HomeMy WebLinkAboutMiscellaneous Field Test & Inspection Report 2013-6-12 (5) y information r--- - .To Build On Engineering•Consulting• Testing DAILY OBSERVATION REPORT OF SINGLE-PLY THERMOPLASTIC ROOFING Date: 6/12/13 PROJECT INFORMATION Client: Wal-Mart Stores, Inc. (Store#4178) Work Area:Various Areas Project Name: Roofing Project Manufacturer: Johns Manville 60 mil reinforced TPO Location: Springfield, OR Insulation Type: JM Energy 3 Isocyanurate PSI Report No.: 654137-122-22 Contractor: Central Oregon Roofing PSI Hours Worked: 10.0 Approximate Contractor Hours Worked: 10.0 SIGNATURES Sam Stoner Isaac Doug Roth, RRO PSI Quality Assurance Observer Roofing Contractor Reviewed By: Representative PSI Project Manager PROJECT STATUS AT-A-GLANCE Today's Performance Comment Construction today? IS] Yes ❑ No If No Construction, Inspection Done? ❑ Yes ❑ No Contractor performance issues? ❑Yes ® No Schedule/scope issues? ❑Yes ® No DAILY PRODUCTION Total Square Feet Completed To Date Previously Today's Total Square Total Square Roof Section Completed Square Feet Feet Feet in % Complete Square Feet Completed Completed Section Main Roof Area 39,049 0 39,049 39,049 100 39,049 39,049 100 Crew Size—4 Roofers—4 Sheet Metal Workers-0 • Page 1 of 4 PSI Project No: 654137 Date: 6-12-13 WEATHER CONDITIONS & EMERGENCY COVER ® Dry ❑ Sunny ® Cloudy ❑ Windy ❑ Rain ❑ Snow Temp Range (low-high) 43° to 65° F Emergency cover/protection on-site? ®Yes❑No Type of Protection-TPO & EPDM membrane MATERIALS CONTROL&STORAGE In original identified packaging? ®Yes❑ No Off ground or deck? ®Yes❑ No Covered and vented? ®Yes❑ No Roll goods stored on side? ®Yes ❑ No Adhesive storage temperature Unapproved, damaged, or wet maintained? (2)Yes❑ No material? If Yes, how disposed? El Yes E) No Comments:Very few materials remain on site. Stored material protection appears adequate. SUBSTRATE PREPARATION Night tie-in removed? ❑Yes® No Substrate clean and debris ® Yes❑ No removed? Substrate and penetrations ready? ®Yes❑ No Substrate tested for dryness? ® Yes❑ No Comments: Substrates that received new roofing components were made clean with Johns Manville membrane cleaner. COVER BOARD APPLICATION (1" ENERGY 3) Correct Number of fasteners & Rhino Additional fasteners at Plates? (12 in corners, 9 at perimeter, ❑ Yes❑ No perimeters and corners? ❑ Yes ❑ No 6 in the field) Fasteners checked by technician? ❑Yes❑ No Short insulation joints ❑ Yes❑ No staggered? New/Existing Insulation joints tight? ❑Yes❑ No All joints staggered between ❑ Yes ❑ No layers? Gaps filled with spray foam? ❑Yes❑ No Drainage crickets installed per ❑ Yes ❑ No plans and specifications? Comments: Cover board installation is complete. SINGLE-PLY MEMBRANE APPLICATION (60 MIL REINFORCED JOHNS MANVILLE TPO) Membrane allowed to relax prior to ❑Yes❑ No Membrane fully welded to Rhino ❑Yes ❑ No attachment? Plates? Membrane/plate welds checked by technician? ❑Yes❑ No Membrane properly lapped? ❑Yes ❑ No Seams clean prior to welding? ❑Yes❑ No Continuous weld achieved? ❑Yes ❑ No • Page 2 of 4 • PSI Project No: 654137 Date: 6-12-13 SINGLE-PLY MEMBRANE APPLICATION (60 MIL REINFORCED JOHNS MANVILLE TPO) (CONT'D) Membrane flow at lap welds? ❑Yes❑ No Seams probed by technician ❑ Yes❑ No Cut edge sealant installed? ❑Yes❑ No T-patches installed? ❑ Yes ❑ No Primary field membrane termination ❑Yes❑ No (T-bar)installed? Comments: TPO membrane installation is complete. BASE FLASHING APPLICATION (60 MIL REINFORCED JOHNS MANVILLE TPO) Substrate clean and prepared? ❑Yes❑ No Adhesive applied to substrate ❑ Yes ❑ No and allowed to dry? Adhesive applied to back of base flashing? ❑Yes❑ No Adhesive allowed to flash off? 1:1 Yes❑ No Flashing pressed onto substrate to ❑Yes❑ No Flashing properly lapped onto ❑ Yes❑ No promote adhesion? field membrane? Seams cleaned prior to welding? ❑Yes❑ No Membrane flow at welds? ❑ Yes❑ No Continuous weld achieved? ❑Yes❑ No Manufacturer's approved corner ❑ Yes❑ No patches installed? Seams probed by technician ❑Yes❑ No Cut edge sealant installed? ❑Yes❑ No Termination bars installed? ❑Yes❑ No Counterflashings installed? ❑Yes❑ No Comments: Membrane base flashing is complete. NIGHT TIE-IN! DAMAGE/SITE CLEANUP INSPECTION Night seal installed? ❑Yes ® No Roofing appears watertight? ®Yes❑ No Roof drain fleshings completed? 0 Yes❑ No Damage to property? ❑ Yes® No Damage to clients equipment? ❑Yes® No Site broom clean? ❑ Yes® No All debris removed from roof? ❑Yes No Roof materials and equipment ® Yes ❑ No appear secured? Comments: The roofing contractor has removed most of the roofing debris from the roof. Page 3 of 4 PSI Project No: 654137 Date: 6-12-13 DETAIL INSTALLATION (NOTE DRAWINGS USED AS REFERENCE) Detail# Detail Name Construction Summary(Quantity/Description/Comment) 10-A4.1 Pad Layout Walkway pads were installed per Detail Drawing around several RTU units. 3-A4.1 Penetration Ten pipe penetrations were flashed per Johns Manville Detail TF-51. SUMMARY OF TODAY'S WORK/ DEVIATIONS/SPECIAL NOTES: Summary Comments: Work completed today appeared to conform to project plans and specifications. Unresolved EVOCO Deviation Number(s): 0 Special Notes: Doug Roth, Professional Service Industries Registered Roof Observer, was on site today. Respectfully Submitted, PROFESSIONAL SERVICE INDUSTRIES, INC. PSI Roof Observer: Sam Stoner CC: Portland, OR—One copy electronically Reviewed By: Doug Roth, RRO • Page 4 of 4