGE I
I I
I I
I I
FEE
CHARGE
FEE
FEE
d-~SD _~
I I r /1,1
LJ3 ~ Ipg I *
CHARCE I
I
I
I
I
7()\.?C(
L -CO G-1t
':"
Type/Const:
Be&ooms:
]1 Ener(1l1 Sources
Heat
~...
T411e
Access.
Water Heater
Range
Fireplace
Woodstove
I
I
I
I )
-- Fees
Building Value & Permit
This pernr~t is granted on the express condition that the sdid,construction
shall, in aZI respects, conform to the Ordinanee adopted by the City of
Springfield; including the Zoning Ordinance, regulating the construation
and use of buildings, and may be suspended or revoked at any time upon vio-
lation of any provisions of said Ordinances.
*
Plan Check Fee:
Date Paid:
IRecc;ipt #:
(Signed:
Plumbing
Perrrdt
No person shall construct, install, alter or change any new or existing
plumbing or drainage syste~ in whole or in part, unless sueh person is the
legal possessor of a valid plumber's lieense, except that a person may do
plumbing work to property which is owned, leased or operated by the appli-
cant.
Electrical
Perm it
Where State Law requires tr4t the electrical work be done by an Electrical
Contractor, the electrical portion of this permit shall not be valid until
the label has been signed by the Electrical ~ontraetor.
Mechanical Permit
,.'
Plan Examiner
Uate
I HAVE CAREFULLY EXA1'fINED t7w completed application for permit, and do
hereby certify that all information hereon is true and correct, and I
further certify that any ar.a all work performed shall be done in accor-
dance with the Ordinances of the City of Springfield, and the L~~s of the
* State of Oregon pertaining to the work described herein, and that NO OCCU-
PANCY will be made of any structure without permission of the Building Di-
vision. I further eertify that only contractors and e:nployees who are in
eompliance with ORS 70~.055 will be used on this project
--
,;f!_~c::? /;/ ~
Signed
?(iy(r<7
"