Loading...
HomeMy WebLinkAboutMiscellaneous Field Test & Inspection Report 2013-6-7 (6) • jtfine; In.f01771Cttion .TO Build On Engineering•Consulting• fisting DAILY OBSERVATION REPORT OF SINGLE-PLY THERMOPLASTIC ROOFING Date: 6/7/13 PROJECT INFORMATION Client:Wal-Mart Stores, Inc. (Store#4178) • Work Area:Various Areas Project Name: Roofing Project Manufacturer: Johns Manville 60 mil reinforced TPO Location: Springfield, OR Insulation Type: JM Energy 3 Isocyanurate PSI Report No.: 654137-104-19 Contractor: Central Oregon Roofing PSI Hours Worked: 5.0 Approximate Contractor Hours Worked: 6.0 SIGNATURES • Sam Stoner Isaac Doug Roth, RRO PSI Quality Assurance Observer Roofing Contractor Reviewed By: Representative PSI Project Manager PROJECT STATUS AT-A-GLANCE Today's Performance Comment Construction today? 0 Yes ❑ No If No Construction, Inspection Done? ❑Yes ❑ No Contractor performance issues? ❑Yes 0 No Schedule/scope issues? ❑ Yes ® No DAILY PRODUCTION Total Square Feet Completed To Date Previously Today's Total Square Total Square Roof Section Completed Square Feet Feet Feet in Tu Complete Square Feet Completed Completed Section Main Roof Area 39,049 0 39,049 39,049 100 39,049 39,049 100 Crew Size—4 Roofers—0 Sheet Metal Workers—4 • Page 1 of 4 PSI Project No:654137 Date: 6-7-13 WEATHER CONDITIONS & EMERGENCY COVER N Dry ❑ Sunny ❑ Cloudy ❑ Windy ❑ Rain ❑ Snow Temp Range (low-high) 51° to 83° F Emergency cover/protection on-site? ®Yes ❑No Type of Protection -TPO & EPDM membrane MATERIALS CONTROL& STORAGE In original identified packaging? N Yes❑ No Off ground or deck? N Yes❑ No Covered and vented? N Yes❑ No Roll goods stored on side? N Yes❑ No Adhesive storage temperature Unapproved, damaged, or wet maintained? ® Yes❑ No material? If Yes, how disposed? ❑Yes N No Comments: Very few materials remain on site. Stored material protection appears adequate. SUBSTRATE PREPARATION Night tie-in removed? ❑ Yes N No Substrate clean and debris N Yes❑ No removed? Substrate and penetrations ready? N Yes❑ No Substrate tested for dryness? N Yes ❑ No Comments: Substrates that received new roofing components appeared clean and dry. A night seal is no longer required. COVER BOARD APPLICATION (1" ENERGY 3) Correct Number of fasteners& Rhino Additional fasteners at Plates?(12 in corners, 9 at perimeter, ❑Yes❑ No perimeters and corners? CI Yes❑ No 6 in the field) Fasteners checked by technician? ❑Yes❑ No Short insulation joints ❑ Yes ❑ No staggered? New/Existing Insulation joints tight? ❑Yes❑ No All joints staggered between ❑Yes❑ No layers? Gaps filled with spray foam? ❑Yes❑ No Drainage crickets installed per ❑Yes❑ No plans and specifications? Comments: Cover board installation is complete. SINGLE-PLY MEMBRANE APPLICATION (60 MIL REINFORCED JOHNS MANVILLE TPO) Membrane allowed to relax prior to ❑Yes❑ No Membrane fully welded to Rhino ❑ Yes❑ No attachment? Plates? Membrane/plate welds checked by technician? ID Yes❑ No Membrane properly lapped? ❑Yes❑ No Seams clean prior to welding? ❑ Yes❑ No Continuous weld achieved? ❑Yes❑ No Page 2 of 4 • PSI Project No:654137 Date: 6-7-13 SINGLE-PLY MEMBRANE APPLICATION (60 MIL REINFORCED JOHNS MANVILLE TPO) (CONT'D) Membrane flow at lap welds? ❑Yes❑ No Seams probed by technician ❑Yes ❑ No Cut edge sealant installed? ❑Yes❑ No T-patches installed? ❑ Yes❑ No Primary field membrane termination ❑Yes❑ No (T-bar)installed? Comments: TPO membrane installation is complete. BASE FLASHING APPLICATION (60 MIL REINFORCED JOHNS MANVILLE TPO) Substrate clean and prepared? ❑ Yes❑ No Adhesive applied to substrate ❑Yes ❑No and allowed to dry? Adhesive applied to back of base ❑Yes❑ No Adhesive allowed to flash off? ❑ Yes❑ No flashing? Flashing pressed onto substrate to ❑Yes❑No Flashing properly lapped onto ❑Yes❑ No promote adhesion? field membrane? Seams cleaned prior to welding? ❑Yes❑ No Membrane flow at welds? ❑Yes❑ No Continuous weld achieved? ❑ Yes❑ No Manufacturer's approved corner patches installed? ❑ Yes❑ No Seams probed by technician ❑ Yes❑ No Cut edge sealant installed? ❑Yes❑ No Termination bars installed? ❑Yes❑ No Counterflashings installed? ❑ Yes❑ No Comments: Membrane base flashing is complete. NIGHT TIE-IN/ DAMAGE /SITE CLEANUP INSPECTION Night seal installed? ❑ Yes 0 No Roofing appears watertight? 0 Yes ❑ No Roof drain flashings completed? ®Yes❑ No Damage to property? ❑Yes® No Damage to client's equipment? ❑ Yes® No Site broom clean? ❑ Yes ® No All debris removed from roof? ❑Yes No Roof materials and equipment ®Yes❑ No appear secured? • Comments: The roof appears watertight. • Page 3 of 4 PSI Project No:654137 Date: 6-7-13 DETAIL INSTALLATION (NOTE DRAWINGS USED AS REFERENCE) Detail# Detail Name Construction Summary(Quantity/Description/Comment) 1-A4.2 Parapet Cap The contractor elected to install the pre-existing metal cap flashing per Flashing the original detail (SMACNA 3-3#18 Butt Seam with Backup Plates) SUMMARY OF TODAY'S WORK/ DEVIATIONS/SPECIAL NOTES: Summary Comments: Stedman Sheet Metal re-installed the existing parapet coping. A new continuous cleat was fastened 6" on center with 1.5" double hot dipped galvanized nails. The cleat was set in a bed of Tremco Spectrum (S1) prior to attachment. The existing coping system utilized 6" wide concealed splice plates at the coping butt joints. The contractor duplicated the concealed splice plate system. Three beads of S1 were applied to each side of the splice plate prior to setting and fastening the metal coping. 0.25" gaps were maintained between the successive lengths of coping to allow for thermal movement. Unresolved EVOCO Deviation Number(s): 0 Special Notes: None today. Respectfully Submitted, PROFESSIONAL SERVICE INDUSTRIES, INC. PSI Roof Observer: Sam Stoner CC: Portland, OR—One copy electronically Reviewed By: Doug Roth, RRO Page 4 of 4