HomeMy WebLinkAboutBuilding Correspondence 2007-7-19 • SCANNED K & A Engineering, Inc. 3327 Roanoke Ave., Eugene, OR 97408 (541) 684-9399 Voice (541) 684-9358 FAX engineering July 19,2007 Project:42.06 • Mr. Duane Knights 2258 33rd St. Springfield, OR 97477 • Subject: Foundation pad inspection Springfield permit no. COM2006-00115 6263/6265 Aster St., Springfield, Oregon PURPOSE AND SCOPE As requested, we have inspected the foundation pad excavated for the subject project. K &A Engineering, Inc. has previously provided geotechnical recommendations for development of this project site.' The purpose of . our inspection was to determine if the foundation pad has been prepared to adequately support foundation loads of the proposed 2-story duplex. The scope of our services for this inspection included several visual inspections during site development and this report. SITE INSPECTIONS • Buttress Retaining Walls We inspected the site during construction of the buttress retaining walls (designed by K&A Engineering, Inc. and provided with our supplemental recommendations dated October 18, 2006). Two terraced retaining walls, consisting of segmental masonry facing with geogrid-reinforced mechanically stabilized earth backfill, were constructed to our specifications for materials and methods. The subgrade for these walls was prepared according to our recommendations and consisted of dense basalt silty-gravelly colluvium and bedrock. Foundation Pad The foundation pad located below the retaining walls, adjacent to the street right-of-way, consists of two benches cut into the native dense basalt colluvial silty-sandy-gravelly colluvium. A thin lift (approximately 3 to 4-ihchesof 3 -inch minus dense-graded crushed aggregate was placed on the undisturbed colluvial subgrade. SUMMARY AND RECOMMENDATIONS Based on our site inspections, it is our opinion that the site has been adequately prepared according to our recommendations and will provide suitable support for the proposed foundation system. "'Level II geotechnical site assessment" September 21, 2006; "Supplemental recommendations—Springfield LDAP plan review/correction letter dated 9/12/2006," October 18, 2006; and "Supplemental recommendations—wet weather construction," December 6, 2006. • . K & A Engineering, Inc. We recommend acceptance of the foundation'pad and buttress retaining wall system, as constructed, by the local building official. Please note that it is vital that the perimeter foundation drainage system be constructed according to our original recommendations. This drainage system should be installed after construction of the perimeter footing and stem wall. Thank you for the opportunity to be of service. Please call us if you have questions or need further assistance. Sincerely, SPED PROFFS cc - 9 r OREG'N koy En-e` oa~ EXPIRES • Michael Remboldt, P.E. K &A Engineering, Inc. • • • • • Project: 42.06 6263/6265 Aster St.,.Springfield, Oregon Page 2 of 2 Client: Knights July 19, 2007 • •