HomeMy WebLinkAboutPermit Plumbing 1986-12-3
,.-:i
.. RESIDE fl.AL..
APPLICATION /PERlJIT
225 North 5th'Street
SpringfieZd, Oregon 97477
BuiZding Division
726-3753
. i..:
SPRINGFIELD ..
1
~.
Job Location:
L(033 L$n1~'~
/ /] ()~ 3 / If C/ T= Lot #
[tJ 1 fJ1
ASGesGorz Map #
Suhdivis'ion:
Wner: /j~~
Address: l.f 0.3 S
~
~~
1c1' -~30-.
Ci ty :
N!?tJ
Addition
Remodel
!.1obi Ie Home
Date of Application
/2--]' f6;
~on1;rac-:;ors
Phon e :
Zip:
~~-
Value
AdQ..~es3
General
?lwnbing !#..h.I
f:Lectrica?
!,fechtrr.ica L
/J ,~
~//~~;
rI/. ,- /)..- / "
_n-w.4~ If~J~
Construction Lender
,,-
.c~e:ot ;;
Po -it /J9')C{ I
11
__0[10 ) ~ i ~(
~
JNY/
Sigr.ed:
tL
J L -' 3 - X'h
Date:
Lisc.#
E:::vir2S
Ft:or;;;
Tt is the responsibiLity of the permit holder to see that aU inGpections are made at the proper timE;, that each ;;;ddress is rea::ab:e
-'rom the street, and that the permit card is k>aated at the front of tr.e property.
'Eui?-di~.g rr;vicion appro-z.'ed plan shaZZ l'emain on thE Building Sit::: at aZZ times.
JI?OCEDUPE FO!? INSPECTION RE'QUEST:CALL 726-3769 (recorder) state your City designated job nw;;ber, job adi:ress, type of ir.:;pec::ien
'equesr;ed a~.ci when you tJiZ L be ready for inspection, Contractors 01' Owners rlCme and phone nwnbcr. Requests received before 7: OC .:;-::
:ill be made the same day, requests made after 7: 00 am will be made the n=t :.JOrking day.'
'eaui-yo",tJ Tn''''Jl?ction"
] SITE I!lSP~CTION: To be made after
excavation, but prior to set up of
forms.
] UlIDERSLAE PWl-!EING, ELECTRICAL &
11ECHA:JICAL: To be made before any
work is covered.
] FOOTING 8 FOUNDATION: To be made
after trenches are excavated and
forms are erected, but prior to
p,ouPing concret;;. ~
IhNDERG.o"!OUHD -:tfl.MBINC' SEWER, W,~TER.
J' ~HAINAG~: To be made prior to fiL-
'Ur.g r;renches.
]
UNDERFLOOR PLUl-13ING .& 'MECHANICAL:
To be made prior to instalLation of
floor insu~tion or decking.
POST AND BEAM: To be made prior to
instaLLation of floor ins~lation 01'
deckirzq.
ROUGH PLU!'BING. ELECTRICAL & MECH-
ANICAL: No work is to be covered
,ur.r;iL these inspectior.shave been
made and approved.
FIREPLACE: Prior to placir.g facing
materiaLs and before framing inspec-
tion.
FRA!~ING: Must be requested after
approvaL of rough pLumbing, electri-
cal & mecr.anical. An roofing
bracing d chimneys, et~. ~~st be
- completed. No work is to be con-
"ceaZed until thiG inspection has
'been_made and approved. .
]
]
J
]
-;0-
i FINAL PLU!-13IllG
] FIliAL UE::HANICAL
~ FINAL ELE,::JCAL
]
Your City Desigr.ated Job Number ,Is:
D
INSULATION/VAPOR BARRIER INSPE'CTION:
To be made after aU insuLation CC".d
required vapor barriers are in pLace
but before any lath, gypsum board or
wall covering is applied, and before
any insuLation is concealed.
~bO g') I
- ' DE!JOLITIO;~' OR ;~{OVE; EUILDI;;CS
=:J Sanitary- s~,,":i:r.?a.pRecl, ~,f.:~r.:'~,[J~~.~ line
. --..!+'........'.,:.- . '..
:==J Septi~ tank p~~ed and filled ,with 'gr~JeZ
~ Final - h~en above ite~s are co,~leted
~ and when demolition is complete or stru~-_
ture moved and premises cleaned up.
Nobi le Hemes
~ BLocking and Set-up
~ PLumbing connections s~er ar.d water
~ Electrical COnnection - Blocking, set-u?
~ and plumbing connections nr~st be approvec
before requesting 'eZectrical inspectio~
:==J AccessoI",/ Building
~ Final - J.ftcr porcr.es, skirting, decks,
~ etc. are compLeted.
D
All project conditions, suc~ as the installation of street trees, ca~letion of the
required landscaping, c{c" must be satisfied before the BUILDIlo'C FINAL can be requested.
o
FINAL BUILDING: The Final Building Inspection must be requested after the Final Plumbing
ElectricaL, and Mechar.ical Inspectionn have been made and approved.
D
DRYWALL INSPECTION: To be made
after aU i:rywaU is in place,
but prior to any taping.
~SON!?Y: Steel location, bond
beams, grouting or verticals in
accordance with U.B.C. Section
2415,
WOODSTOVE: After instatlation is
compLeted.
'ALL MAllHCLES AND CLEANOVTS lflJST BE ACCESSIBLE, ADJUST!!2!!'!' TO BE r.r1DE /'.T r:o C;JST TO CITY P:lf=e 1 of 2
o
D
D
CURB & APPROACH APRON: After' forms
are erected but prior to pouring
concrete.
SIDEf';ALK& DRIlTf-lAY: ForaH con-
crete paving within street right-
of-ux:.y, to be made after aZZ exca-
vating complete & form work & sub-
base material in place.
D
D
PENCE: h~en complc:te -- Provide
gates or movable sections through
P.U.E. '
D
JOB NO.~ <61 (
.Zone:
Lot Sq. Ftg.
~ of lot C.:nJerag;:
;; of Stories
Total Height
Topogrcr;hy
!'J'E!}
S~.FTC
Main
!Jc::ra=c
Ca~0'-:'~
Accessor:J
TOTAL- VALUE'
L - C 0 G-'I;:
OdCUDanC:J Gr~~~:
SOL A R A ("" -: S S R E Q_-
Be::..roo,-,:s:
Value j
I
I
I
I
I
I
1 *
j
J
I
CE.4RCE
LCTTYFE
Interior
Corner
Panhandle
Cu l-de-sac
x
S.D.C.
I val-uc)
1.5 :::
Building Permi t
State SUI'chxr~e
To-:cZ Cna::-ges
I7'E/.!
?i='t"'..a'es
3esidentiaZ :1 bath)
5C?':i t::r:J Seu~ep
;,ic.te'!'
PluI'!bing PeY"d. t
State SUI'cr.arge
T~+~1 cr.c.raes
- .~. -:::-.' 4
I ,.~.
7es.
So. ft::.
i~/E=tend Cir~~its
"em:Jarary Service
Electrical Permit
Sta.te SUI'charoe
Total Ci".a:r'r;es
.~-='IJ
"urr..:zce ETU' S
::::haust Hood
'ent Fan
'Qodsto;;e
Permit Issuanc2
Mec,....:zr:ic:::l Permit
State SUI'charoe
Tote! crn:rae:;
Ei/CROACHf.!E~'/'1'
c~--<ritu DZV03it
:;oraae
:inter.ancc
-:rr:n t
Tete. Z ChcT'ncs
LI'vco../t
~de'..J.:llk
;n~(!
:ectrical Label
,bi Ze Home
'~L A.NOU.~'7'
I
I
,'(,.
I/~. Po
/.(,f) I
Iff ~f)-I *
t..'O.
i..,::.-.:.L;!:"
:iD.
FE::;
CH)..RCE"
'I/. tv
Type/Cor.st:
Lot Faces -
I I En2rn:J So:a'ccs
I
I
T""..J,"::{?
P.L.
INorth
lEast
ISm.:th
livest
SetbaCKS
I House ,I Caraae
Scar;
I Access.
I
I
I
I
Water .lft?a~c!'
Hanc:G
I
I
I I
II
Firenlace
WGoa:;r;oce
F2es
Building Value & Permit
This pe~t is granted on the express condition that the said construction
shall, in all respects, conform to the Ordinance adopted by the City of
Springfield, including the Zoning Ordinance, regulating the ccnstI""wticn
and use of buildings, and may be suspended or revokec at ar.y time Up011 vic-
lation of any prQvisio11s of said Ordinances.
Plan Check Fee:
Date Paid:
IRec;:;ipt #:
/Signed:
Plumbing Permit
No person shall construct, install, al~er 01' change any ne~ cr c:::ictir.?
plumbing 01' drainage syste~ in ~hole 01' in part, ur:less such perser: is the
legal possessor of a valid plumber's license, e:::ce~t tr.at a pe~son ~a! GO
plumbing work to property which is oumed.,leased or operated by the c.;;pli-
cant.
. ~'\
\,
I
I
j
I
I
I
I
-'*
Electrical
Perm it
Where State Law requires tr.at the electrical work be done by an Electrical
Contractor, the electrical vortion of this permit shall not be vaLid u,:tiZ
the Zabel has been signed by the Electricaf Contractor.
fV\echanical Permit
I
I
I
,
l
I
I
I
l
I *
I
I
I
I
I
I
I
I
PZ-an Examiner
LJa~e
I HAVE CAREFULLY EXAl.fINED the completed application for permit, and do
hereby certify that all info~ation hereon is true and ccrrect, and I
further certify that any arn all work perfor.ned s;~ll be done in accor-
dance :.nth the Ordinances of the City of Springfield, and thc Lcr,,;s of the
State of Oregon pcrtaining to the work described herein, and tr.at NO OCCV-
PANCY will be made of any structU1'2 without permission of the Building Di-
vision. I further certify that only contractors m:d c~plcyees who are in
cO'!7pliance with CBS 701. ('.'5 !In,7- lw '_',~,~i ,m this project
fl~ df?
12-3"'~tc
Sigrled
Date