HomeMy WebLinkAboutPermit Mechanical 1986-2-14
R E 51 0\' J T I A L . ·
APPLICATION/PERMIT
225 North 5th Street
Springfield.. Oregon 97477
Building Division
726-3753
illl, ,
Iii
Rcce~pt!! 6 /" 'C;Cj' fc, Y
Job Location:
4tftf1: C/;And!Z:; /' ,
r I'J (J ex 3 ~ 3 L( . T= Lot #
ocfiffJ?
Assessors Map #
Subdivision:
()z,mer:
~~~. fYldt~
t/L/L/1- ~~Lt~ Phone:
Addr>ess:
Ci ty :
i
I
J I
I
II
II
I
N",w
Addition
Remodel
Nobile Home
. ~~(tf~9ro
Date of Application
Contractors
General
Plumbing
/! A
CL2uC!L~(
C
i Electrical
Mechar.icd
ConstY'Uction Lender
?t(6 -S-r/;?J
Zip:
DescY"':be Il'0rk:
~J2~
Value
Add.~ess
,
I /1-;J
C/ J1ALf 1L//jI{),j
",.
~~
/AcUo/C
Signed:
Date:
CL
,;2 -( cf --V b
Lisc.#
Expires
Phone
!
I
I
I
1
It is the responsibility of the permit hoUier to see that all inspections are made at the proper time, that eachwddress is rea=abce
from the street,. and that the peY'mit caY'd is located at the front of the property.
*Bui?-ding D~vi::io~ approved plan shaU l'emain on tha Bu~Zding Sits at aU times.
PROCEDURE FOR INSPECTION RE'QUEST:CALL 726"':_3769 (recorder) state your City designated job number, job address, type of inspec7:ic/i
requested and when you wilZ be Y'eady for inspection, Contractors or OWners nc~e end phone number. Requests received befcre 7:00 ~
will be made thc same day, Y'equests made aftcr 7:00 am will be made the next working day.
Reouired InsDections
SITE INSPECTION: To be made
excavation, ~ut prior to set
forms. '
o
o
after
up of
UNDERSLAB PLUMBING. ELECTRICAL &
MECHANICAL: To be made before any
work is aovered.
o
FOOTING & FOUNDATION: To be made
after trenches are excavated and
forms are erected, but prior to
pouY'ir~ concrete.
UNDERGROmiD PLUMBING. SEWER. WATER.
DRAINAGE: To be made prior to fi l-
Ung trenches.
[J
[J
[J
UNDERFLOOR PLUHBING & MECHANICAL:'
To be made prior to installation of
floor insulation or decking.
POST AND BEAM: To be made prior to
installation of floor insulation or
decking .
ROUGH PLUMBINC. ELECTRICAL & MECH-
ANICAL: No work is to be covered
until these inspections have been
made and appY'oved.
FIREPLACE: PY'ior to placir~ facing
materials and before fY'aming inspec-
tion.'
FRAMING: Must be requested afteY'
approval of rough plumbing, electri-
cal & mechanical. AU roofing
bracing & chimncys, etc. ~~st .be
. completed. No work is to be con-
,'cealed until this inspection has
'been made and approved.
o
D
[]
Your City Desigr~ted Job Numbcr Is:
o
INSULATION/VAPOR BARRIER INSPECTION:
To be made after all insulation ~.d
required vapor barriers. are in place
but before any lath, gypsum board or
waZZ covering is applied, and before
any insulation is concealed.
g &009(
DEMOLITION OR !~{oVEJ) BUILDIiiGS
~ Sanitary se'.Jer aapped c:.t p~opeY't:J Zir:.e
~.sePtia tank p~~ed and filZed with gra~eZ
I Pinal - Ilhen above items are ccrrrpleted
~ and when ~emcZition is complete or stru~-
ture moved and premises cleaned up.
Mobile Homes
:=J Blocking and Set-up
:=J Plumbing connections s~er ar.d water
~ Electrica~ Connectio~ - Blocki~~, set-u;,
~ and plumb"ng .connect"ons nr~st.ce approvec
before requesting elec~Y'ical inspec7:ion
. =:J Aqcessor,i Bu~lding .
~ Pinal - After pOY'ches, sk~rting, decks,
~ etc. are compleocd.
o
=:J FINAL PLUMBING
All project conditions, such as the installation of street trees, cO"pletion of the
requii>ed landscaping, etc., must be satisfied before the BUILDING FINAL can be requested.
-fSL FIliAL MECHANICAL
~ FINAL ELECTRICAL
=:J
o
FINAL BUILDING: The Final Building Inspection must be requested after the tinal Plumbing
Electrical, and Mechanical Inspections have been made and approved.
o
DRYWALL INSPECTION: Tc be made
after aU dr>ywaZZ is in place, .
but prior to any taping..
*ALL MANHOLES AND CLEANOUTS MUST BE ACCESSIBLE, ADJUST!/EN'!' TO BE !,f.1DE J1T NO COST TO CITY Pa~e 1 of 2
O MASONRY: Steel
beams, grouting
accordance with
2415.
'Qf WOODSTOVE: After instaUation is
Fccmpleted.
D CURB & APPROACH APRON:. After forms
'are erected but Pl>ior to pouring ,
concrete.
location, bond
or verticals in
U. B. C. Section
o
SIDEWALK &. DRIVEliAY:. 'For' aZZ con-
crete paving within street right~
of-way, to be made afteY' aU exca- '
vating complete & form work & sub-
base material in place.
D
PENCE: ~'hen complete -- Provide'
gates or movable sections through
P.U.E. .
D
I NO. t FEE oil'.
I
I
\ JOB NO. r00CC! /
I
i Zone:
Lot Sq. Ftg.
% of let Coverag~
,Ii of Stories
ITotaZ Height
I
I Topography
I
I
I ITE!,j SQ. FTG
Iuain
I Garaae
I Carvor t
I
Accessorl/
S.D.C.
TOTAL FALUE
(vawe)
1.5 x
Building Permit
State SUI'charge
Total Charges
lITEM
FixtUI'es
IResidential (1 bath)
Sanitary Sewer
rvater
Plumbing Pemit
State SUI'cr.arge
TotaZ CharGes
I ITEM
I Res. Sa. fta.
!New/Extend Circuits
I Temporary Service
Electrical Permit
State SUI'charqe
Total Charaes
ITEM
Furnace ETU' S
Exhaust Hood
I Vent Fan
I
i Woodstove
,
I
Per>mit Issuance
Mechanical Permit
State SUI'charoe
Total CharGes
-- ENCROACHMENT
-
Se~~rit1.{ Devosit
Storage
MaintenaYUle
Permit
Total Charaes
CUI' b cu t
Sidewalk
Fence
ElectY'ical Label
Mobile Home
TOTAL AJ.!OUNT DUE: *
SOLAR A
'= S S R EQ.-
Occuvanc~ Grouv:
LOT TYPE
Interior
Corner
Panhandle
Cul-de-sac
x
Value
NO. . FEE
NO.
FEE
CHARGE
I
I
I
I
15< 6'6 I
I .Lonl
115'. (e, C) I *
(5: ~O
~'
,
I
j
!
I
I
I
I
I
I
I
L - CO G~
I Lot Faces -
I
I P.L.
INorth
East
South
West
Type/Cor.st:
Bedrooms:
Ener{'fl/ Sources
Heat
Water Heater
Range
Fireplace
Woodstove
T"De
Setbacks
I House : Carage
I I
I Access.
I
j
I,
I I
I I
I I
II
Fees
Building Value & Permit
This pernr:t is granted on the express condition that the said construction
shall, in all respects, conform to the Ordinance adopted by the City of
Springfield, including the Zoning Ordinance, regulating the construction
and use of buildings, and may be suspended or revoked.at any time upon vio-
lation of any provisions of said Ordir~nces.
'i.
Plan Check Fee:
Date Paid:
Rec~ipt #:
I Signed:
Plumbing Perrrdt
No person shall construct, install, alter or change any ne~ or existing
plumbing or drainage syste~ in whole or in part, unless such person is the
legal possessor of a valid plumber's license, except that a person may do .
plumbing work to. property which is owned, leased or opefatedby the appli-
cant.
Electrical
Permi t
Where State Law requires tr~t the electrical work be done by an Electrical
Contractor, the electricaZ portion of this permit shall not be valid until
the label has been signed by the Electrical Contractor.
*
I
Meche nical Permit
Plan Examiner
Uat;e
I HAVE CAREFULLY EXAMINED the completed application for peI'lT/it, and do
hereby certify that all information hereon is true and correct, and I
further certify that any ar.d aZZ work pdx>formed shaZZ be done in accor-
dance with the Ordinances of the City of Springfield, and th~ L~~s of the
* State of Oregon pertaining to the work described heY'ein, and that NO OCCU-
PANCY will be made of any structure without permission of the Building Di-
vision. I further certify that only contractors and employees who are in
compliance with ORS 701.055 will be used on this pY'oject
*
Sign"d ~nfj, ()
,~, J l) - "iJGJ
Date
IJ'1~Y)