Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Permit Building 1985-7-24
oy •• RESIDTIAL• • =eceiptG �oi1 APPLICATION/PERMIT SPRINGFIELD 225 North 5th Street Springfield, Oregon 97477 - '°; > Building Division 726-3753 • Job Location: 4507 Aster Street, Springfield, Oregon- 97478 . 3-c )1(\ Assessors Map II Tax Lot # n y Subdivision: �/ Owner: Mr. & Mrs. Don Bitle 0 Address: 4507 Aster Street Phone: 746-2825 J F") City: Springfield, Oregon Zip: 97478 F Describe Work: A • New 6 ' C D x Addition Add, solar domestic hot water heat in ■`9� Y system -- (3) solar collectors & , Remodel storage tank. • IC Mobile Home Signed: __ Date: 7- a-1-'1"S6< Date of Application 7'a 44- 8 S . Value ` ✓ 3, 995. Contractors Address Lisc.# Expires Phone General SUNDANCE SOLAR 4093 West 11th Avenue, Eugene, Oregon 97402 4487 4/3/1986 344-1594 Plumbing - • • Electrical ' Mechanical - .. . Construction Lender - - It is the responsibility of the permit holder to see that all inspections are made at the proper time, that each address is readable from the street, and that the permit card is located at the front of the property. *Building Division approved plan shall remain on the Building Sits at all times. PROCEDURE FOR INSPECTION REQUEST:CALL 726-3769(recorder) state your City designated job number, job address, type of inspection requested and when you will be ready for inspection, Contractors or Owners name and phone number. Requests received before 7:00 an will be made the sane day, requests made after 7:00 am will be made the next working day. �•'' Your City Designated Job Number Is: q J 0557 Required Inspections - [ SITE INSPECTION: To be made after INSULATION/VAPOR BARRIER INSPECTION: DEMOLITION OR MOVES BUILDINGS excavation, but prior to set up of To be made after all insulation and forms. required vapor barriers are in place I Sanitary sewer capped at property line I IUNDERSEAS PLUMBING, ELECTRICAL & but before any Lath, gypsum board or - MECHANICAL: To be made before any _ wall covering is applied, and before ! Septic tank ganged and filled with gravel work is covered. 'any insulation is concealed. IFOOTING & FOUNDATION: To be made DRYWALL INSPECTION: Te be made Final - When, above items are completed after trenches are excavated and after all drywall is in place, and when demolition is complete or struc- forms are erected, but prior to but prior to any taping. tore moved and premises cleaned up. pouring concrete. MASONRY: Steel location, bond UNDERGROUND PLUMBING, SEWER, WATER, n beans, grouting or verticals in DRAINAGE: To be made prior to fil- accordance with U.B.C. Section Zing trenches. 2415. Mobile Homes • 1 BlocUNDERFLOOR PLUMBING & MECHANICAL: I WOODSTOVE: After installation is king and Set-up � To be made prior to installation of f I completed. Plumbing connections -- sewer and water floor insulation or decking. R^3 7-1 POST AND BEAM: To be made prior to CURB & APPROACH. APRON: After forms Electrical Connection - Blocking, set-up installation of floor insulation or are erected but prior to pouring and plumbing connections must be approved decking. concrete. before requesting electrical inspection ;� ROUGH PLUMBING, ELECTRICAL & ;TECH- I SIDEWALK & DRIVEWAY: For all con- ANICAL: No work is to be covered crete paving within street right- I gcaessor^y Building until these inspections have been of-way, to be made after all exca- . made and approved. voting complete & form work & sub- Final - After porches, skirting, decks, FIREPLACE: Prior to placing facing base material in place. I ft etc. are completed. • materials and before framing inspec- • tion.. . FRAMING: Must be requested after I complete -- Provide FENCE: When con P I approval of rough plumbing, electri- gates or movable sections through. cal & mechanical. All roofing P.U.E. bracing & chimneys, etc. must be • :completed. No work is to be con- , .=cealed until this inspection has 'been made and approved. All project conditions, such as the installation of street trees, cccpletion of the 71 FINAL PLUMBING required landscaping, etc., must be satisfied before the BUILDING FINAL can be requested. FINAL MECHANICAL FINAL BUILDING: The Final Building Inspection must be requested after the Final Plumbing Electrical, and Mechanical Inspections have been made and approved. FINAL ELECTRICAL - • "ALL MANHOLES AND CLEANOUTS MUST BE ACCESSIBLE, ADJUSTMENT TO BE MADE AT NO COST TO CITY Pace 1 of 2 Page 2 �h5 JOB NO. O557 SOLAR ASESS REQ.- • L-COG# , Zone: Occupancy Grou . Type/Corst: Bedrooms: Lot Sq. Ftg. LOT TYPE Lot Faces - Energy Sources Tune Setbacks Heat R of lot Coverage Interior P.L. House Garage Access. Water Heater # of Stories Corner North Range Total Height _ Panhandle East Fireplace Topography Cul-de-sac South Wcods tare West -- Fees -- ITEM SQ.FTG X Value Alain Building Value & Permit This permit is granted on the express condition that the said construction Garage shall, in all respects, conform to the Ordinance adopted by the City of Carport Springfield, including the Zoning Ordinance, regulating the construction and use of buildings, and may be suspended or revoked at any time upon vio- Accessory lation of any provisions of said Ordinances. TOTAL VALUE Ivatue) S.D.C. 1.5 x I x Building Permit /6..00 Plan Check Fee: State Surcharge ' .;„ry 0 Date Paid: Receipt Total Charges '- / 0 . 4 D Signed: #: : ITEM W. FEE CHARGE ' Fixtures Plumbing Permit Residential (1 bath) No person shall construct, install, alter or change any new cr existing plumbing or drainage system in whole or in part, unless such person is the Sanitary Seiner legal possessor of a valid plumber's license, except that a person may do plumbing work to property which is owned, leased or operated by the appli- Water fit' Plumbing Permit to. O O State Surcharge , Y0 Total Charges l° •(10 ITEM NO. FEE CHARGE Res. Sq. ftg. Electrical Permit Neu/Extend Circuits Where State Law requires that the electrical work be done by an Electrical Contractor, the electrical portion of this permit shall not be valid until Temporary Service the Zabel has been signed by the Electrical Contractor. Electrical Permit State Surcharge Total Charges ITEM NO. FEE CHARGE Furnace BTU'S Mechanical Permit Exhaust Hood - Vent Fan Woods tore Permit Issuance Mechanical Permit State Surcharge Total Charges -- ENCROACHMENT -- Security Deposit Plan Examiner Date Storage Maintenance I HAVE CAREFULLY EXAMINED the completed application for permit, and do hereby certify that all information hereon is true and correct, and I Permit farther certify that any and all work performed shall be done in accor- dance with the Ordinances of the City of Springfield, and the Laws of the Total Charges ' State of Oregon pertaining to the work described herein, and that NO OCCU- PANCY will be nude of any structure without permission of the Building Di- Curbcut vision. I further certify that only contractors and employees who are in compliance with ORS 701.055 will be used on this project Sidewalk Fence Electrical Label Mobile Home Atta r 7(29/93 Signed Date TOTAL AMOUNT DUE:' O x • • 4093 W. 11th Avenue UNDANCE SOLAR • Eene, CR 97402 31+4-1594 INSTALLATION AGREEMENT SUNDANCE herein termed"Contractor"and This Contract valid as of the date of acceptance between SOLAR Name P0k' e, S i n-ae 1 (Amur)? F 172^E- herein termed"Buyer." Address ' /so 7- 7 �A STE Rn 7�r) 74/1/4,--;-) City SPh t)0G- F FL O////0/Stater Fi.E ,-O Zip 4 i 4 7 7r Telephone "8Z5- Date of the Contract 7t tc-- I / - Contractor agrees.subject to the terms and conditions hereof.to furnish labor and materials necessary to erect the following: One (1)completely installed solar hot water heating systems. i' I A hi« 90a K Buyer agrees to pay the following price. (A l e-r Cash price $ S99S. 0o 5E_ L La.R w it.L PR0Utr)-_ F09 Down payment $ *00 .© n 4LL peRM fro, pass, 4'-W Balance 5.3596 .0 0 1tuSPEc77 t)5 . "NOTICE TO BUYER" 1. The complete terms and conditions of this contract are printed on the reverse side of the original and the cus- tomer's copy of this contract and constitute the entire contract between the parties. 2. The buyer's signature is conclusive evidence that he had read the entire contract before affixing his signature and acknowledges the receipt of a copy of this contract. Gj,u-7'R4CT ,cvcL-uDS 's cor}IPtere tic S-Get L1-77o4v .4 lop s r,4+ZT-UP, _ ,. Buyer acknowledges receipt of a copy of this agreement. Co ntraacct_or (Seller) r Owner(Buyer): B /1(01 A/(Seller) SA-- (.n1tl X�!m� ` ,11,„ - /(�� , "SaL�sperso Owner Buyer Signature ` . r Date` i Accepted by ;5C.,c - / z ; 7//;-1.'S Contractor Setter Tate Owner-Buyer Signature " Date V Date . • TERMS AND CONDITIONS • ' 1. Guarantees and Warranties That the solar energy system,any component,or assembly is free from defects in workmanship.materials or installation That the Contractor shall remedy the system or component including it necessary.repair or replacement at the site.without charge and within a reasona- ble time,in instances of detects in materials.workmanship or installation which become evident within(1)year of the dale of installation completion That the Contractor shall provide for held inspection of the system or components for a period of one year from the date of installation completion without charge to the retail buyer,to verify lailure.establish probable cause.and determine what corrective action is required All manufactured equipment or appliances installed as provided for in this Contract shall carry the manufacturer's warranty only The above warranties are limited to defects to matenals and workmanship.The above warranties are valid only if the equipment has been used and main- tained in accordance with the instruction contained in the owner's manual.Except as otherwise set forth herein,the above warranties are given In lieu of all warranties,express or implied,including without limitation,the warranty of merchantability and the warranty of suitability for•particular pur- pose.It is expressly agreed that contractor assumes no liability for any consequential damages arising out of the breach of this contract such as those that may be caused by leakage,loss of use,acts of God,unusual natural conditions,owner's abuse,Inconvenience or other damage to real or personal property.Buyer's remedy shall be limited to repair or replacement of the defective parts as described above. 2. Contracts and Specifications This Contract constitutes the entire Contract,and the parties are not bound by any oral expiession or representation by any agent of either party purport- ing to act for or on behalf of either party or by any commitment or arrangement not specified in the Contract Any plans and other data furnished with this Contract are descriptive of the specifications and terms and conditions contained herein,and in case Of con- flict between the provisions staled rn the plans and other data and the terms of this Contract the terms of the Contract shall prevail Any action for the breach of this contract,including warranties arising from it,must be commenced within one(1)year after the cause of action accrues. 3. Additional Work No additional work shall be done without the p":or wrmen aulnon:anon of Buyer.Any such authorization shall he on a change-order form approved by both parties.which shall become a part of this Contract e. Responsibilities of Seller-Conditions and Limitations Contractor agrees to do all work provided in this Contract in a good and workmanlike manner,but shall not be responsible for delay or failure to perform work when such delay or failure is due to ACS of God.war,nols or other civil disturbances.strikes,government prohibition,non-issuance of as required per- mits affecting construction,or reasons beyond its control S. Responsibilities and Representations of Buyer Unless otherwise specified.the contract price Is based upon Buyer's representation that there are no conditions preventing Contractor from proceeding with usual installation procedures.that the roof and roof support and all existing electrical and plumbing work comply with applicable building code require- ments,and are capable of carrying the extra load caused by the work to be perOrmed by Contractor.Any.electrical or gas meter charges required by public authorities or utility companies are not included in the price of this Contract,unless included in the specifications If existing conditions are not as represented. Buyer assumes all responsibility for the installation and any damages flowing therefrom Any change in specifications or installation necessary to conform to existing or future building codes.zoning taws.or regulations of inspecting public authorities shall be considered additional work to be paid for by Buyer 6. Default In event of default by Buyer Many provision of this Contract.Buyer agrees to pay all Celtecflon costs interest from the date of default and reasonable attor- neys fees In the event of default of any installment payment.Contractor at its option may declare the entire balance of the Contract immediately due and payable Contractor retains all lien rights provided under Oregon law 7. Assignment Contractor may assignor subcontract all nr any portion of the work to be done thereunder • 8. Placement Contractor will be the sore determinant Or the placement of the unit If Buyer requests other placement.Contractor is released from any claims regarding efficiency of unit Buyer has requested a Change in placement and acknowledges responsibility Buyer 9. Certificate of Completion Buyer agrees upon completion of m51ana1•on to sign Contractor s certificate of completion upon request. 10. Entirety of Agreement This written Contract constitutes the entire agreement between the parties id ative to this transaction Buyer.by signature hereto,warrants that no rePre- sentations.warranties.consideration or promises have been made or given by Contractor or its agents or relied upon by Buyer except those contained in this written Contract Any subsequent agreement referenced heteto shall be binding only if in writing and signed by the parties No agent,salesperson.representa- tive or other employee of Contractor,dealer or any other person is authorized to make any representation.statement.guarantee or warranty other than those specifically provided for herein Contractor and Buyer snail not be bound by any statement or promise not embodied herein BUYERS RIGHT TO CANCEL: H this agreement was solicited at a residence other than that of the seller and you do not want the goods and services,you may cancel this agreement.without penalty,cancellation fee or other financial obligation by mailing a notice to the seller.This notice must say that you do not want the goods or services and must be mailed before 12:00 midnight-of the third business day after you sign this agreement.This notice must be mailed to: Sundance Solar 4093 w, llth. Eugene Ore. 97402. However, you may not cancel if you have requested the seller to provide goods or services without-delay because of an emergency, and (1)the seller in good faith makes a substantial beginning of performance of the contract before you give notice of cancellation,and(2)In the case of goods,the goods can not be returned to the seller unless in substantially as good a condition as when received by the buyer. • ' _ Z✓-I-wv--r roL..� s N - - • Poo• v6+- 7-Sal- Px1 ri/ 5. (0,) ',I---ill 1- Co'_ j - o t-iorc,f z. -4 e srs C NN 'ro "Tor p° Gf5-I.or-I TP+Js- ?o" s clo - P c a "1"4.4.... Eo•re' Gar IP s--wp ES of P-�•iv 110 • _I■I■_I • i rov Ai-x-r Per 4 IZ° 61 E G -r lo I-i Fret ecr 13'7 I.oGrrtorIS I%SII — ur-h7e 2 FAR ris a xArt vfH 0 1 • APING - I t _st i _Th t— (37 F r0.144-hGr.�o. (3)LGi.I.ecraf I — -- �x� 4 -visor- PP-'ve- H lal • I I • Perm 4firIa To I rIii wm.4. ft Hrw L— _ • . • . 7ou-n-j . • L A NJ BITLE RESIDENCE L D ��C a COLLECTOR DETAILS S.I�R1,,`p ,� - �` t o n,�n A RMO� ers A R C H I' T E C T U R E en it ;'"1 reg c . M111/4).04418 t1A� '✓pRi,.lq Fi Ea..-0 i aft la n& • EUGENE. OREGON • m w w a C� erre: �.,ate* 'n,-w+-J ear ; tea. �4' 344- 1 5 I • • • SOLAHART SCHEMATIC • • • • • . . _ • ; STORAGEiHEAT EXCHANGER- , I • .• • TO ! FRO," • :COL ECTORS • • BY—PASS VALV • • • • • • fCHECK VALVE el t.l GATE VALVE • 'COLD IN • t -am 'HOT OUT • i-re ' 'MIXING VALVE 4- 'UNIONS ctslisp • - WILLIAM A. RANDALL tca cr.„7 XISTING FIW touakk...,ot. ° EUGENE, OREGON ° <PA • • e- • •- 1:101LER DRAIN • • t OF OICL%‘ • • • • • • 5. GENERAL INFORMATION FOR INSTALLATIONS • We consider that the Solahart 300LJ solar hot water in areas with poor quality water supplies. system is the most technically advanced thermo- In areas subject to freezing temperatures. this closed syphon solar water heater available, designed to collector circuit must be filled with a special long- incorporate a sealed water circuit for the solar • life Solahart 'HARTGARD' solution to provide the collectors, separate from the mains water stored in - . • ideal method of frost prevention, without the need the tank. ' for electrical energy input or special control valves. This development enables higher performance solar The Solahart 300LJ solar hot water system should be collectors to be coupled to the solar hot water system, installed in accordance with all local codes and and also eliminates concern about collector corrosion authority requirements. • • TECHNICAL DATA 300LJ . CAPACITY Storage tank 300 litres(80 gal.) Closed circuit (collectors 22 litres(6 gag) • and jacket) STORAGE TANK Empty 84 kg (185 lbs.) Full 397 kg(874 lbs.) SOLAR COLLECTORS Empty 2 at 40.0 kg ea.(88 lbs.) Full 2 at 43.5 kg ea.(96 lbs.) DIMENSIONS OF TANK Overall length' • 2290 mm(901 ' Overall height 510 mm(201 • Overall width 510 mm(201 Cylinder diameter 430 mm(171 • Jacket clearance 5 mm(0.2") • DIMENSIONS OF COLLECTORS Length 1942 mm ea.(76") . Width 1026 mm ea(40") Depth 80 mm ea.(3") • OVERALL SIZE OF INSTALLED Length 2456 mm(97') . SYSTEM Width . 2320 mm(921 Height__ 510 mm (201 Valve settings for hot water circuit ; Pressure limiting valve (water inlet) • 450 kPa (64 psi) • Expansion valve (water inlet) 600 kPa (85 psi) Pressure-temperature relief valve (on tank) 860 kPa (125 psi) 99°C (210°F) Normal operating pressure (storage tank) 600 kPa (85 psi) Sealed closed circuit ' ' Pressure relief valve 80 kPa(12 psi) Normal operating pressure range —10 to 60 kPa(9 psi) Safe pressure with empty tank - 100kPa(14 psi) • ELECTRICAL COMPONENTS The rating of the electrical element is shown on the nameplate of the storage tank. All electrical back . up heaters are designed for operation at 220V to 260V from single phase 50 Hz or 60 Hz electrical . . supplies. . Standard models Nominal rating 2,400 Watts • 240V- 10 Amps 220V --92 Amps " I.A.P.M.O. APPROVAL is-1834 • . • • 5 . • 7. INSTALLATION DIRECTLY ONTO A SLOPING ROOF (WITH PITCH/SLOPE) . WOOD SHAKE, SHINGLE OR • Fit the copper blanking disc (PN.0605) and brass COMPOSITION ROOFS collector nut (PN.0601) into the top right hand corner of the right hand collector. Fit the collector fill Select a suitable section of roof area approximately from matel om assembly(PN.1617)and collector nut(PN.0601)into 2.5 M x 2.5 M square and app Y the lower left hand corner of the left hand collector. the root ridge in a shade free area ._ Check in detail that the area selected is capable of Fit the collector hot pipe(PN.0710)to the top left hand supporting the weight of the installed Solahart system. corner of the left hand collector.Fit the collector down pipe (PN.0703) to the lower right hand corner of • Carry out any standard necessary ineeringal support as the right hand collector. - required by standard engineering calculations. Fix the collectors in place by attaching the collector Lay out four lengths of grade oolong locate x fur mm clamps (PN.0843) to the collector extrusion as per trusses exterior construction grade wood and locate four roof the exploded view Diagram No. 1. Permanently fix • covering.. Fix wood runners rs to beneath the roof ' the clamps in place with self-tapping screws. covering. Fix the wood runners-to them, running _ with the slope of the roof, and using 12 off 8 mm Position the storage tank on the roof above the diameter x 150 mm long lag bolts. Alternatively, 12 collectors, lining up the connection pipes. Fit the off suitably sized J bolts can be used in place of the connecting pipes to the storage tank, insuring each lags. (See Diagram No. 2) __ . - connection is fitted with a rubber 0 ring. • Insure that the 3 lag bolts or J bolts on each wood With the tank located in position and the closed circuit • runner are securely located in or around the trusses pipe connections made, fit the four aluminum tank or support members by checking in the ceiling space clamps (PN.0874) along the rear.foot or support • before and after drilling. Insure that sufficient water- moulding of the tank ink base se (see Diagram rag No. the • proofing en penetrations compound Is injected in and around any, collectors or pipework. Fix the tank by securing the proof ngicos p in the roofing its application n should water- P p proofing compound and its application should besuch four tank clamps to the wood runners with 8 mm that ABSOLUTELY NO WATER LEAKS through the diameter x 40 mm long lag bolts. - • roof will occur. The waterproofing should be capable Fit the pressure temperature relief valve (U101) of remaining intact through normal contraction and • Into the tank as per the exploded view Diagram No. 1. expansion of the root structure and covering.It should be a long-life type. Insure that the four wood runners Thoroughly inspect the entire installation to insure follow the slope of the roof and do not run across :_ that it is rigidly fixed down, all pipe connections are the slope of the roof, are parallel and in line by tightened, the tank and collectors are level and that -- measuring=outer=timbers corner-to-corner.The_ adequate waterproofing and sealing of all penetrations purpose of the wood runners is to provide a stable has been carried out. and level base on which to mount the Solahart system. It will also allow free flow of rain water down the roof Once this inspection has been carried out REMOVE slope and prevent damming against the high side of TANK BODY AND FIX PLASTIC ST CCOVE FROM THE the tank. ADHESIVE"SOLAHART" LOGO TO THE TOP LEFT Locate the collector support extrusion (PN.0829) HAND CORNER OF THE TANK. - - along the lower ends of the 50 mm x 100 mm wood WARNING: If plastic cover is left on the tank and runners. (Flat side of upstand facing the collectors.) Fix the collector support extrusion in place with four exposed to the sun for a few days it will bake onto the- ' 8 mm diameter x 40 mm lag bolts. Insure the location , aluminum and be impossible to remove.---- is level.. Install the 2 solar collectors in place, resting the SEPARATE THIS SECTION AT THE / i lower part of both collectors onto the collector HINGE H FIRMLY ON �j/ TANK extrusion with the wood runners supporting the TO TANK Fool. / collectors: l /�j/Ali Check and insure that each collector is fitted is—with 1 `- rubber 0 rings each Solahart (One spare Krieg-is_ _ ' provided in each Solahart Small Parts Kit.) - • r'� -pets Join both collectors with collector unions (PN.0694) W000 R NNe1 emma..4cnul applying medium pressure with spanner. Check DIAGRAM NO. 3 laves collector overhang beyond the collector extrusion - SECURING TANK is approximately-220 mm.each side-for esthetic_-_ TO WOOD RUNNER- - appearance. • 9 DIAGRAM NO. 2 WOOD SHAKE. SHINGLE OR COMPOSITION ROOFS (WITH PITCH/SLOPE) _ STORAGE - Collector extrusion supported TANK - - - - • . by and secured to wood runners . by 8 mm dia x 40 mm lag bolts. .. . ... .-. +- :-.. ..- -" .".. . . ." Collectors held down by - - collector clamps. - ., .«� _ y • ... ' COLLECTOR -.. 8 m diax40 mm lag boR: --� • through tank clamp to each _ .-. RpOF ' _ -. / 4 EXTERIOR CONSTRUCTION wood runner. TRH GRADE WOOD RUNNERS FOR w� 50 mmx100 mm • 8 mm dia x 150 mm lag or SUPPORT As_ ell _......._ J bolts total 3 each wood runner, Install 150 mm from ends and at mid- . length predrill and countersink. Completely water seal - - • each penetration. SECTION WITH ROOF P' i RAFTERS AT 610 mm CENTERS ( I I I . I4tY T7- d ... . • �J �J 50 x 100 WOOD RUNNERS • 610 mm 610 mm ON 4 ROOF MEMBERS. • SECTION WITH ROOF ' RAFTERS AT 400 mm CENTERS. F.:/SliMISVAIMISIV -MI ii i I . 50 x 100 WOOD RUNNERS ON 4 ROOF MEMBERS.=:__ 400 mm 400 mm _ • 10 - • • "� s7 CPT- ,,,,,,,,,0 CO - - cTCF.iC.S r- e:4T'::PA ZR T'C.:NS �'E - -