Loading...
HomeMy WebLinkAboutMiscellaneous Field Test & Inspection Report 2013-6-6 (4) e legg • Information re° ''° TOBuild On Engineering•Consulting•Testing DAILY OBSERVATION REPORT OF SINGLE-PLY THERMOPLASTIC ROOFING Date: 6/6/13 PROJECT INFORMATION Client: Wal-Mart Stores, Inc. (Store#4178) Work Area: Various Areas Project Name: Roofing Project Manufacturer: Johns Manville 60 mil reinforced TPO Location: Springfield, OR Insulation Type: JM Energy 3 Isocyanurate PSI Report No.: 654137-103-18 Contractor: Central Oregon Roofing PSI Hours Worked: 12.0 Approximate Contractor Hours Worked: 12.0 SIGNATURES Sam Stoner Isaac Doug Roth, RRO PSI Quality Assurance Observer Roofing Contractor Reviewed By: Representative PSI Project Manager PROJECT STATUS AT-A-GLANCE Today's Performance Comment Construction today? ®Yes ❑ No If No Construction, Inspection Done? ❑Yes ❑ No Contractor performance issues? ❑Yes ® No Schedule/scope issues? ❑Yes ® No DAILY PRODUCTION Total Square Feet Completed To Date Previously Today's Total Square Total Square Roof Section Completed Square Feet Feet Feet in % Complete Square Feet Completed Completed Section Main Roof Area 39,049 0 39,049 39,049 100 "�� 39,049 39,049 100 Crew Size—4 Roofers—4 Sheet Metal Workers—0 Page 1 of 4 PSI Project No:654137 Date: 6-6-13 WEATHER CONDITIONS & EMERGENCY COVER ® Dry 0 Sunny ❑ Cloudy ®Windy ❑ Rain ❑ Snow Temp Range (low-high) 53°to 83° F Emergency cover/protection on-site? ®Yes ❑No Type of Protection -TPO & EPDM membrane MATERIALS CONTROL & STORAGE In original identified packaging? ®Yes❑ No Off ground or deck? ®Yes❑ No Covered and vented? ®Yes❑ No Roll goods stored on side? ® Yes ❑ No Adhesive storage temperature Unapproved, damaged, or wet maintained? Yes❑ No material? If Yes, how disposed? ❑Yes ® No Comments: Stored material protection appears adequate. SUBSTRATE PREPARATION Night tie-in removed? ®Yes❑ No Substrate clean and debris ®Yes❑ No removed? Substrate and penetrations ready? ®Yes❑ No Substrate tested for dryness? ® Yes❑ No Comments: Substrates that received new roofing components appeared clean and dry. COVER BOARD APPLICATION (1" ENERGY 3) Correct Number of fasteners& Rhino Additional fasteners at Plates?(12 in corners, 9 at perimeter, ❑Yes ❑ No perimeters and corners? ❑Yes❑ No 6 in the field) Fasteners checked by technician? ❑Yes ❑ No Short insulation joints ❑Yes❑ No staggered? New/Existing Insulation joints tight? ❑Yes ❑ No All joints staggered between ❑Yes❑ No layers? Gaps filled with spray foam? ❑Yes❑ No Drainage crickets installed per ❑Yes❑ No plans and specifications? Comments: Cover board installation is complete. SINGLE-PLY MEMBRANE APPLICATION (60 MIL REINFORCED JOHNS MANVILLE TPO) Membrane allowed to relax prior to ❑Yes❑ No Membrane fully welded to Rhino ❑Yes❑ No attachment? Plates? Membrane/plate welds checked by technician? C3 Yes❑ No Membrane properly lapped? ❑ Yes❑ No Seams clean prior to welding? ❑ Yes❑ No Continuous weld achieved? ❑Yes❑ No • Page 2 of 4 • PSI Project No:654137 Date: 6-6-13 SINGLE-PLY MEMBRANE APPLICATION (60 MIL REINFORCED JOHNS MANVILLE TPO) (CONT'D) Membrane flow at lap welds? ❑Yes ❑ No Seams probed by technician ❑ Yes ❑ No Cut edge sealant installed? ❑Yes❑ No T-patches installed? ❑ Yes❑No Primary field membrane termination ❑Yes❑ No (T-bar) installed? Comments: TPO membrane installation is complete. BASE FLASHING APPLICATION (60 MIL REINFORCED JOHNS MANVILLE TPO) Substrate clean and prepared? ®Yes ❑ No Adhesive applied to substrate ® Yes❑ No and allowed to dry? Adhesive applied to back of base ® Yes El No Adhesive allowed to flash off? ®Yes❑ No flashing? Flashing pressed onto substrate to ®Yes❑ No Flashing properly lapped onto ® Yes❑ No promote adhesion? field membrane? Seams cleaned prior to welding? ®Yes❑ No Membrane flow at welds? ® Yes ❑ No Manufacturer's approved corner ® Continuous weld achieved? EI Yes ❑ No Yes❑ No patches installed? Seams probed by technician ®Yes❑ No Cut edge sealant installed? ❑ Yes ® No Termination bars installed? ® Yes ❑ No Counterflashings installed? ❑Yes® No Comments: Membrane base flashing installation was completed today. NIGHT TIE-IN/ DAMAGE/SITE CLEANUP INSPECTION Night seal installed? ❑Yes® No Roofing appears watertight? ®Yes ❑ No Roof drain flashings completed? ®Yes❑ No Damage to property? ❑ Yes ® No Damage to client's equipment? ❑Yes 0 No Site broom clean? ❑ Yes ® No All debris removed from roof? ❑Yes ® No Roof materials and equipment ®Yes ❑ No appear secured? Comments:A night seal is no longer required. The roof appears watertight. Page 3 of 4 PSI Project No:654137 Date: 6-6-13 DETAIL INSTALLATION (NOTE DRAWINGS USED AS REFERENCE) Detail# Detail Name Construction Summary(Quantity/Description/Comment) 2-A4.1 Membrane Flashing Membrane base flashing was installed along Line 2 from A to B 7A-A4.1 Roof Top Unit Three RTU curbs were flashed per Detail Drawing. 1 SUMMARY OF TODAY'S WORK/ DEVIATIONS 1 SPECIAL NOTES: Summary Comments:Work completed today appeared to conform to project plans and specifications. Unresolved EVOCO Deviation Number(s):0 Special Notes: None today. Respectfully Submitted, PROFESSIONAL SERVICE INDUSTRIES, INC. PSI Roof Observer: Sam Stoner CC: Portland, OR—One copy electronically Reviewed By: Doug Roth, RRO Page 4 of 4