Loading...
HomeMy WebLinkAboutBuilding Miscellaneous 2013-6-27 FEI Page 1 of 1 • IfS1INGsINSPE7101 rxr. anm"n6ok& Construction Services Geotechniel&Construction Services Daily Field Report Client: Ms. Connie Speck Project: Giustina Resources Office Bldg. Date: 06-27-13 Giustina Resources 200 International Way Project No.: 2137002 PO Box 529 Springfield, Oregon Report No.: E-34263 Eugene, Oregon 97440 Inspector: D. Delatte ID No.: 1080867-88 ICC. Inspection of: Wedge Anchors, Nailing Weather: Overcast Continuous Inspection: ❑ Contractor: Chambers Construction Co. BP No.: 811-SPR2012-02519 Periodic Inspection: Q Observed the installation of ±fifty-five (55) 5/8" x 8 1/2" Hilti KBTZ (ICC ESR 1917) wedge anchors into slab on grade for shear wall sill plate connection along the perimeter or interior of building. Anchors were installed as replacements or additions at sill plate ends at perimeter of building and interior wall anchors were not cast in-place during slab pour. Prior to installation, the predrilled holes were blown out. Anchors were installed and tightened to 60 ft/lb. Verified installation torque with FEI's calibrated torque wrench. Verified installation of Glu-Lam bolts in two (2) locations at 6E and 4E. The 5/8" thru- bolts appear to be installed and tightened to snug-tight conditions. Verified the installation of A35, H3 and/or H2.5A truss clips at lower and upper roof lines except along line 2, from C to E at upper roof. Also, verified eleven (11) hold downs were installed with the Simpson HAD, HDB or HDC brackets screwed to studs or post. To the best of our knowledge, the work inspected was in accordance with RFP 15, Gibson Steel Fab. prints dated 12-19-12, Truss prints, e-mail from FOR about trusses and applicable workmanship provisions of the I.B.C., except if noted above. • Review ed By:✓✓ Michael L. Meyer Technical Manager • c: Chambers Construction Co.— Brian Erickson (email) Chambers Construction Co.—Jack Makarchek (email) Robertson Sherwood Architects—Scott Stolarczyk (email) City of Springfield MLM:sn This report and/or enclosed test data is the confidential property of the client to wham it is addressed and pertains to the specific process and/or material evaluated. As such,information contained herein shall not be reproduced in pan or full and/or any pad thereof be disclosed without FEI Testing 8 Inspection,Inc.'s written authorization. 750 NW Cornell Avenue•Corvallis,Oregon 97330 phone(541)7574698 fax(541)757-2991 29540 B Airport Road•Eugene,Oregon 97402•phone(541)684-3849•fax(541)684-3851 62979 NE Plateau Drive,Suite 3•Bend,Oregon 97701 phone(541)3824844•fax(541)382-4846 FEI Page 1 of 1 71.5711158/NSPfC r. Geolechnicol Construction Services Geotechnical&Construction Services Daily Field Report Client: Ms. Connie Speck Project: Giustina Resources Office Bldg. Date: 06-24-13 Giustina Resources 200 International Way Project No.: 2137002 PO Box 529 Springfield, Oregon Report No.: E-34218 Eugene, Oregon 97440 Inspector: D. Delatte ID No.: 1080867-88 ICC Inspection of: Wedge Anchors Weather: Inside Continuous Inspection: ❑ Contractor: Chambers Construction Co. BP No.: 811-SPR2012-02519 Periodic Inspection: 0 • • Observed the installation of twenty-five (25) Hilti KB2 wedge anchors into slab on grade for non-bearing sill plate connection around the perimeter of building. Anchors were installed as replacements or additions at sill plate ends or because of interference from studs. Note: Jack Makarchek (Chambers CC) contacted EOR regarding use of KB2 anchors in lieu of the KB-TZ anchors specified on prints. EOR stated KB2 anchors can be used on non-bearing walls only. KB-TZ anchors must be installed at shear wall locations. Prior to installation, the predrilled holes were blown out with air. Verified minimum embedment depth of 4 7/16". Anchors were installed and tightened to 60 ft.lbs. Installation torque was verified with FEI's calibrated torque wrench. To the best of our knowledge, the work inspected was in accordance with plans dated 12-19-12 and applicable workmanship provisions of the I.B.C., except if noted above. Reviewed By: Michael L. Meyer Technical Manager c: Chambers Construction Co.— Brian Erickson (email) Chambers Construction Co.—Jack Makarchek (email) Robertson Sherwood Architects— Scott Stolarczyk (email) City of Springfield MLM:sn • This report and/or enclosed test data is the confidential property of the client to whom it is addressed and pertains to the specific process and/or material evaluated. As such,information contained herein shall not be reproduced in part or full and/or any part thereof be disclosed without FEI Testing 8 Inspection, Inc.'s written authorization. 750 MN Candi Avenue•Corvallis,Oregon 97330 phone(541)757-1698•fax(541)757-2991 29540 B Airport Road•Eugene,Oregon 97402•phone(541)684-3849 fax(541)684-3851 62979 NE Plateau Drive,Suite 3•Bend,Oregon 97701 •phone(541)382-4844•fax(541)382-4846