DAILY OBSERVATION REPORT OF
SINGLE-PLY THERMOPLASTIC ROOFING
Date: 6/5/13
PROJECT INFORMATION
Client: Wal-Mart Stores, Inc. (Store#4178) . Work Area: Various Areas
Project Name: Roofing Project Manufacturer: Johns Manville 60 mil reinforced TPO
Location: Springfield, OR Insulation Type: JM Energy 3 Isocyanurate
PSI Report No.: 654137-102-17 Contractor: Central Oregon Roofing
PSI Hours Worked: 12.0 Approximate Contractor Hours Worked: 12.0
SIGNATURES
Sam Stoner Isaac Doug Roth, RRO
PSI Quality Assurance Observer Roofing Contractor Reviewed By:
Representative PSI Project Manager
PROJECT STATUS AT-A-GLANCE
Today's Performance Comment
Construction today? ® Yes ❑ No If No Construction, Inspection Done? ❑Yes ❑ No
Contractor performance issues? ❑Yes ® No
Schedule/scope issues? ❑Yes ® No
DAILY PRODUCTION
Total Square Feet Completed To Date
Previously Today's Total Square Total Square
Roof Section Completed Square Feet Feet Feet in % Complete
Square Feet Completed Completed Section
Main Roof Area 39,049 0 39,049 39,049 100
39,049 100
Crew Size—4 Roofers—4
Sheet Metal Workers—0
Page 1 of 4
PSI Project No:654137 Date: 6-5-13
WEATHER CONDITIONS & EMERGENCY COVER
® Dry ® Sunny ❑ Cloudy ® Windy ❑ Rain ❑ Snow Temp Range (low-high) 50°to 84° F
Emergency cover/protection on-site? ®Yes❑No Type of Protection-TPO & EPDM membrane
MATERIALS CONTROL & STORAGE
In original identified packaging? ®Yes❑ No Off ground or deck? ® Yes❑ No
Covered and vented? ® Yes❑ No Roll goods stored on side? ®Yes❑ No
Adhesive storage temperature Yes❑ No Unapproved, damaged, or wet ❑ Yes 0 N
maintained? material? If Yes, how disposed?
Comments: Stored material protection appears adequate.
SUBSTRATE PREPARATION
Night tie-in removed? ®Yes❑ No Substrate clean and debris ®Yes❑ No
removed?
Substrate and penetrations ready? ® Yes❑ No Substrate tested for dryness? ®Yes❑ No
Comments: Substrates that received new roofing components appeared clean and dry.
COVER BOARD APPLICATION (1" ENERGY 3)
Correct Number of fasteners & Rhino Additional fasteners at
Plates? (12 in corners, 9 at perimeter, ❑Yes❑ No perimeters and corners? 111 Yes❑ No
6 in the field)
Fasteners checked by technician? ❑yes❑ No Short insulation joints ❑ Yes❑ No
staggered?
New/Existing Insulation joints tight? ❑Yes❑ No All joints staggered between ❑ Yes❑ No
layers?
Gaps filled with spray foam? ❑Yes❑ No Drainage crickets installed per ❑Yes❑ No
plans and specifications?
Comments: Cover board installation is complete.
SINGLE-PLY MEMBRANE APPLICATION (60 MIL REINFORCED JOHNS MANVILLE TPO)
Membrane allowed to relax prior to ❑ Yes❑ No Membrane fully welded to Rhino ❑ Yes❑ No
attachment? Plates?
Membrane/plate welds checked by
technician? ❑Yes❑ No Membrane properly lapped? ❑ Yes❑ No
Seams clean prior to welding? ❑Yes❑ No Continuous weld achieved? ❑ Yes❑ No
Page 2 of 4
PSI Project No:654137 Date: 6-5-13
SINGLE-PLY MEMBRANE APPLICATION (60 MIL REINFORCED JOHNS MANVILLE TPO) (CONT'D)
Membrane flow at lap welds? ❑Yes❑ No Seams probed by technician ❑Yes 0 No
Cut edge sealant installed? ❑Yes❑ No T-patches installed? ❑ Yes ❑ No
Primary field membrane termination ❑ Yes ❑ No
(T-bar) installed?
Comments: TPO membrane installation is complete.
BASE FLASHING APPLICATION (60 MIL REINFORCED JOHNS MANVILLE TPO)
Substrate clean and prepared? ®Yes❑ No Adhesive applied to substrate ®Yes ❑ No
and allowed to dry?
Adhesive applied to back of base
flashing? ®Yes❑ No Adhesive allowed to flash off? ®Yes ❑ No
Flashing pressed onto substrate to Yes ❑ No Flashing properly lapped onto ®Yes❑ No
promote adhesion? field membrane?
Seams cleaned prior to welding? ®Yes❑ No Membrane flow at welds? ® Yes ❑ No
Continuous weld achieved? ® Yes❑ No Manufacturer's approved corner 0 Yes ❑ No
patches installed?
Seams probed by technician ® Yes❑ No Cut edge sealant installed? ❑Yes®No
Termination bars installed? ®Yes❑ No Counterfashings installed? ❑ Yes 0 No
Comments: Parapets received membrane base flashings.
NIGHT TIE-IN I DAMAGE I SITE CLEANUP INSPECTION
Night seal installed? ❑Yes 0 No Roofing appears watertight? ®Yes ❑ No
Roof drain flashings completed? ® Yes❑ No Damage to property? ❑Yes® No
Damage to clients equipment? ❑ Yes ® No Site broom clean? ❑ Yes® No
All debris removed from roof? ❑Yes® No Roof materials and equipment Yes❑ No
appear secured?
Comments:A night seal is no longer required.
Page 3 of 4
PSI Project No:654137 Date: 6-5-13
DETAIL INSTALLATION (NOTE DRAWINGS USED AS REFERENCE)
Detail# Detail Name Construction Summary(Quantity/Description/Comment)
2-A4.1 Membrane Flashing Membrane base flashing was installed along G from 1.9 to 3.1, 2.6 from
A to B, and B from 2.6 to 6 per Detail Drawing.
SUMMARY OF TODAY'S WORK/DEVIATIONS/SPECIAL NOTES:
Summary Comments: The Roofing Subcontractor cleaned the roof and installed membrane base flashing.
Work completed today appeared to conform to project plans and specifications.
Unresolved EVOCO Deviation Number(s): 0
Special Notes: None today.
Respectfully Submitted,
PROFESSIONAL SERVICE INDUSTRIES, INC.
PSI Roof Observer: Sam Stoner
CC: Portland, OR—One copy electronically
Reviewed By: Doug Roth, RRO
Page 4 of 4