HomeMy WebLinkAboutPermit Fence 1984-5-30
.. RESID .JTJAl..
. ,APPLICATION/PERMIT
225 North 5th Street
Springfield, Oregon 97477
., Bui lding Division
726-3753 '
SPRINGFIELD
Job Location:
"'-
Tax Lot -;; 044 \ 2.J
~.
Assessors Map :#
Subdivision:
~.
{ciAo. i ~
Rece-:.pt .11
~
..~
,~
Owner:~r(\. ~_ ~ E:\'{'J}O(\\"~A
Addr"'~7\~~~!)~ll!Ql(L Ph""" (Y-\'\-8'ltt
city:~~l\' . ~J~;~) zip: qf\A/)B
~o<
~w
Addi tion
Remodel
Nobile Home
Date of Application
Contractors
General \ ~ ,\.~
Plumbing
Electrical
Mechar:ical
Construction Lender
Describe [{or/(:
VaZue
Address
OO~
Signed:
Date:
~11Jj..J
~.!:!X )f~
Expires ~ Phone
l/ZQ /f14
Lisc.#
112.\fY)
l -
It is the responsibility of the permit hoUier to see that ali inspectio~ are made at the proper time, that each ~ess is readab~e
from the. street, and that the permit card is located at the front of the property.
*Bui!ding Divicion approved plan shall remain on the Building Site at all times.
PTIOCEDURE FOR INSPECTION REQUEST:CALL 726-3769 (recorder) state your City designated job number, job aacress, type of inspecticn
requested and when you will be ready for inspection, Contractors or' Oumers ncme and phone number. Requests received before 7:00 <r:1
wiZZ be made the same day, requests made after 7:00 am wiU be made the next :.Jorking day.
!B4()~\
Reauir'ed Insvections
O SITE INSPECTION: To be made after
excavation, but prior to set up of
forms.
~ UNDERSLAB PLUMBING. ELECTRICAL &
.--J . MECHANICAL: To be made before any
work is covered.
o
FOOTING & FOUNDATION: To be made
after trenches are excavated and
forms are erected, but prior to
pouY'ing concrete.
UNDERGROUND PLUMBING. SEWER. WATER.
DRAINAGE: To be made prior to fil-
Zing trenches.
o
o
UNDERFLOOR PLUMBING & MECHANICAL:
To be made prior to installation of
floor insulation or decking.
POST AND BEAM: To be made prior to
installation of floor insulation or
decking.
ROUCH PLUMBING. ELECTRiCAl, & MECH-
,ANICAL: No work is to be covered
,until these inspections have beer; ,
made and approved.
FIREPLACE: Prior' to placir.g facing
materials and before framing inspec-
tion.
D FRAMING: Must be requested after
approval of rough plumbing, electri-
,cal & mechanical. AU roofing
bracing & chimneys, etc. ~~st be
;' comp leted.' No work is to be con-
""cealed until this inspection has
~been made and'approved.
o
o
o
.Your city Desigr~ted Job Number Is:
O INSULATION/VAPOR BARRIER INSPECTION:
' To be made after aU insulation ar.d
required vapor. barriers are in place
'" ' .hut before any lath, gypsum board or
wall covering is applied, and before
..any insulation is concealed~
DRYWALL INSPECTION: To be made
after aU drywaU is in place,
but prior to any taping.
O MASONRY: Steel location, bond
beams, grouting or verticals in
accordance with U.B.C. Section
2415.
, D WOODSTOVE: After instaUation is
completed.
~
D
CURB & APPROACH APRON: After forms
are er'ected but prior to pouring
concrete.
. DEMOLITION OR ,'.!OVED BUILDDiGS
3 Sani tary se'.Jer capped at p~operty Zir.e
~ Septic tank p~~ed and filled with gra~eZ i
I Final - mIen above items are completed !
~ and when demolition is complete or struo- i
tUI'e moved and premises cleaned up. I
i
!
Mobile Homes
~ Blocking and Set-up
=:J Plumbing connections sewer and water
~. Electrical Connection - Blocking, set-up
~ and plumbing connections nr~st be approved
, before requesting electrical inspec~ion
==:J Accessord Building
I Final - Aftar porches, skirting, decks,
~ etc. are completad.
o
All project conditions, such as the installation of street trees, cc~letion of the
required landsccping, etc., must be satisfied before the BUILDING FINAL can be request3d.
D FIliAL PLUMBING
o FINAL MECHANICAL
o FINAL ELECTRICAL
CJ
o
FINAL BUILDING: The Final Building ,Inspection must be requested after the Final Plumbing
,Electrical, and Mechanical Inspections have been made and approved.
,0
SIDEWALK & DRIVEWAY: For aU c:on-
crete paving within str'eet right-
of-way, to be made after all exca-
vating complete & form work & sub-
base material in place.
*ALL MANHOLES AND CLEANOUTS MUST BE ACCESSIBLE, ADJUST!fENT TO BE n~DE AT NO COST TO CITY I Page 1 of 2
~NCE: A'hen complete -- Provide
~ gates or movable sections throu?h
P.U.E. '
o
I JOB
I
I Zone:
NO.
Lot Sq. Ftg.
% of lotCoveY'age
# of Stories
Total Height
I Topography
I
I ITEMSQ.FTG
I Main
I Garaae
CarvoY't
Accessorl/
Is.D.c.
TOTAL VALUE
(vatue)
1.5 x
Building Permit
State SUI'charge
Total Charges
I ITEM NO.
I FixtUI'es
IResidential (1 bath)
Sanitary Sewer
Water
Plumbing Pemt
State SUI'ar.arge
Total Charoes
I ITEM
Res. Sa. fta.
N8W/Extend Circuits
I Temporary Service
ElectricaL Permit
State SUI'charqe
Total Charr:;es
ITEM
I Furnace ETU' S
Exhaust Hood
Vent Fan
woodstove
Permit Issuance
Meahanical Permit
State SUI'charoe
Total Charaes
-- ENCROACHMENT --
Se~~ritl/ Deposit
I StoY'age
I Maintenance
I Permit
Total Charoes
I Curbcut
I Sidewalk
I Feme
I ElectY'ical Label
I ..
! Mob'/..e Home
TOTAL AMOUNT DUE: *
L -CO G~
SOL A R .6"" C E S S R E Q.-
Occupancy GY'~,
LCTTYPE
NO.
NO.
x
FEE
FEE
FEE
Interior
ComeI'
Panhandle
Cul-de-sac
Value
I
I
I
I
CHARGE
CHARGE
CHARGE
I
r
I
1*
I
I
\S!90 I
I
I
I
I
IB~
Type/Cor:st:
Bedrooms:
I Lot Faces -
I Setbacks
I. P. L. House Garage
INorth
lEast
ISouth
IWest
I EnerolJ Sources
I Heat
I
I I
I
I
II
TUDe
Access.
Water Heater
Range
FiY'eplace
Woodstove
Fees
I
Building Value .& . Permit
This permit is granted on the express condition that the said construction
shaH, in aU respects, conform to the Ordinan.ce adopted by the City of
Springfield, incZuding the Zoning Ordinance, regulating the construation
and use of buildings, and may be suspended or revoked at any time upon vio-
lation of any provisions of said Ordinances. .
*
I *
Plan Check Fee: I
Date Paid: i
I Receipt #: . j
I Signed: !
. Plumbing Permit
No person shall construct, instalZ. alter or change any r~w or e--isting
plumbing or drainage syste~ in whole or in part, unless such peY'son is the
legal possessor of a valid plumber's license, except tr~t a person may do
plumbing work to property which is owned, leased or operated by the appli-
cant.
*
Electrica I Perm it
I
I
I
I
I *
r
I
I
I
I
I
Where State Law requires tr~t the electrical work be done by an Electrical
Contractor. the electrical portion of this permit shall not be valid until
the Zabel has been signed by the ELectrical Contractor.
Mechanical Permit
I *
Plan Examiner
uat;e
I HAVE CAREFULLY EXAMINED the completed application for permit, and do.
hereby certify that all in.formation hereon is tY'Ue~and correct, and I
further certify that any ar.d aZZ work performed shaZZ be done in accor-
dance with the Ordinances of the city of Springfield. and the~~s of the
State of Oregon pzrtaining to the work described herein, and that NO OCCU-
PANCY win be made of any structure without permission of the BuiZding Di-
vision. I furtheY' certify that only contractors ~"d e~lQyees who are in
compliance with ORS 701.055 will be used on this project
~~d~
f73~/ Fi